August 10, 2006
Harman Multimedia Go + Play EMC Test Report
2006 060635 EMC
25 of 80
4.9. Electrical Fast Transient Immunity: IEC 61000-4-4: 2004
This test injects a transient/burst interference onto the AC/DC power supply and signal I/O lines. Testing was
performed in accordance with IEC 61000-4-4. The standard configuration for “type tests” outlined in IEC
61000-4-4 is used. For further information, please refer to the technical sections in the IEC 61000-4-4 in
addition to the test results section and photographs of the test set-up provided in this report.
Nemko USA, Inc.
11696 Sorrento Valley Road, Suite F, San Diego, CA 92121
Phone (858) 755-5525 Fax (858) 452-1810
DATE
DOCUMENT NAME
DOCUMENT #
PAGE
August 10, 2006
Harman Multimedia Go + Play EMC Test Report
2006 060635 EMC
26 of 80
Figure 6. EFT Immunity Test Setup Diagram
NOT TO SCALE
CONFIGURATION LEGEND
1. Test Laboratory (6 x 7 meters)
2. Ground
Plane
3. Power Strip for Peripherals from power line filter
4. DC Power for Devices
5. Capacitive Coupling Clamp (grounded)
6. Mains Power for EUT
7. AC Power for Fast Transient Noise Generator (120V)
8. Fast Transient Noise Generator
9. Coupling
4. DC Power for Devices
5. Capacitive Coupling Clamp (grounded)
6. Mains Power for EUT
7. AC Power for Fast Transient Noise Generator (120V)
8. Fast Transient Noise Generator
9. Coupling
Network
10. 10cm Non-Conducting Platform
11. EUT
12. Associated System
11. EUT
12. Associated System
1
10
2
3
4
9
8
6
7
5
11
10
12
Nemko USA, Inc.
11696 Sorrento Valley Road, Suite F, San Diego, CA 92121
Phone (858) 755-5525 Fax (858) 452-1810
DATE
DOCUMENT NAME
DOCUMENT #
PAGE
August 10, 2006
Harman Multimedia Go + Play EMC Test Report
2006 060635 EMC
27 of 80
4.10. Power Line Surge Immunity: IEC 61000-4-5: 2005
This test simulates a lightning event by inducing transients onto the AC/DC power supply lines in common
and differential mode. Testing was performed in accordance with IEC 61000-4-5.
Each device was tested in a total of three surge configurations:
Surge #1: Combination Wave, Line to Protective Earth with 9uF and 10Ohm, common mode, generator
earthed.
Surge #2: Combination Wave, Neutral to Protective Earth with 9uF and 10Ohm, common mode,
generator earthed.
Surge #3: Combination Wave, Line to Neutral with 18uF, differential mode, generator floated.
For further information, please refer to the technical sections in the IEC 61000-4-5 in addition to the test
results section and photographs of the test set-up provided in this report.
For further information, please refer to the technical sections in the IEC 61000-4-5 in addition to the test
results section and photographs of the test set-up provided in this report.
Nemko USA, Inc.
11696 Sorrento Valley Road, Suite F, San Diego, CA 92121
Phone (858) 755-5525 Fax (858) 452-1810
DATE
DOCUMENT NAME
DOCUMENT #
PAGE
August 10, 2006
Harman Multimedia Go + Play EMC Test Report
2006 060635 EMC
28 of 80
Figure 7. Power Line Surge Immunity Test Setup Diagram
NOT TO SCALE
CONFIGURATION LEGEND
1. Test
Laboratory
2. AC power for Devices
3. Power strip for associated devices from power line filter
4. Copper Ground Plane
5. Surge
3. Power strip for associated devices from power line filter
4. Copper Ground Plane
5. Surge
Generator
6. Surge Coupling Network
7. Nonconductive tables 80cm above Ground Plane
8. EUT
7. Nonconductive tables 80cm above Ground Plane