DOWNLOAD JBL ON STAGE III IIIP (serv.man6) Service Manual ↓ Size: 1.89 MB | Pages: 66 in PDF or view online for FREE

Model
ON STAGE III IIIP (serv.man6)
Pages
66
Size
1.89 MB
Type
PDF
Document
EMC - CB Certificate
Brand
Device
Audio
File
on-stage-iii-iiip-sm6.pdf
Date

JBL ON STAGE III IIIP (serv.man6) EMC - CB Certificate ▷ View online

   
                                   Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E07439      page 29 of 66 
 
 
7.  IMMUNITY PERFORMANCE CRITERIA DESCRIPTION   
Performance Level 
 
The test results shall be classified in terms of the loss of function or degradation of performance of the 
equipment under test, relative to a performance level by its manufacturer or the requestor of the test, or the 
agreed between the manufacturer and the purchaser of the product. 
 
Definition related to the performance level: 
1. Based on the used product standard 
2. Based on the declaration of the manufacturer, requestor or purchaser 
 
For EN55024 
Criterion A: 
Definition: normal performance within limits specified by the manufacturer, requestor and purchaser. 
The equipment shall continue to operate as intended without operator intervention. No degradation of 
performance or loss of function is allowed below a performance level specified by the manufacturer when 
the equipment is used as intended. The performance level may be replaced by a permissible loss of 
performance. If the minimum performance level or the permissible performance loss is not specified by the 
manufacturer, then either of these may be derived from the product description and documentation, and by 
what the user may reasonably expect from the equipment if used as intended. 
 
Criterion B: 
Definition: temporary loss of function or degradation of performance which ceases after the disturbance 
ceases, and from which the equipment under test recovers its normal performance, without operator 
intervention. 
After the test, the equipment shall continue to operate as intended without operator intervention. No 
degradation of performance or loss of function is allowed, after the application of the phenomena below a 
performance level specified by the manufacturer, when the equipment is used as intended. The performance 
level may be replaced by a permissible loss of performance. During the test, degradation of performance is 
allowed. However, no change of operating state or stored data is allowed to persist after the test. If the 
minimum performance level (or the permissible performance loss) is not specified by the manufacturer, then 
either of these may be derived from the product description and documentation, and by what the user may 
reasonably expect form the equipment if used as intended. 
 
Criterion C: 
Definition: temporary loss of function or degradation of performance, the correction of which requires 
operator intervention. 
Loss of function is allowed, provided the function is self-recoverable, or can be restored by the operation of 
the controls by the user in accordance with the manufacturer’s instructions. Functions, and/or information 
stored in non-volatile memory, or protected by a battery backup, shall not be lost. 
 
Criterion D: 
Definition: loss of function or degradation of performance, which is not recoverable, owing to damage to 
hardware or software, or loss of data. 
 
   
                                   Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E07439      page 30 of 66 
 
 
8.  ELECTROSTATIC DISCHARGE IMMUNITY TEST 
8.1. Test  Equipments 
Item  Equipment 
Manufacturer Model No. Serial No. 
Last Cal. 
Cal. Interval
1.    ESD Tester  EM Test 
Dito 
V0503100053 Mar.06, 07  1 Year 
8.2. Block Diagram of Test Setup 
8.2.1.Block Diagram of EUT Test Setup                                              
 
 
 
 
 
 
 
 
 
 
 
 
 
  (EUT: Computer Speaker System) 
 
8.2.2.Block Diagram of ESD Test Setup 
 
 
 
 
 
 
 
 
 
 
 
(EUT: Computer Speaker System ) 
8.3. Test  Standard 
EN 55024: 1998+A1:2001+A2: 2003 (IEC 61000-4-2: 2001) 
(Severity Level 3 for Air Discharge at 8kV,   
Severity Level 2 for Contact Discharge at 4kV) 
Remark:      is Discharge Electrode 
EUT and 
Support System
AC Mains 
AC Mains 
ESD 
Tester 
0.8 m 
PC  
AC Mains
Keyboard  
Mouse 
EUT 
AC Mains
Monitor
a: Audio Cable 
b: USB Cable 
 : Core 
a
Adaptor
b
   
                                   Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E07439      page 31 of 66 
 
 
8.4. Severity Levels and Performance Criterion 
8.4.1. Severity level 
Level Test 
Voltage 
Contact Discharge (kV)
Test Voltage 
Air Discharge (kV) 
1.  
2.  
3.  
4.  
15 
X Special 
Special 
8.4.2. Performance criterion : B 
8.5. EUT  Configuration 
The configuration of EUT are listed in Section 3.5. 
8.6. Operating Condition of EUT 
Same as radiated test which is listed in Section 4.6. except the test set up replaced by 
Section 8.2. 
8.7. Test  Procedure 
8.7.1. Air 
Discharge: 
The test was applied on non-conductive surfaces of EUT. The round discharge tip 
of the discharge electrode was approached as fast as possible to touch the EUT. 
After each discharge, the discharge electrode was removed from the EUT. The 
generator was    re-triggered for a new single discharge and repeated 20 times for 
each pre-selected test point. This procedure was repeated until all the air discharge 
completed 
8.7.2. Contact Discharge: 
All the procedure was same as Section 8.7.1. except that the generator was 
re-triggered for a new single discharge and repeated 50 times for each pre-selected 
test point. the tip of the discharge electrode was touch the EUT before the 
discharge switch was operated. 
8.8. Test  Results 
PASS. 
 
The EUT was tested and all the test results are listed in next page. 
 
   
                                   Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E07439      page 32 of 66 
 
 
Electrostatic Discharge Test Results
 
Audix Technology (Shenzhen) Co., Ltd. 
                                                      Date : 07/26/2007 
Applicant 
: 
Harman Multimedia DBA Harman 
Motive Inc.
 
Test Date 
: 
Jul.12, 2007 
EUT 
: 
Computer Speaker System 
Temperature
:  25
 
M/N 
: 
jbl on stage lll 
Humidity 
:  55
 
Test Voltage 
: 
DC 12V Adaptor Input AC 
230V/50Hz 
Test Mode 
: 
Data Transmitting 
Test Engineer 
Shelle Criterion 
: B 
Pressure 
100.6KPa 
 
 
 
Air Discharge: 
±
2kV 
±
4kV 
±
8kV    # For Air Discharge each Point Positive 10 times and negative 10   
                                                            times discharge. 
Contact Discharge: 
±
2kV 
±
4kV      # For Contact Discharge each point positive 25 times and   
                                                            negative 25 times discharge 
Location 
Kind 
A-Air Discharge 
C-Contact Discharge 
Result 
Slots 5 
points 
PASS 
Ports 3 
points 
PASS 
Buttons 2 
points 
PASS 
USB port 
1 point 
C/A 
PASS 
Matel plane 
4 points 
PASS 
HCP 4 
points 
PASS 
VCP of Front 
1 point 
PASS 
VCP of Rear 
1 point 
PASS 
VCP of Left 
1 point 
PASS 
VCP of Right 
1 point 
PASS 
 
 
Test Equipment : 
ESD Test dito 
 
Discharge should be considered on Contact and Air and Horizontal Coupling Plane (HCP) and Vertical Coupling 
Plane (VCP). 
 
 
Page of 66
Display

Click on the first or last page to see other ON STAGE III IIIP (serv.man6) service manuals if exist.