DOWNLOAD JBL CS680 (serv.man2) Service Manual ↓ Size: 2.48 MB | Pages: 59 in PDF or view online for FREE

Model
CS680 (serv.man2)
Pages
59
Size
2.48 MB
Type
PDF
Document
EMC - CB Certificate
Brand
Device
Audio
File
cs680-sm2.pdf
Date

JBL CS680 (serv.man2) EMC - CB Certificate ▷ View online

 
Page 45 of 47 
Report Ref No.: 614380 
IEC 60065 
Clause 
Requirement + Test 
 
Result - Remark 
Verdict
 
16.3b 
(16.4b) 
Delete “Subclause 3.1 of IEC Publication 60227-
2: Part 2: Test Methods“ and insert “Subclause 
9.1 of SS 236“: 
9.1 Flexing test (except for tinsel cords, twisted 
twin and single core cords). The test shall be 
carried out by means of the apparatus shown in 
Figure 5. This apparatus has a carrier C 
supporting two pulleys A and B arranged so that 
the cord is horizontal between the pulleys. The 
carrier moves backward and forward over a 
distance of 1 m at an approximately constant 
speed of 0.33 m/s. 
A sample of flexible cord about 5 m long shall be 
stretched over the pulleys as shown in the figure, 
each end being loaded with a weight. The weight 
and the diameter of the pulleys A and B shall be 
given in Table 1. 
Screen cords in accordance with Table 7 shall be 
tested before application of the screen and outer 
sheath. 
The pulleys shall have a semi-circular shaped 
groove for circular cords and a flat groove for 
parallel twin cords. The restraining clamps D shall 
be fixed so that the pull is always applied by the 
weight from which the carrier is moving away. 
The carrier shall make 30 000 backward and 
forward movements (60 000 single strokes). Each 
conductor of the sample shall be loaded with the 
current specified in Table 2. 
For twin cords and for light PVC-sheated 3-core 
cords, the voltage between the conductors shall 
be approximately 230 V a.c. For all other cords 
having three or more cores a three-phase a.c. 
voltage of about 400 V shall be applied to three 
conductors, any additional conductors being 
connected to the neutral. 
During the test no open-circuit in any core or 
short-circuit between cores shall occur. 
 P 
 
Page 46 of 47 
Report Ref No.: 614380 
IEC 60065 
Clause 
Requirement + Test 
 
Result - Remark 
Verdict
 
 
 
After the test, any sheath on cords having three 
or more cores shall be removed. The cord, or the 
laid up cores, shall then withstand the voltage test 
specified in Subclause 8.2 or 8.3 as appropriate, 
but with a test voltage not exceeding 2000 V. 
TABLE 1, TABLE 2, FIGURES 4 and  5, see the  
CB BULLETIN 
 N/A 
* in parenthesis: clauses acc. to IEC 60065:1993 
 
 
Page 47 of 47 
Report Ref No.: 614380 
IEC 60065 
Clause 
Requirement + Test 
 
Result - Remark 
Verdict
 
 
 
 
National differences  KOREA 
IEC 60065, 6
th
 edition 
 
CB Bulletin KR 2005 I
 
 
5.101 Addition 
Other marking; 
Wording “            “ ( See the CB Bulletine) or an 
information regulated in IEC Publication 60417 
giving high voltage warning to layman shall be 
marked, if an apparatus contains a part more 
than 600 volts. 
 
N/A 
15.1.1 
Plugs for the connection of the apparatus to the 
supply mains and socket outlets for providing 
mains power to other apparatus shall comply with 
the Korean requirements (KSC 8300 and 8305). 
 P 
31 
Radio frequency Interference 
The apparatus shall comply with the relevant 
CISPR requirements. (EMC=EMI + EMS) 
Not checked 
N/A 
 
 
1(6)
 
614380 (CS80SUB-230) 
 
 
614380 (CS80SUB-230) 
 
Page of 59
Display

Click on the first or last page to see other CS680 (serv.man2) service manuals if exist.