DOWNLOAD Sharp UP-600 / UP-700 (serv.man21) Service Manual ↓ Size: 1.03 MB | Pages: 26 in PDF or view online for FREE

Model
UP-600 UP-700 (serv.man21)
Pages
26
Size
1.03 MB
Type
PDF
Document
Service Manual
Brand
Device
ECR / UP600-700 Printer Manual
File
up-600-up-700-sm21.pdf
Date

Sharp UP-600 / UP-700 (serv.man21) Service Manual ▷ View online

CHAPTER 6 DISASSEMBLY AND ASSEMBLY
This chapter mainly outlines the procedure for disassembling the
printer. It is advisable to reinstall the printer in the reverse order
from disassembly, referring to "Cautions to be taken when install-
ing." 
Some easy steps have been omitted.
Only part names are described without indicating their part codes.
For the part codes, refer to the Parts Guide.
[Cautions to be taken when working on the printer]
1) The parts which need to be greased are indicated in "Cautions to
be taken when reinstalling." Whenever such a part is replaced
with a new one, grease it before installing. 
Lubrication interval (rough guide)
Every 6 months
Every 2 years or 2,000,000 lines of printing
Parts code of lubricant
Lubricant type
PARTS CODE
PRICE RANK
G36
00BB703600001
AU
2) Use caution not to have the gear chipped or deformed when
removing or reinstalling.
3) Do not touch directly the printing head.
4) Be sure to wear an earth band to ground your body.
1
REMOVING A/C UNIT 
Fig. 1
[PARTS LIST]
No.
PARTS NAME
Q’ty
A/C unit
1
Connector cable
1
PWB unit
1
Ground wire
1
Head frame
1
Housing PR58H
1
Screw (M3 x 5 Black)
1
[DISASSEMBLY METHOD]
1) Remove the connector cable 
 from the 4-pin connector CON4
of the PWB unit 
.
2) Remove the screw 
. Remove the ground wire 
 from the
Head frame 
.
3) Remove the A/C unit 
 from the housing PR58H 
.
2
4
1
7
5
6
3
CON4
2
REMOVE THE PR58H GEAR
COVER, PT-COVER
Fig. 2
[PARTS LIST]
No.
PARTS NAME
Q’ty
Housing PR58H
1
PR58H gear cover
1
SCREW (M3 
×
 5 Black)
1
PT-COVER
1
[DISASSEMBLY METHOD]
1) Remove the PR58H gear cover 
Using a screwdriver, raise the two tabs of the PR58H gear cover
 and remove the PR58H gear cover 
 from the housing
PR58H  .
Fig. 3
2) Remove the SCREWs 
. Remove the PT-COVER 
.
Insert a flat-bladed screwdriver into the slit shown in the fig-
ure below.
Apply force into the direction indicated by the arrow, to raise
the tang and pull out the PT-COVER upward.
Fig. 4
3
4
1
2
(A)
1
2
Along the right side in the slit,
Insert a screwdriver (-) here.
PT-COVER
3
REMOVE THE HEAD UNIT
Fig. 5
[PARTS LIST]
No.
PARTS NAME
Q’ty
H-SPRING
2
HEAD UP LEVER
1
E-RING
1
SCREW (M3 
×
 6)
2
THERMAL HEAD
1
HEAD FRAME
1
Use caution not to touch the heating element of the
THERMAL HEAD 
 and PWB.
[DISASSEMBLY METHOD]
1) Remove the H-SPRINGs 
 on the right and left sides of the
printer frame.
<Note> Pinch the H-SPRING at point E with long-nose pliers
and remove it taking care not to deform the rib of the
HOUSING A.
Fig. 6
2) Remove the HEAD UP LEVER 
.
3) Remove the E-RING 
 .
4) Remove the HEAD FRAME UNIT (Part of the assembly of the
THERMAL HEAD
 and HEAD FRAME 
).
<Note> Use caution not to damage or deform the HEAD
FRAME UNIT by inadvertently hitting them with the
ROLLERs and gears.
5) Remove the two SCREWs 
 and remove the THERMAL HEAD
 from the HEAD FRAME 
.
[GREASING]
Apply grease on the two mounting areas 
 of the HEAD FRAME 
.
3
4
1
2
1
4
5
6
A
A
E
H-spring
Pinch here with long-nose pliers.
[Cautions to be taken when reinstalling]
1. Adjusting the HEAD position
Whenever the THERMAL HEAD 
 is replaced with a new one,
adjust its position for the HEAD FRAME 
.
Procedure:
1) The screw hole for fixing the THERMAL HEAD 
 in the
HEAD FRAME 
 is made a slot as shown in the figure
below. First, align the screw hole in the THERMAL HEAD
 with the bottom area of the slot and temporarily secure
it with the SCREW 
.
2) Install the HEAD FRAME UNIT 
 on the HOUSING 
.
3) Adjust the HEAD position and make sure that heating
element of the HEAD 
 is most properly positioned, by
performing a printing test. Do not adjust the Head position
during printing; otherwise the HEAD might break down
due to friction.
<Procedure for adjusting HEAD position>
(1) Insert a flat-bladed screwdriver into the adjustment
hole C in the HEAD FRAME 
. Adjust the HEAD
upward little by little with the screwdriver until it
reaches the desired position, and secure it with the
SCREW 
 (tightening torque: 6.5 kgf-cm).
4) If there is a difference in darkness in print between the
receipt and journal, insert the angle A’s spacer into the
gap between the HEAD FRAME unit and the thermal
head as shown in the figure below.
2. Direction of H-SPRING 
Install the H-SPRINGs 
 so that the hooks point outward.
Fig. 7
3. HEAD cable
Install the 9-pin connector to the right end of the THERMAL
HEAD   and the 10-pin connector to the left end.
Use caution to make a good connection or a deformed connec-
tor  when connecting the THERMAL HEAD 
 and HEAD ca-
bles.
Fig. 8
4. Installing HEAD UP LEVER and H-SPRING ("J" side)
1)
2)
3)
Fig. 9
HEAD FRAME unit
1
1
The number of pins on the
PWB unit:10P
The number of pins on the
PWB unit:9P
4
5
6
4
B
C
B
C
1
2
H-SPRING ("J" side)
3
1
2
Page of 26
Display

Click on the first or last page to see other UP-600 / UP-700 (serv.man21) service manuals if exist.