DOWNLOAD JBL ON STAGE III IIIP (serv.man6) Service Manual ↓ Size: 1.89 MB | Pages: 66 in PDF or view online for FREE

Model
ON STAGE III IIIP (serv.man6)
Pages
66
Size
1.89 MB
Type
PDF
Document
EMC - CB Certificate
Brand
Device
Audio
File
on-stage-iii-iiip-sm6.pdf
Date

JBL ON STAGE III IIIP (serv.man6) EMC - CB Certificate ▷ View online

   
                                   Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E07439      page 37 of 66 
 
 
10.5.EUT Configuration 
The configuration of EUT are listed in Section 3.5. 
10.6.Operating Condition of EUT 
Same as Conducted Emission test which is listed in Section 3.6. except the test set up 
replaced by Section 10.2. 
10.7.Test Procedure 
The EUT and its simulators were placed on a the ground reference plane and were 
insulated from it by an wood support 0.1m + 0.01m thick. The ground reference 
plane was 1m*1m metallic sheet with 0.65mm minimum thickness. This reference 
ground plane was project beyond the EUT by at least 0.1m on all sides and the 
minimum distance between EUT and all other conductive structure, except the 
ground plane was more than 0.5m. All cables to the EUT was placed on the wood 
support, cables not subject to EFT/B was routed as far as possible from the cable 
under test to minimize the coupling between the cables. 
10.7.1.For input and AC power ports: 
The EUT was connected to the power mains by using a coupling device which 
couples the EFT interference signal to AC power lines. Both positive 
transients and negative transients of test voltage was applied during 
compliance test and the duration of the test can’t less than 2mins. 
10.7.2.For signal lines and control lines ports: 
It’s unnecessary to test. 
10.7.3.For DC input and DC output power ports: 
It’s unnecessary to test. 
10.8.Test Results 
PASS. 
 
The EUT was tested and all the test results are listed in next page. 
   
                                   Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E07439      page 38 of 66 
 
 
Electrical Fast Transient/Burst Test Results
 
Audix Technology (Shenzhen)Co., Ltd. 
Date : 07/26/2007 
Applicant 
: 
Harman Multimedia DBA 
Harman Motive Inc.
 
Test Date 
: 
Jul.12, 2007 
EUT 
: 
Computer Speaker System 
Temperature
: 
25
 
M/N 
: 
jbl on stage lll 
Humidity 
: 
50
 
Test Voltage 
: 
DC 12V Adaptor Input AC 
230V/50Hz 
Test Mode 
: 
Data Transmitting 
Test Engineer 
Shelle Criterion 
: B 
Pressure 
100.6KPa 
 
 
 
Inject Line 
Voltage 
kV 
Inject 
Time(s) 
Inject 
Method
Results
Inject 
Line 
Voltage 
kV 
Inject 
Time(s) 
Inject 
Method
Results
±
120 
Direct 
PASS 
     
±
120 
Direct 
PASS 
     
L N 
±
120 
Direct 
PASS 
     
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Test Equipment : 
Burst Tester(PEFT-JUNIOR) 
 
 
 
   
                                   Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E07439      page 39 of 66 
 
 
11. SURGE  TEST 
11.1. Test  Equipments 
Item  Equipment  Manufacturer Model No. 
Serial No.  Last Cal. 
Cal. Interval
1.    Surge Tester  HAEFELY 
PSURGE4.1  083519-12 May 11, 07  1 Year 
11.2. Block Diagram of Test Setup 
11.2.1.Block Diagram of the EUT 
 
 
 
 
 
 
 
 
 
 
 
 
 
  (EUT: Computer Speaker System) 
 
11.2.2.Surge Test Setup 
 
 
 
 
 
 
 
 
 
11.3.Test Standard 
EN 55024: 1998+A1: 2001+A2: 2003 (IEC 61000-4-5: 2001) 
(Severity Level Line to Line was Level 2 at 1kV) 
0.8 m 
AC Mains 
EUT and 
Support system
 
AC Mains
Test 
Generator 
PC  
AC Mains
 
Keyboard 
Mouse 
EUT 
AC Mains 
Monitor
a: Audio Cable 
b: USB Cable 
 : Core 
a
Adaptor
b
   
                                   Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E07439      page 40 of 66 
 
 
11.4.Severity Levels and Performance Criterion 
11.4.1.Severity level 
Severity Level 
Open-Circuit Test Voltage 
kV 




0.5 
1.0 
2.0 
4.0 
Special 
11.4.2.Performance criterion : B 
11.5.EUT Configuration 
The configuration of EUT are listed in Section 3.5. 
11.6.Operating Condition of EUT 
Same as Conducted Emission test which is listed in Section 3.6. except the test set up 
replaced by Section 11.2. 
11.7.Test Procedure 
1)  Set up the EUT and test generator as shown on Section 11.2.2. 
2)  For line to line coupling mode, provide a 1kV 1.2/50us voltage surge (at       
open-circuit condition) and 8/20us current surge to EUT selected points, and for 
active line / neutral line to ground are same except test level is 2kV. 
3)  At least 5 positive and 5 negative (polarity) tests with a maximum 1/min     
repetition rate are applied during test. 
4)  Different phase angles are done individually. 
5)  Record the EUT operating situation during compliance test and decide the EUT   
immunity criterion for above each test. 
11.8.Test Results 
PASS. 
 
The EUT was tested and all the test results are listed in next page. 
Page of 66
Display

Click on the first or last page to see other ON STAGE III IIIP (serv.man6) service manuals if exist.