Sony BDV-E780W / BDV-E980W / BDV-E985W / HBD-E780W / HBD-E980W / HBD-E985W Service Manual ▷ View online
HBD-E780W/E980W/E985W
9
NOTE OF REPLACING THE IC3100 AND IC3200 ON
THE AMP BOARD AND THE COMPLETE AMP BOARD
When IC3100 and IC3200 on the AMP board and the complete
AMP board are replaced, it is necessary to spread the compound
(THERMAL COMPOUND (G747)) (Part No. J-2501-221-A ) be-
tween parts and heat sink.
Spread the compound referring to the fi gure below.
THE AMP BOARD AND THE COMPLETE AMP BOARD
When IC3100 and IC3200 on the AMP board and the complete
AMP board are replaced, it is necessary to spread the compound
(THERMAL COMPOUND (G747)) (Part No. J-2501-221-A ) be-
tween parts and heat sink.
Spread the compound referring to the fi gure below.
– AMP Board (Component Side) –
IC3200
IC3100
IC3100
IC3200
CHECKING METHOD OF NETWORK OPERATION
It is necessary to check the network operation, when replacing the
MB-141 board. Check the operation of wireless and wired LAN,
according to the following method.
It is necessary to check the network operation, when replacing the
MB-141 board. Check the operation of wireless and wired LAN,
according to the following method.
1. Checking Method of Wireless LAN Operation
(HBD-E780W/E980W
(HBD-E780W/E980W
only)
Check that access point is recognized surely.
Necessary Equipment:
Wireless access point with router function (AP)
Wireless access point with router function (AP)
Procedure:
1. Press the [HOME] button on the remote commander to enter
1. Press the [HOME] button on the remote commander to enter
the home menu.
2. Press
the
[
m]/[M]/[<]/[,] buttons on the remote command-
er to select “Network Settings”
“Internet Settings”, and press
the [
] button on the remote commander.
3. Press the [
m]/[M] buttons on the remote commander to select
“Wireless Setup (built-in)”, and press the [
] button on the
remote commander.
4. Press the [
m]/[M] buttons on the remote commander to select
“Scan”, and press the [
] button on the remote commander.
5. The system starts searching for access points, and displays a
list of up available network name (SSID).
6. Check that access point (SSID) is displayed on the searching
result.
Note: Refer to the instruction manual about details of the setting method.
2. Checking method of wired LAN operation
Check that access point is recognized surely.
Check that access point is recognized surely.
Procedure:
1. Connect the main unit to the router or the hub, etc. with the
1. Connect the main unit to the router or the hub, etc. with the
LAN cable.
2. Press the [HOME] button on the remote commander to enter
the home menu.
3. Press
the
[
m]/[M]/[<]/[,] buttons on the remote command-
er to select “Network Settings”
“Internet Settings”, and press
the [
] button on the remote commander.
4. Press the [
m]/[M] buttons on the remote commander to select
“Wired Setup”, and press the [
] button on the remote com-
mander.
5. Press
the
[
m]/[M]/[<]/[,] buttons on the remote command-
er to select “Auto”, and press the [
] button on the remote
commander.
6. Press the [
,] button on the remote commander.
7. Press the [
m]/[M] buttons on the remote commander to select
“Save & Connect”, and press the [
] button on the remote
commander.
8. When “Internet Settings is now complete.” appears, then press
the [
] button on the remote commander.
9. Press the [HOME] button on the remote commander to enter
the home menu.
10. Press the [
m]/[M]/[<]/[,] buttons on the remote command-
er to select “Network Settings”
“Internet Settings”, and press
the [
] button on the remote commander.
11. Press the [
m]/[M] buttons on the remote commander to select
“Network Connection Diagnostics”, and press the [
] button
on the remote commander.
12. Press the [
<]/[,] buttons on the remote commander to
select “Start”, and press the [
] button on the remote com-
mander.
13. Check that IP address can be acquired.
Note: Refer to the instruction manual about details of the setting method.
Ver. 1.2
HBD-E780W/E980W/E985W
10
HOW TO OPEN THE TRAY WHEN POWER SWITCH TURN OFF
Note 1: After the left panel (E1) is removed, this work is done.
Note 2: Please prepare the thin wire (clip etc. processed to the length of 8 cm or more).
Note 2: Please prepare the thin wire (clip etc. processed to the length of 8 cm or more).
SERVICE POSITION
3
tray
1
Remove the left panel (E1).
(Illustration of disassembly is omitted.)
2
Insert the clip etc.
tray
BD drive
Insert the clip etc.
processed to the
length of 8 cm or
more in the hole
on the side of the
chassis and push.
processed to the
length of 8 cm or
more in the hole
on the side of the
chassis and push.
8 cm or more
hole
–
Side view
–
–
Top view
–
Note: Push after it inserts it in this hole well.
FL board
POWER_SIRCS board
MB-141 board
AMP board
switching regulator
(SWR1)
(SWR1)
BD drive
(BPX-6)
(BPX-6)
HBD-E780W/E980W/E985W
11
SECTION 2
DISASSEMBLY
•
This set can be disassembled in the order shown below.
2-1. DISASSEMBLY FLOW
Note: Follow the disassembly procedure in the numerical order given.
2-2. LEFT PANEL (E1), RIGHT PANEL (E1)
2-2. LEFT PANEL (E1), RIGHT PANEL (E1)
(Page
(Page
11)
SET
2-4. TOP PANEL BLOCK
(Page
(Page
12)
2-15. HOW TO BEND FFC
(Page
(Page
20)
2-14. OPTICAL PICK-UP BLOCK (KEM-470AAA),
WIRE (FLAT TYPE)
(Page
19)
2-5. FL
BOARD
(Page
13)
2-10. WS BOARD
(Page
(Page
15)
2-7. WIRELESS LAN CARD
(WLC1)
(WLC1)
(E780W/E980W)
(Page
14)
2-12. SWITCHING REGULATOR
(SWR1)
(Page
(SWR1)
(Page
17)
2-11. AMP BOARD
(Page
(Page
16)
2-9. BD DRIVE (BPX-6)
(Page
(Page
15)
2-8. TOP LID BLOCK
(Page
(Page
14)
2-6. FRONT PANEL BLOCK
(Page
(Page
13)
2-3. LOADING
PANEL
ASSY
(E1)
(Page
(Page
12)
2-13. MB-141 BOARD
(Page
(Page
18)
1
screw (BV3)
2
eight claws
4
left panel (E1)
2
eight claws
1
screw (BV3)
3
3
4
right panel (E1)
Ver. 1.2
HBD-E780W/E980W/E985W
12
2-4. TOP PANEL BLOCK
2-3. LOADING PANEL ASSY (E1)
3
four claws
4
loading panel
assy
(E1)
1
Insert the clip etc.
2
tray
BD drive
Insert the clip etc.
processed to the
length of 8 cm or
more in the hole
on the side of the
chassis and push.
processed to the
length of 8 cm or
more in the hole
on the side of the
chassis and push.
8 cm or more
hole
–
Side view
–
–
Top view
–
Note: Push after it inserts it in this hole well.
1
two screws (BV3)
5
top panel block
2
ten claws
4
connector
(CN03)
1
two screws (BV3)
3
Lift after doing the slide in
the direction of the arrow.
5
top panel block
2
ten claws
4
connector
(CN03)
Click on the first or last page to see other BDV-E780W / BDV-E980W / BDV-E985W / HBD-E780W / HBD-E980W / HBD-E985W service manuals if exist.