Sharp PN-R903 Handy Guide ▷ View online
Precautions in installing and handling 2
Worker position, assignment of work and cautions at lifting up the display.
Please wear gloves and safety shoes when you lift up this display.
For lifting up the display
5
people is required. (Ex. Moving display from the package to wheeled cart.)
Following the image below, please check the position and assignment for each worker.
WorkerA;
Hold the top handle with left hand.
Hold the side(short side) of the
main body with right hand.
Hold the top handle with left hand.
Hold the side(short side) of the
main body with right hand.
WorkerE;
Hold the top handle with right hand.
Hold the side(short side) of the main
body with left hand.
Hold the top handle with right hand.
Hold the side(short side) of the main
body with left hand.
y
g
W
k
B
W
k
C
WorkerD;
PN-R903 Installation Guidelines <Rev1.0> February 2013
CONFIDENTIAL
12
WorkerB;
Hold the side(short side) of the main body
with left hand.
Hold the bottom handle with right hand.
Hold the side(short side) of the main body
with left hand.
Hold the bottom handle with right hand.
WorkerC;
Hold the underside of the
main body with both hands.
Hold the underside of the
main body with both hands.
WorkerD;
Hold the side(short side) of the main body
with right hand.
Hold the bottom handle with left hand.
Hold the side(short side) of the main body
with right hand.
Hold the bottom handle with left hand.
Precautions in vertical orientation installing and handling 1
Precautions in vertical orientation installing and handling
Please wear gloves and safety shoes when you lift up this display.
F
lifti
th di l
5
l i
i d
d f
i t lli
th di l
i
ti l
i t ti
6
l i
i d
For lifting up the display
5
people is required and for installing the display in vertical orientation
6
people is required.
Please keep the space
(W : more than 1,500 mm, H : more than 2,600 mm)
to lay down this display.
“UP” mark label
Set the necessary parts in vertical orientation installing.
F ll
i
th “UP”
k l b l
l
b
f
Please lay down LCD surface of the display on the clean
blanket.
blanket.
Following the “UP” mark label, please be aware of
setting direction of the clasps. (Do not set the clasps
upside down.)
setting direction of the clasps. (Do not set the clasps
upside down.)
Please remove the packing stand from the display and
(Lay side part of the package and packaging bag which
wrapped the display upon it. Please set the display on top of
them). Remove the handles(4 handles)
wrapped the display upon it. Please set the display on top of
them). Remove the handles(4 handles)
PN-R903 Installation Guidelines <Rev1.0> February 2013
CONFIDENTIAL
13
Please remove the packing stand from the display and
the display from package.
the display from package.
※Please certainly check the dust on surface of the
display. This may cause the display to break.
display. This may cause the display to break.
Precautions in vertical orientation installing and handling 2
Precautions in vertical orientation installing and handling
Please wear gloves and safety shoes when you lift up this display.
F
lifti
th di l
5
l i
i d
d f
i t lli
th di l
i
ti l
i t ti
6
l i
i d
F ll
i
th i
b l
l
h k th
iti
d
For lifting up the display 5 people is required and for installing the display in vertical orientation 6 people is required.
Please keep the space
(W : more than 1,500 mm, H : more than 2,600 mm)
to lay down this display.
WorkerA;
Hold the side(long side)
Hold the side(long side)
WorkerE;
Hold the side(long side) of the
Hold the side(long side) of the
Following the image below, please check the position and
assignment for each worker.
assignment for each worker.
(
g
)
of the main body with
both hands.
both hands.
(
g
)
main body with both hands.
Please hold up the underside of the display not to fall
WorkerF;
p
p y
down when lifting up it.
After lifting up, please installing following the left
image.
After lifting up, please installing following the left
image.
WorkerF;
Lead the worker to
the wall hunger or
stand.
Lead the worker to
the wall hunger or
stand.
WorkerB;
Hold the side(long side) of the
Hold the side(long side) of the
WorkerD;
(
) f
※when lifting up the display, please do not load
the edge of the display.
the edge of the display.
(If the edge of the display is loaded, it may
cause the display to break.)
l
t th
l
bl
k t
d
th di
l
WorkerC;
main body with left hand.
Hold the underside(short side)
of the main body with right hand.
Hold the underside(short side)
of the main body with right hand.
Hold the side(long side) of the
main body with right hand.
Hold the underside(short side)
of the main body with left hand.
main body with right hand.
Hold the underside(short side)
of the main body with left hand.
PN-R903 Installation Guidelines <Rev1.0> February 2013
CONFIDENTIAL
14
please set the clean blanket under the display
not to break.
Hold the underside(short side) of the
main body with both hands.
main body with both hands.
Precautions for orientation
About orientation
- Only vertical installation perpendicular to level surface is recommended.
-The limitation of the inclination angle is between 0 to 20 degrees upward/downward.
Within 20
degrees
Within 20
degrees
degrees
More than 20
degrees
○
×
More than 20
degrees
g
○ ○
○ × × ○ ○
Only vertical installation
is recommended.
Installing with inclination more than
20 degrees is impossible.
PN-R903 Installation Guidelines <Rev1.0> February 2013
CONFIDENTIAL
15
Click on the first or last page to see other PN-R903 service manuals if exist.