DOWNLOAD Sharp MX-6580N / MX-7580N (serv.man4) Service Manual ↓ Size: 50.67 MB | Pages: 127 in PDF or view online for FREE

Model
MX-6580N MX-7580N (serv.man4)
Pages
127
Size
50.67 MB
Type
PDF
Document
Service Manual
Brand
Device
Copying Equipment / Installation Manual (Revised June 2017).
File
mx-6580n-mx-7580n-sm4.pdf
Date

Sharp MX-6580N / MX-7580N (serv.man4) Service Manual ▷ View online

MX-7580N  MX-RB12 (PAPER PASS UNIT)  11 – 3
4)
Install the band (Packed items No.12), and fix the screw
(Packed items No.2) to the front cover.
E. Installation of the toner bottle
1)
Install the toner bottle, and close the front cover.
1
2
1
2
Y
M
C
BK
MX-7580N  MX-FN19 (FINISHER (50 sheets binding))  12 – 1
 
MX-7580N
Service Manual
 
[12] MX-FN19 (FINISHER (50 sheets binding))
Since the illustrations of the former models are used, they may differ from the actual cases.
1.  Unpacking
A. Removal of the finisher
NOTE: For removal of the finisher, manpower of two persons or
more is required.
1)
Remove the fixing material, and remove the top case.
2)
Remove the bundled items from packing cushion.
3)
Holding the upper part of the saddle stitch finisher by two peo-
ple, pull up the saddle stitch finisher, and make it stand upright.
(Be careful to sliding worker's foot.)
4)
Remove the skid and packing cushions.
5)
One person tilt the finisher, another person remove the lower
tray.
6)
Remove the other side similarly.
MX-7580N  MX-FN19 (FINISHER (50 sheets binding))  12 – 2
B. Removal of the protection material
1)
Remove the fixing tapes and protection material.
2)
Open the front upper door, and remove the fixing tapes and
protection material.
3)
Remove the screws and remove the fixing material for the
paper exit tray. (four positions)
C. Packed items check
No.
Name
Quantity
1
Binding head round tapping M4 x 8
2
2
IT tapping M4 x 20
2
3
Binding head M4 x 12
4
4
Step screw
2
5
Rail
1
6
Rail reception sheet metal
1
7
Connection fixture F (for x3)
1
8
Connection fixture R (for x3)
1
9
Staple position label (For scanner)
1
10
Staple position label (For DSPF)
1
11
Punch position label (For scanner)
1
12
Punch position label (For DSPF)
1
13
Cushion (S)
1
14
Cushion (M)
1
15
Cushion (L)
1
1
2
3
6
4
5
7
8
9
11
12
10
13
15
14
X3
X3
MX-7580N  MX-FN19 (FINISHER (50 sheets binding))  12 – 3
2.  Installation
NOTE: When the finisher is installed, first install the paper pass
unit, and then install the finisher.
NOTE: When the finisher and punch unit is installed at the same
time, first install the punch unit, and then install the finisher.
A. Installation of the rail
1)
Install the rail (Packed items No.5) to the finisher with the fixing
screws (Packed items No.1).
2)
Install the rail reception sheet metal (Packed items No.6) to the
main unit with the fixing screws (Packed items No.2).
B. Installation of the connection fixture F/R
1)
Install the connection fixture R (Packed items No.8) to the
main unit with the fixing screws (Packed items No.3).
2)
Install the connection fixture F (Packed items No.7) to the main
unit with the fixing screws (Packed items No.3).
C. Attaching the cushion
1)
Attach the cushion (S) (Packed items No.13), the cushion (M)
(Packed items No.14) and the cushion (L) (Packed items
No.15) to the position indicated in the figure.
Cushion A 
attachment 
position
Cushion B 
attachment 
position
Cushion C 
attachment 
position
Cushion A attachment 
reference (Front edge of 
the relay path left 
cabinet)
Cushion A attachment 
reference (Upper side of 
the groove in the relay 
path left cabinet)
Cushion B attachment 
reference (Upper edge 
of the machine left 
cabinet)
Cushion B attachment 
reference (Rear edge of 
the handle hole)
Cushion C attachment 
reference (Front edge of 
the upper cushion)
Cushion C attachment 
reference (Upper edge of the 
machine left lower cabinet)
Page of 127
Display

Click on the first or last page to see other MX-6580N / MX-7580N (serv.man4) service manuals if exist.