DOWNLOAD Panasonic KX-TG6611RUB / KX-TG6611RUM / KX-TG6611UAB / KX-TG6611UAM / KX-TG6611CAB / KX-TG6611CAM / KX-TG6612CAB / KX-TGA661RUB / KX-TGA661RUM Service Manual ↓ Size: 4.14 MB | Pages: 82 in PDF or view online for FREE

Model
KX-TG6611RUB KX-TG6611RUM KX-TG6611UAB KX-TG6611UAM KX-TG6611CAB KX-TG6611CAM KX-TG6612CAB KX-TGA661RUB KX-TGA661RUM
Pages
82
Size
4.14 MB
Type
PDF
Document
Service Manual
Brand
Device
Telephone / DIGITAL CORDLESS PHONE
File
kx-tg6611rub-kx-tg6611rum-kx-tg6611uab-kx-tg6611ua.pdf
Date

Panasonic KX-TG6611RUB / KX-TG6611RUM / KX-TG6611UAB / KX-TG6611UAM / KX-TG6611CAB / KX-TG6611CAM / KX-TG6612CAB / KX-TGA661RUB / KX-TGA661RUM Service Manual ▷ View online

37
KX-TG6611RU/KX-TG6611UA/KX-TG6611CA/KX-TG6612CA/KX-TGA661RU
9.2.2.
Check Point (Charger Unit)
Note:
After the measuring, suck up the solder of TP.
The connection of adjustment equipment is as shown in Adjustment Standard (Charger Unit) (P.50).
(N)*
Sensitivity Receiver 
Confirmation
-
ANTI_TP
Follow steps 1 to 6 of (J).
7.Set DECT tester power to -90 dBm.
8.Confirm that the BER is < 1000 ppm.
IC7,
C802~C806,
C809~C813,
C820, C837,
C822, C823,
C825, C863,
C826, C864,
C851, C853,
DA801, DA802,
L802, L803,
C855~C858,
R806, R807,
R106, R109,
Q9, C617,R71 
(O)*
Timing Confirmation
-
ANTI_TP
Follow steps 1 to 6 of (J).
7.Confirm that the Timing accuracy is
• ± 5.0 ppm (When adjust the frequency of CLK in item (G)).
• ± 15 ppm (When do not adjust the frequency of CLK in item (G)).
IC7,
C802~C806,
C809~C813,
C820, C837,
C822, C823,
C825, C863,
C826, C864,
C851, C853,
DA801, DA802,
L802, L803,
C855~C858,
R806, R807,
R106, R109,
Q9, C617,R71 
(P)*
Power RAMP 
Confirmation
-
Follow steps 1 to 6 of (J).
7.Confirm that Power RAMP is matching.
IC7,
C802~C806,
C809~C813,
C820, C837,
C822, C823,
C825, C863,
C826, C864,
C851, C853,
DA801, DA802,
L802, L803,
C855~C858,
R806, R807,
R106, R109,
Q9, C617,R71 
(Q)
Audio Check
-
1. Link with Handset which is connected to Line Simulator.
2. Set line voltage to 48 V and line current to 50 mA.
3. Input -45 dBm (600 
Ω)/1 kHz to MIC of Handset. Measure the Level at Line I/F
and distortion level.
4. Confirm that the level is -2.0 dBm and that the distortion level is <5% at TEL
Line (600 
Ω Load).
5. Input -20 dBm (600 
Ω)/1 kHz to Line I/F. Measure the Level at Receiver of
Handset and distortion level (Receive volume set to second position from
minimum).
6. Confirm that the level is -24 dBm and that the distortion level is <5% at
Receiver (34 
Ω Load).
IC7, SA1, P1, 
D3, Q3, Q4,
R14, R15, R16,
R17, D21, Q5,
R19, R20, C14,
C56, R117,
R116, R29,
C22
(R)
Charging Check
-
1. Connect Charge Contact 12 
Ω/2 W resistor between charge+ and charge-.
2. Measure and confirm voltage across the resistor is 3.9 V ± 0.4 V.
R55, R56, D22,
C623
(S)
2.4V Supply 
Confirmation VDD2 
VDD2
1. Confirm that the voltage between test point VDD2 and GND is 2.5V ± 0.2V.
IC7, Q9, C617, 
R71
Items
Check 
Point
Procedure
Check or 
Replace Parts
(A)
Charging Check
-
1. Connect Charge Contact 12
Ω/2 W resistor between charge+ and charge-.
2. Measure and confirm voltage across the resistor is 3.5 V ± 0.3 V.
R1, F1
Items
Check 
Point
Procedure
Check or 
Replace Parts
38
KX-TG6611RU/KX-TG6611UA/KX-TG6611CA/KX-TG6612CA/KX-TGA661RU
9.3.
Troubleshooting by Symptom (Handset)
If your unit has below symptoms, follow the instructions in remedy column. Remedies depend on whether you have DECT tester
(*1) or not. 
Note:
(*1) A general repair is possible even if you don’t have the DECT tester because it is for confirming the levels, such as Acoustic
level in detail.
(*2) Refer to Check Point (Handset) (P.38)
9.3.1.
Check Point (Handset)
Please follow the items below when BBIC or EEPROM is replaced.
Note:
After the measuring, suck up the solder of TP.
*: Connections (P.51) is required beforehand.
The connections of adjustment equipment are as shown in Adjustment Standard (Handset) (P.53).
Items
Check 
Point
Procedure
Check or 
Replace Parts
(A)* 1.8 V Supply Adjustment
VDD1
1. Confirm that the voltage between test point VDD1 and GND is 1.8 V ± 0.02 V.
2. Execute the command “VDD”, then check the current value.
3. Adjust the 1.8V voltage of VDD1 executing command “VDD XX“(XX is the
value).
IC1, Q2, D1, 
C1, C44, R45, 
C40, C45, F1
(B)*
BBIC Confirmation
-
1. BBIC Confirmation (Execute the command “getchk”).
2. Confirm the returned checksum value.
Connection of checksum value and program number is shown below.
IC1, X1, RA61, 
R64, R66
(C)* EEP-ROM Confirmation
-
1. EEP-ROM Confirmation (Execute the command "sendchar EPV").
2. Confirm the returned Value. (Value for reference is written at "EEPROM C/
SUM” in Software_Version_Table.xls).
IC1, IC3, 
RA40, C172
(D) Charge Control Check & 
Charge Current Monitor 
Check
-
1. Apply 5.0 V between CHG(+) and CHG(-) with DC power supply and set
current limit to 150 mA.
Confirm the indication of “charging” on LCD.
2. Confirm that the current limit LED of DC power supply is ON/OFF.
Confirm it after waiting over 1 minute at least.
(If charge control cannot be confirmed by this procedure, please use battery to
handset power supply and try again.)
IC1, Q4 Q9, 
Q5, Q6, R9, 
R4, R5, R33, 
C19, F1, C1, 
R30, R31, R8, 
R45
(E)* Charge Detection (OFF) 
Check
-
1. Stop supplying 5.0 V to CHG (+) and CHG (-).
2. Confirm the indication of “charging” has been cleared.
IC1, Q4 Q9, 
Q5, Q6, R9, 
R4, R5, R33, 
C19, F1, C1, 
R30, R31, R8, 
R45
You have DECT Tester. 
(Model Number : CMD60)
Check item (A)-(D), (E)-(G).
Check item (A)-(D), (E)-(G).
Check item (A)-(C), (H), (O).
Check item (A)-(C), (H-(M))-(O)
-
Check item (I)-(N).
Check item (A)-(C), (H).
Check item (A)-(C), (I)-(N).
Check item (O).
Check item (O).
Check item (P).
Check item (P).
Remedy (*2)
Symptom
You don't have DECT Tester.
Battery strength is not indicated correctly by Battery icon.
You cannot hear the caller's voice.
You cannot use handset a little away from base unit  
even if the handset is within range of the base unit.
Does not link between base unit and handset.
The Audio level is high or low.
The SP-Phone level is high or low.
checksum value
program number
ex.)
2A92
DCJ2RN
39
KX-TG6611RU/KX-TG6611UA/KX-TG6611CA/KX-TG6612CA/KX-TGA661RU
(F)* Battery Monitor Check
-
1. Apply 2.25 V between BATT+ and BATT-.
2. Execute the command 
sendchar PAD
sendchar LED 0
sendchar CRX 0 1
sendchar AD1
It assumes that the return value is XX.
a) 6c   XX   71: No need to adjust
b) XX: 6A ~ 6B: Need to adjust
XX: 72 ~ 74: Need to adjust
Write AD value of 2.25 V to EEPROM.
ex) read data: XX = 6A, write data: YY = 6A
read data: XX = 73, write data: YY = 73
EEPROM = 0009(Low Voltage) write “YY”
Execute the command “wreeprom 00 09 01 YY”.
EEPROM = 000A(No Voltage) write “YY -C”
Execute the command “wreeprom 00 0A 01 ZZ”.
Note:
ZZ = YY - C
No Voltage writing data limit is ‘00’.
c) XX: 00 ~ 69: Reject
XX: 75 ~ FF: Reject
IC1, F1, C1, 
R45
(G)
Battery Low 
Confirmation
-
1. Apply 2.40 V between BATT+ and BATT-.
2. Confirm that there is no flashing of Battery Icon.
3. Apply 2.25 V ± 0.08 V between BATT+ and BATT-.
4. Confirm that there is flashing of Battery Icon.
IC1, F1, C1, 
R45
(H)* BBIC Clock Adjustment
CLK
1. Apply 2.6 V between BATT+ and BATT- with DC power.
2. Input Command “sendchar sfr”, then you can confirm the current value.
3. Check X’tal Frequency. (10.368 MHz ± 20 Hz).
4. If the frequency is not 10.368 MHz ± 20 Hz, adjust the frequency of CLK
executing the command “sendchar sfr xx xx (where xx is the value)” so that the
reading of the frequency counter is 10.368000 MHz ± 5 Hz.
Note:
Clear the registered information for Base Unit before measurement, because the
Frequency will not possibly get stable due to the registered information.
Pressing the button of "3" "5" "7" "#"clears the registration.
Register to it on Base Unit after measurement. 
IC1, X1, C47
 
(I)*
Transmitted Power 
Confirmation
-
Remove the Antenna before starting step from 1 to 4.
1. Configure the DECT tester (CMD60) as follows;
<Setting>
• Test mode: PP
• RFPI: 0102030405
• Traffic Carrier: 5
• Traffic Slot: 4
• Mode: Loopback
• RF LEVEL = -70 dBm
• PACKET: PP32Z
2. Execute the command “sendchar TST 01 02 03 04 05".
3. Initiate connection from DECT tester.
4. Confirm that the NTP value at ANT is 19 dBm ~ 25 dBm.
IC1, 
C802~C806, 
C809~C814, 
C820, C822, 
C823, 
C825~C826, 
L802, C863, 
C864, L803, 
DA801, R806, 
R807
(J)* Modulation Check and 
Adjustment
-
Follow steps 1 to 3 of (K).
4.Confirm that the B-Field Modulation is -350 ± 50/+350 ± 50 kHz/div &
Modulated width   610 kHz using data type Fig 31.
IC1, 
C802~C806, 
C809~C814, 
C820, C822, 
C823, 
C825~C826, 
L802, C863, 
C864, L803, 
DA801, R806, 
R807
(K)*
Frequency Offset 
Confirmation
-
Follow steps 1 to 3 of (I).
4.Confirm that the frequency Offset is < ± 20 kHz.
IC1, 
C802~C806, 
C809~C814, 
C820, C822, 
C823, 
C825~C826, 
L802, C863, 
C864, L803, 
DA801, R806, 
R807
Items
Check 
Point
Procedure
Check or 
Replace Parts
40
KX-TG6611RU/KX-TG6611UA/KX-TG6611CA/KX-TG6612CA/KX-TGA661RU
(L)*
Frequency Drift 
Confirmation
-
Follow steps 1 to 3 of (I).
4.Confirm that the frequency Drift is < ± 20 kHz/ms.
IC1, 
C802~C806, 
C809~C814, 
C820, C822, 
C823, 
C825~C826, 
L802, C863, 
C864, L803, 
DA801, R806, 
R807
(M)*
Sensitivity Receiver 
Confirmation
-
Follow steps 1 to 3 of (I).
4.Set DECT tester power to -88 dBm.
5.Confirm that the BER is < 1000 ppm.
IC1, 
C802~C806, 
C809~C814, 
C820, C822, 
C823, 
C825~C826, 
L802, C863, 
C864, L803, 
DA801, R806, 
R807
(N)*
Power RAMP 
Confirmation
-
Follow steps 1 to 3 of (I).
4.Confirm that Power RAMP is matching.
IC1, 
C802~C806, 
C809~C814, 
C820, C822, 
C823, 
C825~C826, 
L802, C863, 
C864, L803, 
DA801, R806, 
R807
(O)
Audio Check and 
Confirmation
-
1. Link to BASE which is connected to Line Simulator.
2. Set line voltage to 48 V and line current to 50 mA.
3. Input -45 dBm (600 
Ω)/1 kHz to MIC of Handset. Measure the Level at Line I/F
and distortion level.
4. Confirm that the level is -2.0 dBm and that the distortion level is <5%    at TEL
Line (600 
Ω Load).
5. Input -20 dBm (600 
Ω)/1kHz to Line I/F. Measure the Level at Receiver of
Handset and distortion level (Receive volume set to second position from
minimum).
6. Confirm that the level is -24 dBm and that the distortion level is <5% at
Receiver (34 
Ω Load).
IC1, C12, C96, 
C97, R215, 
R27, RA4, 
C11, C13, 
R28, MIC
(P) SP phone Audio Check 
and Confirmation
-
1. Link to Base which is connected to Line Simulator.
2. Set line voltage to 48V and line current to 50 mA.
3. Set the handset off-hook using SP-Phone key.
4. Input -30 dBm(600 
Ω)/1 KHz to Line I/F and measure Receiving level at SP+
and SP-.
5. Confirm that the level is -8.0 dBm and that the distortion level is < 5%. 
(Val = Max at SP (8 
Ω Load))
IC1, C12, C73, 
D13, D14, 
MIC, C11, 
C13, RA4, 
R27, R28, 
C96, C97, 
R215, C72, 
C73
(Q)
Charge Pump 3.0V 
Supply Confirmation
CP3.0V
1. Confirm that the voltage between testpoint CP3.0V and GND is 3.0 V - 0.1/+0.3
V.
C49, C53, C54
(R)
Charge Pump CPV2 
3.0V Supply 
Confirmation
CPV2
1. Confirm that the voltage between testpoint CPV2 and GND is 3.0 V ± 0.3 V.
(Power is supplied when LED in on)
C52, C55 
(S)
CP2.8V
Confirmation
CP2.8V
1. Confirm that the voltage between testpoint CPV2.8V and GND is 4.0 V ± 0.3 V.
D3, C51 
Items
Check 
Point
Procedure
Check or 
Replace Parts
Page of 82
Display

Click on the first or last page to see other KX-TG6611RUB / KX-TG6611RUM / KX-TG6611UAB / KX-TG6611UAM / KX-TG6611CAB / KX-TG6611CAM / KX-TG6612CAB / KX-TGA661RUB / KX-TGA661RUM service manuals if exist.