JBL ON BEAT RUMBLE (serv.man2) EMC - CB Certificate ▷ View online
Report No.: EM201200813-6 Application No.: ZJ00024740 Page 41 of 61
5.4.4 TEST RESULTS
EUT
Wireless high-power speaker for lighting connector
Mode Number
JBL OnBeat Rumble
Test date
2013-01-04
Voltage Supply
AC 230V/50Hz
Test Engineer
Liang
environment
Tem:23℃ Hum:48 %100kPa
Test mode:
1. Test the EUT in BT, BT(Loading), BT (Headset),BT(Headset and
Loading), Audio in, Audio in (Loading), Audio in (Headset), Audio in
(Headset and Loading), iPhone5, iPhone5 (Loading), iPhone5
(Headset), iPhone5 (Headset and Loading);
(Headset and Loading), iPhone5, iPhone5 (Loading), iPhone5
(Headset), iPhone5 (Headset and Loading);
2. Test the EUT in idle mode.
Frequency
(MHz)
Polarity
Azimuth
Field
Strength
(V/m)
Required
Passing
Performance
Actual
performance
Result
80 ~ 1000
V&H
Front
3
Criterion A
Criterion A* PASS
80 ~ 1000
V&H
Rear
3
Criterion A
Criterion A* PASS
80 ~ 1000
V&H
Right
3
Criterion A
Criterion A* PASS
80 ~ 1000
V&H
Left
3
Criterion A
Criterion A* PASS
1400 ~ 2700
V&H
Front
3
Criterion A
Criterion A* PASS
1400 ~ 2700
V&H
Rear
3
Criterion A
Criterion A* PASS
1400 ~ 2700
V&H
Right
3
Criterion A
Criterion A* PASS
1400 ~ 2700
V&H
Left
3
Criterion A
Criterion A* PASS
A*: There was no change compared with the initial operation during the test.
Report No.: EM201200813-6 Application No.: ZJ00024740 Page 42 of 61
5.5 ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST
5.5.1 TEST SPECIFICATION
Basic Standard
EN 61000-4-4: 2004+A1: 2010
Test Voltage
Electrical Fast Transient/Burst – EFT:
AC Power Port: ±1kV,Signal port ±0.5kV
Performance Criterion B
AC Power Port: ±1kV,Signal port ±0.5kV
Performance Criterion B
Polarity
Positive and Negative
Impulse Frequency
5 kHz
Impulse Wave-shape
5 ns/50ns for voltage
Burst Duration
15 ms
Burst Period
300 ms
Test Duration
2 minutes
5.5.2 TEST PROCEDURE
The EUT and its simulators shall be placed 0.1m high above the ground reference plane which is a min.
1m×1m metallic sheet with 0.65mm minimum thickness. This reference ground plane shall project
beyond the EUT by at least 0.1m on all sides and the minimum distance between EUT and all other
conductive structure, except the ground plane beneath the EUT, shall be more than 0.5m.
For input and AC power ports:
The EUT is connected to the power mains by using a coupling device which couples the EFT
interference signal to AC power lines. Both polarities of the test voltage should be applied during
compliance test and the duration of the test can’t less than 1min.
5.5.3 TEST SETUP
10 cm isolation
supporter
AC
input
EFT
Generator
EUT
AC
AC Line
Ground Reference Plane
0.5m
Report No.: EM201200813-6 Application No.: ZJ00024740 Page 43 of 61
5.5.4 TEST RESULTS
EUT
Wireless high-power speaker for lighting connector
Mode Number
JBL OnBeat Rumble
Test date
2013-01-04
Voltage Supply
AC 230V/50Hz
Test Engineer
Liang
environment
Tem:21℃ Hum:50 %100kPa
Test mode:
1. Test the EUT in BT, BT(Loading), BT (Headset),BT(Headset and
Loading), Audio in, Audio in (Loading), Audio in (Headset), Audio in
(Headset and Loading), iPhone5, iPhone5 (Loading), iPhone5 (Headset),
iPhone5 (Headset and Loading);
2. Test the EUT in idle mode.
Loading), Audio in, Audio in (Loading), Audio in (Headset), Audio in
(Headset and Loading), iPhone5, iPhone5 (Loading), iPhone5 (Headset),
iPhone5 (Headset and Loading);
2. Test the EUT in idle mode.
Test Point
Polarity
Test Level
(kV)
Required Passing
Performance
Actual
performance
Result
L
+/-
1
Criterion B
Criterion A*
PASS
N
+/-
1
Criterion B
Criterion A*
PASS
L–N
+/-
1
Criterion B
Criterion A*
PASS
A*: There was no change compared with the initial operation during the test.
Report No.: EM201200813-6 Application No.: ZJ00024740 Page 44 of 61
5.6 SURGE IMMUNITY TEST
5.6.1 TEST SPECIFICATION
Basic Standard:
EN 61000-4-5:2006
Wave-Shape:
CW 1.2µs/50µs
Test Voltage:
Line to line 0.5kV; line to PE 1kV
Generator Source Impedance:
Line to line 2ohm; line to PE 12ohm
Polarity:
Positive and Negative
Phase Angle:
0°, 90°, 180°, 270°
Pulse Repetition Rate:
60s
Number of Tests:
5 times
5.6.2 TEST PROCEDURE
a) For EUT power supply:
The surge is applied to the EUT power supply terminals via the capacitive coupling network. Decoupling
networks are required in order to avoid possible adverse effects on equipment not under test that may be
powered by the same lines, and to provide sufficient decoupling impedance to the surge wave. The power
cord between the EUT and the coupling/decoupling networks was shorter than 2 meters in length.
networks are required in order to avoid possible adverse effects on equipment not under test that may be
powered by the same lines, and to provide sufficient decoupling impedance to the surge wave. The power
cord between the EUT and the coupling/decoupling networks was shorter than 2 meters in length.
b) For test applied to unshielded un-symmetrically operated interconnection lines of EUT: The surge was
applied to the lines via the capacitive coupling. The coupling / decoupling networks didn’t influence the
specified functional conditions of the EUT. The interconnection line between the EUT and the
coupling/decoupling networks was shorter than 2 meters in length.
applied to the lines via the capacitive coupling. The coupling / decoupling networks didn’t influence the
specified functional conditions of the EUT. The interconnection line between the EUT and the
coupling/decoupling networks was shorter than 2 meters in length.
c) For test applied to unshielded symmetrically operated interconnection / telecommunication lines of
EUT:The surge was applied to the lines via gas arrestors coupling. Test levels below the ignition point of
the coupling arrestor were not specified. The interconnection line between the EUT and the
coupling/decoupling networks was shorter than 2 meters in length.
EUT:The surge was applied to the lines via gas arrestors coupling. Test levels below the ignition point of
the coupling arrestor were not specified. The interconnection line between the EUT and the
coupling/decoupling networks was shorter than 2 meters in length.
5.6.3 TEST SETUP
Click on the first or last page to see other ON BEAT RUMBLE (serv.man2) service manuals if exist.