DOWNLOAD Sharp DV-NC100H (serv.man6) Service Manual ↓ Size: 1.4 MB | Pages: 25 in PDF or view online for FREE

Model
DV-NC100H (serv.man6)
Pages
25
Size
1.4 MB
Type
PDF
Document
Service Manual
Brand
Device
DVD / Deck mechanism section
File
dv-nc100h-sm6.pdf
Date

Sharp DV-NC100H (serv.man6) Service Manual ▷ View online

2-4-8
H9740DA
[27]
[31]
(C-3)
[26]
(C-4)
[25]
(C-2)
[28]
[29]
[30]
(C-5)
(S-9)
[24]
[23]
(L-7)
(L-8)
Fig. DM13H-1
[27]
[27]
[26]
Top View
First tooth on [47]
First groove on [27]
Align [26] and [27] as shown.
Pin of [36]
Pin of [33]
Position of Mode Lever when installed
Pin of [37]
Bottom View
Installation of [26]
When reassembling [27], 
meet the first groove on 
[27] to the first tooth on 
[47] as shown.
Fig. DM13H-2
[32]
(L-9)
(P-5)
[34]
[35]
Refer to the Alignment 
Section, Page 2-5-1.
[33]
Fig. DM14H
2-4-9
H9740DA
[39]
(L-10)
[37]
(P-6)
[43]
[38]
[36]
[42]
[40]
[41]
(C-6)
(C-7)
turn
turn
turn
Fig. DM15H
[44]
[45]
[46]
(L-11)
Fig. DM16H
Slide Plate
(S-11)
[47]
[48]
Slide
Fig. DM17H
2-5-1
H9740AMP
The following procedures describe how to align the
individual gears and levers that make up the tape loading/
unloading mechanism. Since information about the state
of the mechanism is provided to the System Control
Circuit only through the Mode Switch, it is essential that
the correct relationship between individual gears and
levers be maintained.
All alignments are to be performed with the
mechanism in Eject mode,
 in the sequence given.
Each procedure assumes that all previous procedures
have been completed.
IMPORTANT:
If any one of these alignments is not performed properly,
even if off by only one tooth, the unit will unload or stop
and it may result in damage to the mechanical or electrical
parts.
Alignment points in Eject Position
Alignment 3
Alignment 1
Top View
Fig. AL1
Bottom View
Alignment 2
ALIGNMENT PROCEDURES OF MECHANISM
Alignment 1
Loading Arm (SP) and (TU) Assembly
Install Loading Arm (SP) and (TU) Assembly so that their
triangle marks point to each other as shown in Fig. AL2.
Alignment 2
Mode Gear
Keeping the two triangles pointing at each other, install
the Loading Arm (SP) Assembly so that the last tooth of
the gear meets the most inside teeth of the Mode Gear.
See Fig. AL2.
Fig. AL2
Loading Arm 
(TU) Assembly
Triangle Marks
Loading Arm 
(SP) Assembly
Mode Gear
Last Tooth
Alignment 1
Alignment 2
Most inside teeth 
of Mode Gear
Alignment 3
Cam Gear (A) (HI), Rack Assembly
Install the Rack Assembly so that the first tooth on the
gear of the Rack Assembly meets the first groove on the
Cam Gear (A) (HI) as shown in Fig. AL3.
Fig. AL3
Top View
Cam Gear (A)(HI)
First tooth
Alignment 3
Gear on Rack Assembly
First groove
on the Cam Gear (A)(HI)
2-6-1
H97D1DEX
DECK EXPLODED VIEWS
Deck Mechanism View 1
Some Ref. Numbers are not in sequence.
B12
B492
B11
B571
B37
B126
B8
B121
L1450
L1450
B86
L1466
B501
L1051
B35
B410
B411
B494
B567
L1053
B74
L1467
B553
B10
L1191
B73
B9
B2
L1322
B5
Page of 25
Display

Click on the first or last page to see other DV-NC100H (serv.man6) service manuals if exist.