DOWNLOAD Sharp UP-3300 (serv.man17) Service Manual ↓ Size: 852.32 KB | Pages: 14 in PDF or view online for FREE

Model
UP-3300 (serv.man17)
Pages
14
Size
852.32 KB
Type
PDF
Document
Service Manual
Brand
Device
EPOS / Option Installation Manual
File
up-3300-sm17.pdf
Date

Sharp UP-3300 (serv.man17) Service Manual ▷ View online

Lowering the height of the UP-P16DP
Remove the standard Pole and attach the Base cabinet 
4
 to the
Ratch 
9
.
15. Built-in Printer: UP-T80BP
1. UP-T80BP INSTALLATION
1. Remove the BOTTOM PLATE 
2
.
1) Remove the three SCREWs 
1
.
2) Remove the BOTTOM PLATE 
2
.
3) Remove the SCREW 
3
, CABLE CLAMP 
4
 and POWER SUPP-
LY CABLE 
5
.
Fig. 1
2. Install the PS+CONTROL PWB 
6
.
CAUTION: The power supply unit is an important item. Make sure
that the unit code is RDENC 1010RCZZ.
1) Fix the PS+CONTROL PWB 
6
 with three SCREWs 
7
 
Z
3
*
SCREW 
3
: Use the screw which was fixing the CLAMP 
4
*
SCREW 
Z
: fix the screw with earth WIRE.
3. Connect the POWER SUPPLY CABLE 
5
 to the
PS+CONTROL PWB 
6
. (No. CN1)
4. Connect the I/F CABLE 
8
 of the PS+CONTROL
PWB 
6
 to the UP-3300 MAIN PWB (No.CN20)
Fig. 2
5. Remove the PRINTER LID 
9
.
1) Remove the screw 
F
.
2) Remove the PRINTER LID 
9
.
6. Install the four PAPER ROLLERs 
G
.
Fig. 3
2
1
3
4
5
10
9
11
– 8 –
7. Install the SWITCH UNIT 
H
.
1) Fix the SWITCH UNIT 
H
 on the cabinet pawl 
A
.
2) Pass the SWITCH UNIT CABLE 
I
 through the hole (B).
Fig. 4
8. Install the AUTO CUTTER RELAY PWB UNIT 
J
.
1) Install the AUTO CUTTER RELAY PWB UNIT 
J
 with SCREW
K
.
2) Pass the AUTO CUTTER RELAY PWB CABLE 
L
 through the
hole 
C
.
Fig. 5
9. Install the PAPER GUIDE 
M
 to the PRINTER
UNIT 
N
.
10. Install the HEAD CABLE 
O
 to the PRINTER
UNIT 
N
.
Fig. 6
11. Install the PRINTER UNIT 
N
.
1) Connect the AUTO CUTTER CABLE 
P
 to the AUTO CUTTER
RELAY PWB 
J
.
2) Pass the HEAD CABLE 
O
 through the hole (C).
3) Pass the MOTOR CABLE 
Q
 and SENSOR CABLE 
R
 through
the hole (D).
4) Open the PRINTER UNIT 
N
.
5) Fix the PRINTER UNIT 
N
 with four SCREWs 
S
*
Fix the SCREWs 
S
 in the order of 
S
-
a
 to 
S
-
d
.
6) Fix the two EARTH WIREs 
T
 with a SCREW 
U
.
12
A
A
B
12
13
14
15
C
16
: XEBSD30P08000
15
17
19
18
– 9 –
Fig. 7
12. Wiring for each cables as shown below
13. Connect the Printer cables to the CONTROL
PWB.
1) SWITCH UNIT CABLE 
I
: Connect to the CN7.
2) HEAD CABLE 
O
: Connect to the CN5.
Attach the FERRITE CORE 
V
 and CABLE
CLAMP 
4
.
Fix the CABLE CLAMP 
4
 with a SCREW
X
.
3) AUTO CUTTER RELAY PWB CABLE 
L
: Connect to the CN4.
4) MOTOR CABLE 
Q
: Connect to the CN2.
5) SENSOR CABLE 
R
: Connect to the CN6.
6) I/F CABLE 
8
: Attach the Ferrite core 
[
.
Fig. 8
16
19
14
20
26
22
13
21
16
19
4
28
: XEBSD30P08000
28
– 10 –
14. Wiring for each cables as shown below
Fig. 9
15. Install the BOTTOM PLATE 
2
.
Fig. 10
16. Install the PRINTER COVER 
Y
.
Fig. 11
2
1
29
– 11 –
Page of 14
Display

Click on the first or last page to see other UP-3300 (serv.man17) service manuals if exist.