JBL SB 200 (serv.man6) EMC - CB Certificate ▷ View online
Report No.: EM201200331-2 Application No.: ZJ00016958 Page 25 of 59
Project No.:
ZJ00016958
Probe:
N
Standard:
(CE)EN55022 class B_QP
Power Source:
AC 230V/50Hz
Test item:
Conduction Test
Date:
2012-7-24
Temp./Hum.(%RH): 22/46%RH
Time:
16:25:06
EUT: Soundbar
Model:
CINEMA SB200
Test Result:
Pass
Note:
Optical fiber mode
keep the product on the full volume to make sure the power is maximum
No.
Frequency
Reading
Correct
Result
Limit
Margin
Remark
(MHz)
(dBuV)
Factor(dB)
(dBuV)
(dBuV)
(dB)
1 0.1615 33.21 11.79 45.00
65.38
-20.38
QP
2 0.1615 18.41 11.79 30.20
55.38
-25.18 AVG
3 0.1932 30.98 11.22 42.20
63.89
-21.69
QP
4 0.1932 16.98 11.22 28.20
53.89
-25.69 AVG
5 0.5493 23.78 10.52 34.30
56.00
-21.70
QP
6 0.5493 15.78 10.52 26.30
46.00
-19.70 AVG
7 1.2555 19.67 10.53 30.20
56.00
-25.80
QP
8 1.2555 13.67 10.53 24.20
46.00
-21.80 AVG
9 3.8603 21.68 10.62 32.30
56.00
-23.70
QP
10 3.8603 14.38 10.62 25.00 46.00 -21.00
AVG
11 4.8224 23.59 10.71 34.30 56.00 -21.70
QP
12 4.8224 17.19 10.71 27.90 46.00 -18.10
AVG
Report No.: EM201200331-2 Application No.: ZJ00016958 Page 26 of 59
4.3 VOLTAGE FLUCTUATION AND FLICKS MEASUREMENT
4.3.1 LIMITS
Test standard: EN 61000-3-3:2008
Test Item
Limit
Remark
P
st
1.0
P
st
means short-term flicker indicator.
P
lt
0.65
P
lt
means long-term flicker indicator.
T
dt
(ms)
500
T
dt
means maximum time that dt exceeds 3 %.
d
max
(%)
4%
d
max
means maximum relative voltage change.
dc (%)
3.3%
dc means relative steady-state voltage change
4.3.2 TEST PROCEDURES
The EUT was placed on the top of a wooden table 0.8 meters above the ground and operated
to produce the most unfavorable sequence of voltage changes under normal operating
conditions.
to produce the most unfavorable sequence of voltage changes under normal operating
conditions.
During the flick measurement, the measure time shall include that part of whole operation
cycle in which the EUT produce the most unfavorable sequence of voltage changes. The
observation period for short-term flicker indicator is 10 minutes and the observation period
for long-term flicker indicator is 2 hours.
cycle in which the EUT produce the most unfavorable sequence of voltage changes. The
observation period for short-term flicker indicator is 10 minutes and the observation period
for long-term flicker indicator is 2 hours.
4.3.3 TEST SETUP
Harmonics &
Flicker
Analyzer
+
Power Source
EUT
Support
Power
Cord
Cord
0.8
m
Report No.: EM201200331-2 Application No.: ZJ00016958 Page 27 of 59
4.3.4 TEST RESULTS
Flicker Test Summary per EN/IEC61000-3-3 (Run time)
EUT: SOUNDBAR
Tested by: LIANG
Start time: 10:02:00
End time: 10:12:21
Test duration (min): 10 Data file name: F-000084.cts_data
Comment: keep the product on the full volume to make sure the power is maximum.
Customer: Customer information
Test Result: Pass
Comment: keep the product on the full volume to make sure the power is maximum.
Customer: Customer information
Test Result: Pass
Status: Test Completed
Pst
i
Limits
Plt and limit line
Parameter values recorded during the test:
Vrms at the end of test (Volt):
Vrms at the end of test (Volt):
230.06
Highest dt (%): 0.74
Test limit (%): 3.30 Pass
Time(mS) > dt: 0.0
Test limit (mS): 500.0
Pass
Highest dc (%): 0.00
Test limit (%): 3.30 Pass
Highest dmax (%):
-0.81
Test limit (%): 4.00 Pass
Highest Pst (10 min. period): 0.083 Test limit: 1.000 Pass
Highest Plt (2 hr. period): 0.036 Test limit: 0.650 Pass
Report No.: EM201200331-2 Application No.: ZJ00016958 Page 28 of 59
5. IMMUNITY TEST
5.1 GENERAL DESCRIPTION
Product Standard
ETSI EN 301 489-17 V2.1.1 (2009-05) & EN 301 489-1 V1.8.1(2008-04)
Test set-up
Test specification
ETSI EN 301 489-17
V2.1.1 & EN 301
489-1 V1.9.2
V2.1.1 & EN 301
489-1 V1.9.2
EN 61000-4-2
Electrostatic Discharge – ESD:
8kV air discharge, 4kV Contact discharge
Performance Criterion B
8kV air discharge, 4kV Contact discharge
Performance Criterion B
EN 61000-4-3
Radio-Frequency Electromagnetic Field Susceptibility
Test – RS:
80 ~1000 MHz, 1400~2700 MHz 3V/m, 80%
AM(1kHz),
Performance Criterion A
Test – RS:
80 ~1000 MHz, 1400~2700 MHz 3V/m, 80%
AM(1kHz),
Performance Criterion A
EN 61000-4-4
Electrical Fast Transient/Burst - EFT,
AC power Port: 1kV,
DC power Port: 0.5kV
Signal and control line: 0.5kV,
Performance Criterion B
AC power Port: 1kV,
DC power Port: 0.5kV
Signal and control line: 0.5kV,
Performance Criterion B
EN 61000-4-5
Surge Immunity Test:
1.2/50 us Open Circuit Voltage,
8 /20 us Short Circuit Current,
AC Power Port: line to earth: ±1kV, line to line: ±0.5kV
Performance Criterion B
1.2/50 us Open Circuit Voltage,
8 /20 us Short Circuit Current,
AC Power Port: line to earth: ±1kV, line to line: ±0.5kV
Performance Criterion B
EN 61000-4-6
Conducted Radio Frequency Disturbances Test –CS:
0.15 ~ 80 MHz, 3Vrms, 80% AM, 1kHz,
Performance Criterion A
0.15 ~ 80 MHz, 3Vrms, 80% AM, 1kHz,
Performance Criterion A
EN 61000-4-11
Voltage dips:
30 during 25 periods,
Meets the requirements of Performance Criterion C
Meets the requirements of Performance Criterion C
Voltage interruption:
100% during 0.5 cycles,
100% during 1 cycles,
100% during 1 cycles,
Meets the requirements of Performance Criterion B
100% during 250 cycles,
Meets the requirements of Performance Criterion C
Click on the first or last page to see other SB 200 (serv.man6) service manuals if exist.