DOWNLOAD Sharp MX-6580N / MX-7580N (serv.man4) Service Manual ↓ Size: 50.67 MB | Pages: 127 in PDF or view online for FREE

Model
MX-6580N MX-7580N (serv.man4)
Pages
127
Size
50.67 MB
Type
PDF
Document
Service Manual
Brand
Device
Copying Equipment / Installation Manual (Revised June 2017).
File
mx-6580n-mx-7580n-sm4.pdf
Date

Sharp MX-6580N / MX-7580N (serv.man4) Service Manual ▷ View online

MX-7580N  MX-TU14 (EXIT TRAY CABINET)  10 – 1
MX-7580N
Service Manual
 
[10] MX-TU14 (EXIT TRAY CABINET)
1.  Unpacking
A. Packed items check
2.  Installation
NOTE: Before installation, be sure to turn both the operation and
main power switches off and disconnect the power plug
from the power outlet. Make double sure that the data lamp
on the operation panel does not light up or blink when per-
forming installation.
A. Paper exit tray attachment
1)
Fix the rear cover with the screws.
2)
Fix the front right cover with the screws.
Hook the front right cover.  
3)
Fix the exit tray cabinet to the machine with the screw (Packed
items). 
No.
Name
Quantity
1
Exit tray cabinet
1
2
Front cover
1
3
Paper holding arm
1
4
Full detection actuator
1
5
Screw
6
6
E-ring
1
7
Rear  cover
1
8
Front right cover
1
MX-7580N  MX-TU14 (EXIT TRAY CABINET)  10 – 2
Fit the rib part to the hole of the rear cover.  .  
B. Front cover attachment
1)
Attach the front cover, and fix it with the E-ring.
C. Paper holding arm and full detection actuator 
attachment
1)
Attach the paper holding arm and the full detection actuator.
 
MX-7580N  MX-RB12 (PAPER PASS UNIT)  11 – 1
MX-7580N
Service Manual
 
[11] MX-RB12 (PAPER PASS UNIT)
1.  Unpacking
A. Packed items check
2.  Installation
NOTE: Before installation, be sure to turn both the operation and
main power switches off and disconnect the power plug
from the power outlet. Make double sure that the data lamp
on the operation panel does not light up or blink when per-
forming installation.
A. Deliverly sponge removal
1)
Remove the deliverly sponge from the paper exit section as
the figure below.
NOTE: When removing the delivery sponge roller, take care not to
fall the fragment of it.
NOTE: If the fragment was fallen, never fail to remove it.
B. Installation of the accuride rail
1)
Fix the L plate (Packed items No.5) to the main unit with the
screw (Packed items No.1).
2)
Install the front cover right (Packed items No.8), and fix the
screw (Packed items No.1).
No.
Name
Quantity
1
M4 x 7 round-head bind screw
13
2
M4 x 10 mold tap screw
2
3
M4 x 10 S-tight bind screw
1
4
E-ring
1
5
L plate
1
6
Accuride rail
1
7
Paper guide
1
8
Front cover right
1
9
Front cover
1
10
Left cabinet
1
11
Relay unit
1
12
Band
2
1
2
3
4
5
6
7
8
9
10
11
12
1
2
2
2
1
MX-7580N  MX-RB12 (PAPER PASS UNIT)  11 – 2
3)
Install the paper guide (Packed items No.7), and fix the screw
(Packed items No.3).
4)
Engage the accuride rail (Packed items No.6) to cut-out por-
tion of main frame. 
Install the accuride rail while pressing so that engage the pro-
jection of the main unit frame with the hole in rear side of the
accuride rail. Fix the accuride rail with the screw (Packed items
No.1).
C. Installation of the left cabinet
1)
Insert the rib of the left cabinet (Packed items No.10) into the
slit on the lower surface of the upper cabinet left. Fix the left
cabinet with the screw (Packed items No.1).
D. Installation of the paper pass unit
1)
Pull out the slide rails.
2)
Place the paper pass unit on the slide rails, and fix it with the
screw (Packed items No.1). 
Push the paper pass unit into the main unit to install.
3)
Insert the front cover (Packed items No.9) to the supporting
point, and fix it with a E-ring (Packed items No.4).
1
2
1
2
1
2
2
2
2
2
2
1
1
2
Page of 127
Display

Click on the first or last page to see other MX-6580N / MX-7580N (serv.man4) service manuals if exist.