Sony DSC-W300 (serv.man2) Service Manual ▷ View online
2-13
DSC-W300_L2
1
Screws
3
Screws
1
New Barrier Assy
New Barrier Assy
Contacts of Parts
1
Install the new barrier assy and fix it temporarily with two screws so that it can move slightly.
2
Install temporarily the new ornamental ring (A) and adjust the position of barrier assy.
*The top sides of barrier assy and ornamental ring should be flat.
Take care for contacts of parts not to conflict each other.
3
Remove the new ornamental ring (A) once and tighten firmly it again with two screws with extra torque.
*Tightening torque=0.059
±
0.01N•m(0.6
±
0.1kgf•cm)
4
Affix the new barrier tape and then install the new ornamental ring (A).
New Ornamental
Ring (A)
Ring (A)
2
New Ornamental
Ring (A)
3
New Ornamental Ring (A)
4
New Ornamental Ring (A)
4
New Barrier Tape
2
Adjust the position of barrier assy.
2-5-2. HOW TO INSTALL THE BARRIER ASSY
2-14
DSC-W300_L2
5
New Light Interception
Ring
Apply the glue to
the side of cam ring.
the side of cam ring.
6
New Ornamental
Ring (B)
7
Old Ornamental
Ring (B)
7
Rubber band
New Ornamental
Ring (B)
Ring (B)
New Ornamental
Ring (B)
Ring (B)
Old Ornamental
Ring (B)
Ring (B)
5
Install the new light interception ring.
Note:
Install the new light interception ring, facing its shining side down.
6
Apply the glue to the side of cam ring and install the new ornamental ring (B) while rotating it to spread the glue.
Note:
Use adhesive (Super X) or an equivalent article.
Don't use what becomes white after drying like a quick-drying glue.
7
Install the old ornamental ring (B) in the reverse direction. Fix it with a rubber band and leave for 30 minutes as is.
Note:
Load of about 500g.
Install the light interception
ring, facing its shining side down.
ring, facing its shining side down.
2-15E
DSC-W300_L2
qa
Naruto Shaft
qa
Naruto Washer
qa
Naruto Gear (S)
qa
Screws
qa
Zoom (1210)
Gear Block Assy
8
Remove the rubber band and the old ornamental ring (B).
9
Remove two screws, zoom (1210) gear block assy, naruto gear (S), naruto washer, naruto shaft in order.
q;
Rotate the gear of cam ring to retract the lens barrel into the camera body, and confirm that the front of camera is flat.
qa
With the lens barrel retracted into the camera body, install the naruto shaft, naruto washer, naruto gear (S) and zoom
(1210) gear block assy in order, and the fix the zoom (1210) gear block assy with two screws.
*Tightening torque=0.049
±
0.01N•m(0.5
±
0.1kgf•cm)
9
Naruto Shaft
9
Naruto Washer
9
Naruto Gear (S)
9
Screws
9
Zoom (1210)
Gear Block Assy
Confirm that the front
of camera is flat.
of camera is flat.
8
Rubber band
8
Old Ornamental
Ring (B)
Naruto
Washer
Washer
Install the naruto washer in the direction
shown in the figure.
shown in the figure.
q;
Gear of Cam Ring
HELP
DSC-W300_L2
HELP
Sheet attachment positions and procedures of processing the flexible boards/harnesses are shown.
SW-534 Flexible Board
Attach the cabinet (G) block while pushing down SW-534 flexible board and the
flexible board (from LCD) in the arrow direction.
flexible board (from LCD) in the arrow direction.
Be sure to solder within 1.0 mm height.
Flexible Board
(from LCD)
(from LCD)
Cabinet (G) Block
HELP01
Flexible Board
(from Back Light)
(from Back Light)
Solderling Point
(1.0 mm height maximum)
(1.0 mm height maximum)
HELP02
Click on the first or last page to see other DSC-W300 (serv.man2) service manuals if exist.