JBL ON BEAT RUMBLE (serv.man2) EMC - CB Certificate ▷ View online
Report No.: EM201200813-6 Application No.: ZJ00024740 Page 49 of 61
5.8 VOLTAGE DIP & VOLTAGE INTERRUPTIONS
5.8.1 TEST SPECIFICATION
Basic Standard
EN 61000-4-11:2004
Test duration time
Voltage dips:
30 during 25 periods,
Meets the requirements of Performance Criterion C
Meets the requirements of Performance Criterion C
Voltage interruption:
100% during 0.5 cycles,
100% during 1 cycles,
100% during 1 cycles,
Meets the requirements of Performance Criterion B
100% during 250 cycles,
Meets the requirements of Performance Criterion C
Interval between event
10s for each dips at each test angle
Phase Angle
0°
Test cycle
3
5.8.2 TEST PROCEDURE
a) The EUT and test generator were setup as shown on Section
b) The interruptions is introduced at selected phase angles with specified duration.
c) Record any degradation of performance.
5.8.3 TEST SETUP
Report No.: EM201200813-6 Application No.: ZJ00024740 Page 50 of 61
5.8.4 TEST RESULTS
EUT
Wireless high-power speaker for lighting connector
Mode Number
JBL OnBeat Rumble
Test date
2013-01-04
Voltage Supply
AC 230V/50HZ
Test Engineer
Liang
environment
Tem:20℃ Hum:51 %100kPa
Test mode:
1. Test the EUT in BT, BT(Loading), BT (Headset),BT(Headset and
Loading), Audio in, Audio in (Loading), Audio in (Headset), Audio in
(Headset and Loading), iPhone5, iPhone5 (Loading), iPhone5
(Headset), iPhone5 (Headset and Loading);
(Headset and Loading), iPhone5, iPhone5 (Loading), iPhone5
(Headset), iPhone5 (Headset and Loading);
2. Test the EUT in idle mode.
Voltage
(% Reduction)
Duration
(Period)
Angle
Actual
performance
Test Result
Voltage
dips
30% 25 0° A* PASS
Voltage
interruptions
100% 0.5 0° A* PASS
Voltage
interruptions
100% 1 0° A* PASS
Voltage
interruptions
100% 250 0° C* PASS
Note: A*: There was no change compared with initial operation during the test.
C* is within the acceptable criterion for Voltage Dips and Interruption test.
Report No.: EM201200813-6 Application No.: ZJ00024740 Page 51 of 61
APPENDIX A: PHOTOGRAPH OF THE TEST CONFIGURATION
RE (Blowe 1GHz)
RE (Above 1GHz)
Report No.: EM201200813-6 Application No.: ZJ00024740 Page 52 of 61
CE
Flicker
Click on the first or last page to see other ON BEAT RUMBLE (serv.man2) service manuals if exist.