DOWNLOAD Sharp LC-32DV200E Service Manual ↓ Size: 5.91 MB | Pages: 90 in PDF or view online for FREE

Model
LC-32DV200E
Pages
90
Size
5.91 MB
Type
PDF
Document
Service Manual
Brand
Device
TV / LCD
File
lc-32dv200e.pdf
Date

Sharp LC-32DV200E Service Manual ▷ View online

2. REMOVAL OF DVD DECK PARTS
NOTE
1.
Disassemble only the DVD DECK PARTS parts listed
here. Minute adjustments are needed if the
disassembly is done. If the repair is needed except
listed parts, replace the DVD MECHA ASS'Y.
2-1: TRAVERSE ASS'Y/LOADING MOTOR PCB ASS'Y/
        PLATE TRVS UD (Refer to Fig. 2-1-A)
1.
Remove the screw (1).
2.
Remove the screw (2).
2.2:  INSULATOR (R)/FEED RACK ASS'Y/
3.
Unlock the 5 supports (3).
       PCB630/GEAR MIDDLE/GEAR FEED/
4.
Remove the Insulator (R) from the Loader Ass'y.
       FEED MOTOR/GEAR MOTOR
5.
Remove the Traverse Ass'y and Plate Trvs Ud.
       (Refer to Fig. 2-2-A)
1.
Remove the Insulator (R).
2.
Remove the screw (1).
3.
Remove the Feed Rack Ass'y.
4.
Unlock the 2 supports (2).
5.
Remove the PCB630.
6.
Remove the screw (3).
7.
Remove the Gear Feed.
8.
Remove the Gear Middle.
9.
Remove the 2 screws (4).
DISASSEMBLY INSTRUCTIONS
Traverse Ass'y
Insulator (R)
(1)
(2)
Plate TRVS UD
(3)
(3)
Fig. 2-1-C
Check Lock
B2-1
9.
Remove the 2 screws (4).
10. Remove the Gear Motor.
11. Remove the Feed Motor.
• Screw Torque: 1.0 ± 0.3kgf•cm (screw(1))
• Screw Torque: 3.0 ± 0.3kgf•cm (screw(2))
NOTE
1.
In case of the Traverse Ass'y installation, hook the wire
on the Loader Ass'y as shown Fig. 2-1-B to Fig. 2-1-C.
• Screw Torque: 1.3 ± 0.3kgf•cm (Screw (1))
• Screw Torque: 2.5 ± 0.3kgf•cm (Screw (3))
• Screw Torque: 1.0 ± 0.3kgf•cm (Screw (4))
                       Loader Ass'y (Top side)
Loader Sub Ass'y
( )
(3)
(3)
Fig. 2-1-A
Fig. 2-1-B
Check Lock
Check Lock
Check Lock
(3)
Chassis 
Feed Motor
Gear Middle
(4)
(3)
Gear Feed
(2)
(1)
PCB630
Feed Rack Ass'y
Gear Motor
Fig. 2-2-A
Insulator (R)
B2-1
NOTE
1.
In case of the Gear Motor installation, check if the value
of the Fig. 2-2-B is correct.
2.
When installing the wire of the PCB630 install it correctly
as Fig. 2-2-C.
Manual soldering conditions
• Soldering temperature: 350 ± 5
o
C
• Soldering time: Within 4 seconds
• Soldering combination: Sn-3.0Ag-0.5Cu
3.
When installing the Feed Rack Ass'y, push both ends to
align the teeth as shown Fig. 2-2-D. Then install it.
4.
In case of the Insulator (R) installation, install correctly as
Fig. 2-2-E.
5.
After the assembly of the Traverse Ass'y, hook the wire
on the Traverse Ass'y as shown Fig. 2-2-F.
• In case of remove FEED MOTOR that has to arrange wire as following
                                                               7.0 ± 0.1mm
the picture on above.
2.3: GEAR ROLLER/LUMIRROR WASHER/
       ROLLER CONE/SHAFT ROLLER/
       LOADING MOTOR PCB/LOADING MOTOR/
       GEAR WORM/RACK LEVER (Refer to Fig. 2-3-B)
DISASSEMBLY INSTRUCTIONS
                                Insulator (R)
Gear Motor
Feed Motor
Safety surface for pressing of the insert.
Fig. 2-2-B
Fig. 2-2-E
Traverse Ass'y (Top Side)
Fig. 2-2-F
Check Hook
Traverse Ass'y
Check Hook
UP SIDE
BOTTOM
B2-2
      
1.
Remove the 3 screws (1).
          ~FEED MOTOR~
2.
Remove the Chassis Main Ass'y.
3.
Remove the Roller Ass'y.
4.
Remove the Gear Roller.
5.
Remove the Lumirror Washer.
                                             • Install wire from (1) to (4) in order.
6.
Remove the Roller Cone.
7.
Remove the Shaft Roller .
8.
Remove the screw (2).
9.
Remove the Loading Motor PCB Ass'y.
10. Remove the screw (3).
11. Remove the Loading Motor.
12. Remove the Gear Worm.
13. Remove the Rack Lever.
NOTE
1.
When Chassis Main Ass'y is removed, it is necessary to 
change the position of Lever Disc and Guide Disc.
2.
In case of the Chassis Main Ass'y, check position Lever 
Disc, Lever Guide and Boss of Rack Disc Sensor as shown
Feed Rack Ass'y
Fig. 2-3-A.
                                       • Remove the Lever Guide in the direction of arrow.
                                   (OK)         (NG)
PCB630
Fig. 2-2-C
Push
Push
Fig. 2-2-D
~FEED MOTOR~
WHITE(3)
BROWN(4)
GREEN(1)
YELLOW(2)
Fig. 2-3-A
Check Boss
Check Position
Chassis Main Ass'y
Frame Main Ass'y
Lever Guide
B2-2
• Install wire from (1) to (2) in order.
          RED(2)
          BLACK(1)          
                                (OK)            (NG)
• Screw Torque: 3.0 ± 0.3kgf•cm (Screw (1))
• Screw Torque: 0.8 ± 0.3kgf•cm (Screw (2))
DISASSEMBLY INSTRUCTIONS
Loading Motor PCB Ass'y
Lumirror Washer
Roller Cone
Rack Lever
Shaft Roller
Roller Cone
Lumirror Washer
Gear Roller 
Chassis Main Ass'y
Frame Main Ass'y
(1)
(1)
(1)
(3)
Loading Motor
Gear Worm
(2)
Loading Motor PCB Ass'y
Fig. 2-3-D
Roller Sub Ass'y
Fig. 2-3-E
Roller Sub Ass'y
B2-3
• Screw Torque: 0.8 ± 0.3kgf•cm (Screw (2))
• Screw Torque: 1.0 ± 0.3kgf•cm (Screw (3))
                                                      (OK)           (NG)
NOTE
1.
In case of the Gear Worm installation, check if the value
of the Fig. 2-3-C is correct.
2.
When installing the wire of the Loading Motor PCB Ass'y, 
install it correctly as Fig. 2-3-D.
Manual soldering conditions
• Soldering temperature: 350 ± 5
o
C
• Soldering time: Within 4 seconds
• Soldering combination: Sn-3.0Ag-0.5Cu
3.
In case of the Roller Cone installation, install correctly as
Fig. 2-3-E.
4.
In case of the Lumirror Washer installation, 
install correctly as Fig. 2-3-F.
                                                   1.8 + 0, - 0.1mm
5.
In case of the Gear Roller installation, check if the value
of the Fig. 2-3-G is correct.
6.
After the assembly of the Loader Sub Ass'y, hook the wire
on the Loader Sub Ass'y as shown Fig. 2-3-H.
 
                                               
                                                                             14.3 + 0, - 0.1mm
                        Loader Sub Ass'y
Fig. 2-3-B
Gear Worm
Loading Motor
Safety surface for pressing of the insert.
Fig. 2-3-C
Fig. 2-3-G
Roller Sub Ass'y
Fig. 2-3-F
Fig. 2-3-H
Check Hook
Check Hook
Safety surface for 
pressing of the insert.
B2-3
2.4: SPRING SHUTTER/PLATE RETAINER/
       RETAINER SHUTTER/COVER CLAMPER/
       PLATE CLAMPER/MAGNET CLAMPER/
       CLAMPER/GUIDE DISC/LEVER DISC/
       SPRING LEVER GUIDE/SPRING LEVER DISC/
       LEVER DISC (Refer to Fig. 2-4-A)
1.
Unlock the support (1).
2.
Remove the Retainer Shutter Ass'y.
3.
Remove the Spring Shutter.
4.
Remove the 3 screws (2).
5.
Remove the Plate Retainer.
6.
Remove the Retainer Shutter.
7.
Unlock the 2 supports (3).
8.
Remove the Cover Clamper.
9.
Unlock the 3 supports (4).
10. Remove the Plate Clamper.
               (OK)                        (NG)
11. Remove the Magnet Clamper.
12. Remove the Clamper.
13. Unlock the support (5).
14. Remove the Guide Disc.
15. Remove the Lever Guide.
                                               
16. Remove the Spring Lever Guide.
17. Remove the Spring Lever Disc.
18. Remove the Lever Disc.
DISASSEMBLY INSTRUCTIONS
                                 Spring Shutter (2pcs)
                             Clamper Ass'y
Fig. 2-4-B
Check Hook
Frame Main Ass'y
Retainer Shutter
B2-4
                                               
2-5: FFC WIRE HANDLING
1. When installing the FFC, fold it correctly and install it as
shown from Fig. 2-5-A to Fig. 2-5-D.
NOTE
1. Do not make the folding lines except the specified
positions for the FFC.
• Screw Torque: 0.7 ± 0.3kgf•cm (Screw (2))
NOTE
                                                                              35 ± 1mm
1.
In case of the Retainer Shutter Ass'y installation, 
check if the value of the Fig. 2-4-B is correct.
                                                 Fold
2.
In case of the Clamper Ass'y installation, 
check if the value of the Fig. 2-4-C is correct.
  [ 22 pin FFC ]                                   
Guide Disc
Frame Mian
Spring Lever Disc
(5)
(2)
Lever Disc
Lever Guide
Spring Lever Guide
Cover Clamper
Plate Clamper
Magnet Clamper
Clamper
(2)
(2)
Retainer Shutter
Spring Shutter
Fig. 2-4-A
Fig. 2-4-C
Fig. 2-5-A
Printing Surface
Plate Retainer
(1)
(3)
(4)
Check Hook
B2-4
Page of 90
Display

Click on the first or last page to see other LC-32DV200E service manuals if exist.