Sony GV-D1000 Service Manual ▷ View online
2-5
GV-D1000/D1000E
2-4. BOTTOM CABINET ASSEMBLY,
FP-571 FLEXIBLE BOARD (V/L RECHARGEABLE BATTERY)
VC-275
Board
6
Open the jack lid assembly
in the direction of the arrow
B
.
4
Three MI screws
(M2
×
4) (H)
7
Bottom cabinet assembly
5
MI screw
(M2
×
4) (H)
3
Three MI screws
(M2
×
4) (H)
8
Tapping screw
(+k 2
×
6)
0
FP-571 flexible board (4P)
(V/L rechargeable battery)
9
Remove the lithium lid in the
direction of the arrow
C
.
B
2
Press the release button to remove
the cabinet lid assembly in the
direction of the arrow
direction of the arrow
A
.
1
Open the LCD panel little.
C
A
A
B
C
D
A
B
C
D
9
Three screws (M2
×
3),
lock ace, p2
0
Three screws (M2
×
3),
lock ace, p2
qd
Switch cover assembly
qs
Claw
qf
DBB button
7
FP-569 flexible board
(26, 32P)
8
FP-247 flexible board
(50P)
6
Harness (EP-51)
3
Harness (PL-53)
2
FP-570 flexible board
(40P)
1
Two FP-404 flexible boards
(60P)
4
FP-602 flexible board
(5P)
5
Flexible flat cable
(5P)
A
Flexible board (from DRUM HEAD) (10P)
B
Flexible board (from MD MOTOR) (10P)
C
Flexible board (from MD SENS) (27P)
D
Flexible board (from MD CAP) (27P)
qa
Remove the VC-275 board
in the direction of the arrow.
2-5. VC-275 BOARD
2-6
GV-D1000/D1000E
2-6. BATTERY TERMINAL BOARD
2
Two MI screws
(M2
×
4) (H)
4
Battery panel assembly
5
Battery terminal board
3
Battery frame
1
MI screw
(M2
×
4) (H)
2-7. FP-575 FLEXIBLE BOARD (LANC), PR-41 BOARD, IO-69 BOARD
A
A
0
Two MI screws
(M2
×
4) (H)
4
Cabinet (R)
qd
IO-69 board
(Note)
9
PR-41 board
qs
Jack frame
6
FP-575 flexible board (6P)
qa
Screw (M2
×
3),
lock ace, p2
7
Screw (M2
×
3),
lock ace, p2
5
Screw (M2
×
3),
lock ace, p2
1
Three tapping screws
(B2
×
6)
8
Board to board connector
(10P)
3
Five tapping screws
(B2
×
6)
2
FP-247 flexible board
(50P)
Note:
To remove the IO-69 board,
remove the PR-41 board beforehand.
2-7
GV-D1000/D1000E
2-8. MS-95 BOARD
2-9. MECHANISM DECK
2
Two screws (M2
× 3),
lock ace, p2
4
MS-95 board
3
Two FP-404
flexible boards (60P)
1
FP-405 flexible board
(10P)
A
A
3
Harness (EX-CB)
MD frame
Ferrite bead
FC holder
PRECAUTION DURING
INSTALLATION
INSTALLATION
1
Screw (M2
× 3),
lock ace, p2
5
Tapping screw
(B2
× 6)
6
Tapping screw
(B2
× 6)
4
Two tapping screws
(B2
× 6)
qa
Three screws (M1.4
× 1.5)
2
Screw (M1.4
× 1.5)
qs
MD frame
7
FP-405 flexible board
(10P)
qg
Mechanism deck
qf
Cassette compartment
cover
8
Ferrite bead
9
Screw (M2
× 3),
lock ace, p2
qd
Two screws (M1.7
× 3),
lock ace, p2
0
FC holder
2-8
GV-D1000/D1000E
2-10.EJ-35 BOARD
A
7
Screw (M2
×
3),
lock ace, p2
8
EJ-35 board
6
Harness (PL-53)
4
Four tapping screws
(B2
×
6)
5
Lid frame assembly
1
Two MI screws
(M2
×
4) (H)
2
Cassette lid assembly
3
Press the cassette EJECT button
in the direction of the arrow
A
and open the Lid frame assembly.
Click on the first or last page to see other GV-D1000 service manuals if exist.