JBL ON BEAT MINI EMC - CB Certificate ▷ View online
Page 24 of 44
Report No. : W13-950-006
IEC
60950-1
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. IEC60950_1C
Korea Testing Certification
5.3.2 Motors
N/A
5.3.3 Transformers
N/A
5.3.4 Functional
insulation ............................................. :
See appended table 5.3.
Complies with c)
Complies with c)
P
5.3.5 Electromechanical
components
N/A
5.3.6 Audio
amplifiers in ITE ......................................... :
See appended table 4.3.4 an
d 4.3.5 of IEC 60065
d 4.3.5 of IEC 60065
P
5.3.7
Simulation of faults
See appended table 5.3
P
5.3.8 Unattended
equipment
N/A
5.3.9
Compliance criteria for abnormal operating and
fault conditions
fault conditions
No flame emitted, no molten
material emitted, no
deformation of enclosure
material emitted, no
deformation of enclosure
P
5.3.9.1
During the tests
No fire propagated beyond
the equipment. No molten
metal was emitted.
the equipment. No molten
metal was emitted.
P
5.3.9.2
After the tests
No hazards.
P
6
CONNECTION TO TELECOMMUNICATION NETWORKS
N/A
6.1
Protection of telecommunication network service persons, and users of other
equipment connected to the network, from hazards in the equipment
equipment connected to the network, from hazards in the equipment
N/A
6.1.1
Protection from hazardous voltages
N/A
6.1.2
Separation of the telecommunication network from earth
N/A
6.1.2.1
Requirements
No TNV circuit.
N/A
Supply
voltage
(V) ................................................ :
Current in the test circuit (mA) ........................... :
6.1.2.2 Exclusions ............................................................ :
N/A
6.2
Protection of equipment users from overvoltages on telecommunication
networks
networks
N/A
6.2.1 Separation
requirements
N/A
6.2.2
Electric strength test procedure
N/A
6.2.2.1 Impulse
test
N/A
6.2.2.2 Steady-state
test
N/A
6.2.2.3 Compliance
criteria
N/A
6.3
Protection of the telecommunication wiring system from overheating
N/A
Max. output current (A) ........................................ :
Current
limiting method ........................................ :
Page 25 of 44
Report No. : W13-950-006
IEC
60950-1
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. IEC60950_1C
Korea Testing Certification
7
CONNECTION TO CABLE DISTRIBUTION SYSTEMS
N/A
7.1
General
Not connected to Cable
Distribution System.
Distribution System.
N/A
7.2
Protection of cable distribution system service
persons, and users of other equipment connected
to the system, from hazardous voltages in the
equipment
persons, and users of other equipment connected
to the system, from hazardous voltages in the
equipment
N/A
7.3
Protection of equipment users from overvoltages
on the cable distribution system
on the cable distribution system
N/A
7.4
Insulation between primary circuits and cable
distribution systems
distribution systems
N/A
7.4.1 General
N/A
7.4.2
Voltage surge test
N/A
7.4.3 Impulse
test
N/A
A
ANNEX A, TESTS FOR RESISTANCE TO HEAT AND FIRE
N/A
A.1
Flammability test for fire enclosures of movable
equipment having a total mass exceeding 18 kg,
and of stationary equipment (see 4.7.3.2)
equipment having a total mass exceeding 18 kg,
and of stationary equipment (see 4.7.3.2)
Not used.
N/A
A.1.1 Samples
................................................................
:
Wall thickness (mm) .............................................. :
A.1.2
Conditioning of samples; temperature (
C) ......... : N/A
A.1.3
Mounting of samples ............................................ :
N/A
A.1.4
Test flame (see IEC 60695-11-3)
N/A
Flame A, B, C or D ............................................... :
A.1.5 Test
procedure
N/A
A.1.6 Compliance
criteria
N/A
Sample 1 burning time (s) ..................................... :
Sample 2 burning time (s) ..................................... :
Sample 3 burning time (s) ..................................... :
A.2
Flammability test for fire enclosures of movable equipment having a total mass not
exceeding 18 kg, and for material and components located inside fire enclosures
(see 4.7.3.2 and 4.7.3.4)
exceeding 18 kg, and for material and components located inside fire enclosures
(see 4.7.3.2 and 4.7.3.4)
N/A
A.2.1 Samples,
material ................................................. :
Wall thickness (mm) .............................................. :
A.2.2
Conditioning of samples; temperature (°C) ......... :
N/A
A.2.3
Mounting of samples ............................................ :
N/A
Page 26 of 44
Report No. : W13-950-006
IEC
60950-1
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. IEC60950_1C
Korea Testing Certification
A.2.4
Test flame (see IEC 60695-11-4)
N/A
Flame A, B or C ................................................... :
A.2.5 Test
procedure
N/A
A.2.6 Compliance
criteria
N/A
Sample 1 burning time (s) ..................................... :
Sample 2 burning time (s) ..................................... :
Sample 3 burning time (s) ..................................... :
A.2.7
Alternative test acc. to IEC 60695-11-5, cl. 5 and 9
N/A
Sample 1 burning time (s) ..................................... :
Sample 2 burning time (s) ..................................... :
Sample 3 burning time (s) ..................................... :
A.3
Hot flaming oil test (see 4.6.2)
N/A
A.3.1
Mounting of samples
N/A
A.3.2
Test procedure
N/A
A.3.3 Compliance
criterion
N/A
B
ANNEX B, MOTOR TESTS UNDER ABNORMAL CONDITIONS (see 4.7.2.2 and
5.3.2)
5.3.2)
N/A
B.1 General
requirements
N/A
Position
................................................................
:
Manufacturer ........................................................ :
Type
.....................................................................
:
Rated
values ....................................................... :
B.2 Test
conditions
N/A
B.3 Maximum
temperatures
N/A
B.4
Running overload test
N/A
B.5
Locked-rotor overload test
N/A
Test
duration
(days) ............................................. :
Electric strength test: test voltage (V) .................. :
B.6
Running overload test for d.c. motors in secondary
circuits
circuits
N/A
B.6.1 General
N/A
B.6.2 Test
procedure
N/A
B.6.3
Alternative test procedure
N/A
B.6.4
Electric strength test; test voltage (V) .................. :
N/A
Page 27 of 44
Report No. : W13-950-006
IEC
60950-1
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. IEC60950_1C
Korea Testing Certification
B.7
Locked-rotor overload test for d.c. motors in
secondary circuits
secondary circuits
N/A
B.7.1 General
N/A
B.7.2
Test procedure
N/A
B.7.3
Alternative test procedure
N/A
B.7.4
Electric strength test; test voltage (V) ................. :
N/A
B.8
Test for motors with capacitors
N/A
B.9
Test for three-phase motors
N/A
B.10
Test for series motors
N/A
Operating
voltage (V) ........................................... :
C
ANNEX C, TRANSFORMERS (see 1.5.4 and 5.3.3)
N/A
Position
................................................................
:
Manufacturer ........................................................ :
Type
.....................................................................
:
Rated
values ....................................................... :
Method of protection ............................................. :
C.1 Overload
test
N/A
C.2 Insulation
N/A
Protection from displacement of windings ............ :
N/A
D
ANNEX D, MEASURING INSTRUMENTS FOR TOUCH-CURRENT TESTS
(see 5.1.4)
(see 5.1.4)
N/A
D.1 Measuring
instrument
N/A
D.2
Alternative measuring instrument
N/A
E
ANNEX E, TEMPERATURE RISE OF A WINDING (see 1.4.13)
N/A
F
ANNEX F, MEASUREMENT OF CLEARANCES AND CREEPAGE DISTANCES
(see 2.10 and Annex G)
(see 2.10 and Annex G)
N/A
G
ANNEX G, ALTERNATIVE METHOD FOR DETERMINING MINIMUM
CLEARANCES
CLEARANCES
N/A
G.1 Clearances
N/A
G.1.1 General
N/A
G.1.2
Summary of the procedure for determining
minimum clearances
minimum clearances
N/A
Click on the first or last page to see other ON BEAT MINI service manuals if exist.