JBL ON STAGE III IIIP (serv.man6) EMC - CB Certificate ▷ View online
Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E07439 page 37 of 66
10.5.EUT Configuration
The configuration of EUT are listed in Section 3.5.
10.6.Operating Condition of EUT
Same as Conducted Emission test which is listed in Section 3.6. except the test set up
replaced by Section 10.2.
replaced by Section 10.2.
10.7.Test Procedure
The EUT and its simulators were placed on a the ground reference plane and were
insulated from it by an wood support 0.1m + 0.01m thick. The ground reference
plane was 1m*1m metallic sheet with 0.65mm minimum thickness. This reference
ground plane was project beyond the EUT by at least 0.1m on all sides and the
minimum distance between EUT and all other conductive structure, except the
ground plane was more than 0.5m. All cables to the EUT was placed on the wood
support, cables not subject to EFT/B was routed as far as possible from the cable
under test to minimize the coupling between the cables.
insulated from it by an wood support 0.1m + 0.01m thick. The ground reference
plane was 1m*1m metallic sheet with 0.65mm minimum thickness. This reference
ground plane was project beyond the EUT by at least 0.1m on all sides and the
minimum distance between EUT and all other conductive structure, except the
ground plane was more than 0.5m. All cables to the EUT was placed on the wood
support, cables not subject to EFT/B was routed as far as possible from the cable
under test to minimize the coupling between the cables.
10.7.1.For input and AC power ports:
The EUT was connected to the power mains by using a coupling device which
couples the EFT interference signal to AC power lines. Both positive
transients and negative transients of test voltage was applied during
compliance test and the duration of the test can’t less than 2mins.
couples the EFT interference signal to AC power lines. Both positive
transients and negative transients of test voltage was applied during
compliance test and the duration of the test can’t less than 2mins.
10.7.2.For signal lines and control lines ports:
It’s unnecessary to test.
10.7.3.For DC input and DC output power ports:
It’s unnecessary to test.
10.8.Test Results
PASS.
The EUT was tested and all the test results are listed in next page.
Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E07439 page 38 of 66
Electrical Fast Transient/Burst Test Results
Audix Technology (Shenzhen)Co., Ltd.
Date : 07/26/2007
Applicant
:
Harman Multimedia DBA
Harman Motive Inc.
Harman Motive Inc.
Test Date
:
Jul.12, 2007
EUT
:
Computer Speaker System
Temperature
:
25
℃
M/N
:
jbl on stage lll
Humidity
:
50
%
Test Voltage
:
DC 12V Adaptor Input AC
230V/50Hz
230V/50Hz
Test Mode
:
Data Transmitting
Test Engineer
:
Shelle Criterion
: B
Pressure
:
100.6KPa
Inject Line
Voltage
kV
Inject
Time(s)
Inject
Method
Results
Inject
Line
Voltage
kV
Inject
Time(s)
Inject
Method
Results
L
±
1
120
Direct
PASS
N
±
1
120
Direct
PASS
L N
±
1
120
Direct
PASS
Test Equipment :
Burst Tester(PEFT-JUNIOR)
Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E07439 page 39 of 66
11. SURGE TEST
11.1. Test Equipments
Item Equipment Manufacturer Model No.
Serial No. Last Cal.
Cal. Interval
1. Surge Tester HAEFELY
PSURGE4.1 083519-12 May 11, 07 1 Year
11.2. Block Diagram of Test Setup
11.2.1.Block Diagram of the EUT
(EUT: Computer Speaker System)
11.2.2.Surge Test Setup
11.3.Test Standard
EN 55024: 1998+A1: 2001+A2: 2003 (IEC 61000-4-5: 2001)
(Severity Level : Line to Line was Level 2 at 1kV)
(Severity Level : Line to Line was Level 2 at 1kV)
0.8 m
AC Mains
EUT and
Support system
AC Mains
Test
Generator
PC
AC Mains
Keyboard
Mouse
EUT
AC Mains
Monitor
a: Audio Cable
b: USB Cable
: Core
b: USB Cable
: Core
a
Adaptor
b
Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E07439 page 40 of 66
11.4.Severity Levels and Performance Criterion
11.4.1.Severity level
Severity Level
Open-Circuit Test Voltage
kV
1
2
3
4
*
2
3
4
*
0.5
1.0
2.0
4.0
1.0
2.0
4.0
Special
11.4.2.Performance criterion : B
11.5.EUT Configuration
The configuration of EUT are listed in Section 3.5.
11.6.Operating Condition of EUT
Same as Conducted Emission test which is listed in Section 3.6. except the test set up
replaced by Section 11.2.
replaced by Section 11.2.
11.7.Test Procedure
1) Set up the EUT and test generator as shown on Section 11.2.2.
2) For line to line coupling mode, provide a 1kV 1.2/50us voltage surge (at
2) For line to line coupling mode, provide a 1kV 1.2/50us voltage surge (at
open-circuit condition) and 8/20us current surge to EUT selected points, and for
active line / neutral line to ground are same except test level is 2kV.
active line / neutral line to ground are same except test level is 2kV.
3) At least 5 positive and 5 negative (polarity) tests with a maximum 1/min
repetition rate are applied during test.
4) Different phase angles are done individually.
5) Record the EUT operating situation during compliance test and decide the EUT
5) Record the EUT operating situation during compliance test and decide the EUT
immunity criterion for above each test.
11.8.Test Results
PASS.
The EUT was tested and all the test results are listed in next page.
The EUT was tested and all the test results are listed in next page.
Click on the first or last page to see other ON STAGE III IIIP (serv.man6) service manuals if exist.