Sony CMT-HPZ7 / CMT-HPZ9 / HCD-HPZ7 / HCD-HPZ9 Service Manual ▷ View online
37
HCD-HPZ7/HPZ9
2-44. SPR-P (LOCK)
3
lever (lock)
3
SPR-P (lock)
1
SPR-P (lock)
1
claw
2
lever (lock)
2
Hold the both ends of the SPSR-P
(lock) with two claws.
4
Pick up the SPR-P (lock) from
the claw and hook it on the lever.
PRECAUTION DURING LEVER INSTALLATION
38
HCD-HPZ7/HPZ9
SECTION 3
ASSEMBLY
• This is can be assemble according to the following sequence.
3-1. ASSEMBLY FLOW
3-2. ASSEMBLING OF THE
STOCKER SECTION (Page 39)
3-4. ASSEMBLING OF THE GEAR
(STOCK ROT LONG) (LEFT) (Page 41)
3-5. CONFIRMING THE ASSEMBLING
OF THE STOCKER SECTION (Page 42)
3-13. CONFIRMING THE ASSEMBLING
OF THE ARM SECTION (Page 50)
3-6. ASSEMBLING OF THE GEAR
(STOCK ROTARY LEFT) (Page 43)
3-7. ASSEMBLING OF THE GEAR
(STOCK ROTARY RIGHT) (Page 44)
3-9. ASSEMBLING OF THE GEAR
(SUB GEAR PIN RIGHT) (Page 46)
(SUB GEAR PIN RIGHT) (Page 46)
3-10. ASSEMBLING OF THE LEVER
(SUB GEAR BACK R) (Page 47)
3-11. ASSEMBLING OF THE
SUB GEAR (IDLER) (Page 48)
3-12. ASSEMBLING OF THE
SUB GEAR (2 STEP) (Page 49)
3-3. ASSEMBLING OF THE GEAR
(STOCK ROT SHORT) (RIGHT) (Page 40)
3-8. ASSEMBLING OF THE LEVER
(SUB GEAR BACK L) (Page 45)
39
HCD-HPZ7/HPZ9
6
stocker (1) assy
2
stocker (1) assy
3
stocker (2) assy
7
stocker (2) assy
5
tow claws
4
tow dowels
8
stocker (3) assy
9
stocker (4) assy
0
stocker (5) assy
UPPER
SIDE
SIDE
1
Repeat the steps
4
to
6
, when installing the part
(2), (3), (4) and (5) of the stocker assy.
1
Check the number on each stocker assy,
before assembling all the assys.
3-2. ASSEMBLING OF THE STOCKER SECTION
40
HCD-HPZ7/HPZ9
3-3. ASSEMBLING OF THE GEAR (STOCK ROT SHORT) (RIGHT)
FRONT
SIDE
SIDE
4
gear (stock rot short)
2
gear (stock rot short)
8
screw (1.7)
7
two screws (2
×
6)
6
stock box (R)
PRECAUTION DURING GEAR (STOCK ROT SHORT) INSTALLATION
gear (stock rot short)
gear (stock rot short)
5
Adjusting the two stockers
3
Adjusting the one stockers
UPPER
SIDE
SIDE
short
Note:
Install the stock box (R) right after
finishing the phase adjustment.
Install the stock box (R) right after
finishing the phase adjustment.
1
Align the edges of the stockers. Keep the position of
the stockers until finishing installation of the gear
(stock rot short) and the stock box (R).
(stock rot short) and the stock box (R).
Click on the first or last page to see other CMT-HPZ7 / CMT-HPZ9 / HCD-HPZ7 / HCD-HPZ9 service manuals if exist.