Panasonic NC-EH22P / NC-EH30P / NC-EH40P / NC-EH30PWTW / NC-EH40PWTW Service Manual ▷ View online
ࡀࡓ $㧔␜ㇱ㧕
⚵┙ᤨߩࡐࠗࡦ࠻
ࡊࠣฃߌ
⚵┙ᤨߩࡐࠗࡦ࠻
ࡀࡓ $㧔␜ㇱ㧕
⚵┙ᤨߩࡐࠗࡦ࠻
ࡊࠣฃߌ
⚵┙ᤨߩࡐࠗࡦ࠻
- 11 -
NC-EH22P, EH30P, EH40P
3.9. Name B (decorative panel)
1. Remove the name B panel by picking with a bladed
screwdriver or a pin at point “A”.
Name B
(decorative panel)
(decorative panel)
Point A
Points in reassembling
• Affi x name A in the direction of the arrow starting from
point A.
DISASSEMBLY-9
3.10. Peg Frame
1. Remove the bottom ring upward using a bladed
screwdriver or the like.
2. Remove the self- tapping screw.
3. Insert the bladed screwdriver between rib of the
3. Insert the bladed screwdriver between rib of the
peg frame and rib of the body. Then turn the bladed
screwdriver to the right hand direction and push
angle plate sharply to release it.
screwdriver to the right hand direction and push
angle plate sharply to release it.
Point in Reassembling
• When the body or the bottom ring is replaced, apply a
friction reducing agent. It does not turn smoothly if the
volume of the friction deducing agent is insuffi cient.
volume of the friction deducing agent is insuffi cient.
Bottom ring
Peg frame
4x12 self-
tapping screw
tapping screw
Bladed
screw driver
screw driver
DISASSEMBLY-10
Reboil
Pour
out
Long Boil
6h Timer
80
98
60
90
Cleaning
(Press 3s)
Unlock
Lock
NC-EH22_30_40P.indd 11
NC-EH22_30_40P.indd 11
1/14/08 9:36:26 AM
1/14/08 9:36:26 AM
ࡀࡓ #
ಽ⸃
߰ߚ㧔ቢᚑ㧕ޔ㘼ࠅᨒ
ಽ⸃
߰ߚ #ޔ߰ߚࠞࡃ㧔ቢᚑ㧕
- 12 -
NC-EH22P, EH30P, EH40P
3.11. Name A
1. Push out transparent portion of water supply and
gauge cover from inside the body with the thumb.
Body
Push with
thumb
thumb
Name A with the water feed and
the water gauge cover
the water gauge cover
3.12. Lid comp. and Inner lid
1. Remove the 3 screws.
2. Remove the lnner lid.
2. Remove the lnner lid.
4x20 self-tapping
screws (Stainless)
screws (Stainless)
Inner lid
Lid comp.
3.13. Lid A and Lid cover comp.
1. Remove the 2 screws.
2. Put a thin bladed screwdriver or the like between
2. Put a thin bladed screwdriver or the like between
the lid and the lid cover comp., and lever it to
separate them.
separate them.
DISASSEMBLY-12
4x20 self-tapping
screws (Stainless)
screws (Stainless)
Lid cover comp.
DISASSEMBLY-11
Bladed
screwdriver
Lid A
DISASSEMBLY-13
Gap
NC-EH22_30_40P.indd 12
NC-EH22_30_40P.indd 12
1/14/08 9:36:27 AM
1/14/08 9:36:27 AM
⚵┙ᓟߩ⏕
ㅧኒ⇟ߩᝲශᚲ
ᧄᕈ⢻⏕࠹ࠬ࠻
᷷᷷ᐲ⏕࠹ࠬ࠻㧔 ⸳ቯᤨ㧕
⦟ຠߩ▸࿐
ฯ㊂⏕࠹ࠬ࠻㧔 ⸳ቯᤨ㧕
㔚േḡᤨ
⦟ຠߩ▸࿐
ᴣߣ߁ᤨ㑆⏕࠹ࠬ࠻㧔 ⸳ቯᤨ㧕
⦟ຠߩ▸࿐
ࠞ࡞ࠠᛮ߈ᴣߣ߁⏕࠹ࠬ࠻
㧔 ⸳ቯᤨ㧕
ࠢࠛࡦ㉄ᵞᵺ⏕࠹ࠬ࠻
7 0 6 0 1 1
- 13 -
NC-EH22P, EH30P, EH40P
3.16. Performance test
CAUTION
Be careful to avoid burns from hot
water during this test.
water during this test.
3.16.1. Keep Warm temperature check
1. Fill the container with the rated amount of water,
and maintain temperature.
2. Measure the temperature 1 hour after keep warm
lamp illuminates.
Normal warming temperature range:
90°C - 100°C (without continuous boiling)
LED indication: 98
LED indication: 98
3.16.2. Discharge amount check (at 98 setting)
3.16.2.1. With motorized discharge
3.16.2.1. With motorized discharge
1. Fill the container with the rated amount of water.
2. Measure the water amount about one hour after
2. Measure the water amount about one hour after
the start of keep warm operation.
3. Press the Pour out pad and let the hot water
pour out for 5 seconds. Measure the amount of
discharged hot water.
discharged hot water.
Normal water discharge amount:
250ml or more
3.14. Checks after assembly
After assembly, check for any water leaks, insulation resistance, dielectric strength, and performance, with power
applied.
The insulation resistance: Shall be 2MΩ or more when measured with a 500VDC megger. (Measuring point: Between
applied.
The insulation resistance: Shall be 2MΩ or more when measured with a 500VDC megger. (Measuring point: Between
the 2 peg frame pins and the bottom plate)
Dielectric strength:
Shall withstand 1000VAC for one minute. (Measuring point: Same as for the insulation
resistance test)
resistance test)
Check normal operation: Conduct the pot performance test (see page 3) to check if the operation is normal)
3.15. Position of production date stamping
Production date is stamped on the bottom plate.
[Example]
Year Month Day Line Number
Production date
3.16.3. Boiling time (Steam emitting time) check
1. Pour the rated amount of water into the container,
and boil the water.
2. Measure the exact time from when steam starts to
be produced to when the vacuum keep warm lamp
illuminates.
illuminates.
Normal boiling time:
80 seconds or less.
3.16.4. Dechlorination boiling check (at 98 setting)
1. Fill the container with the rated amount of water,
and switch to dechlorination mode by pressing the
Reboil pad. (Reboil lamp illuminates for fl ushing.)
Reboil pad. (Reboil lamp illuminates for fl ushing.)
2. Check that dechlorination boiling mode starts.
3.16.5. Citric acid cleaning time check
1. Fill the container with the rated amount of water, and
switch to citric acid cleaning mode by pressing the
Select pad for more than 3 seconds.
Select pad for more than 3 seconds.
2. Check citric acid cleaning mode starts. (Reboil lamp
illuminates and the liquid crystal indication rotates.)
NC-EH22_30_40P.indd 13
NC-EH22_30_40P.indd 13
1/14/08 9:36:28 AM
1/14/08 9:36:28 AM
㈩✢࿑
⚿✢࿑
Relationship of LEDs and switches
on the control unit B (Operation)
and relevant indicators.
on the control unit B (Operation)
and relevant indicators.
LED
Indication
Color
LED1
Reboil
Red
LED2
Vacuum keep
warm
warm
Orange
LED3
Unlock
Red
Switch Indication
SW1
SW1
Reboil
SW2
Timer
SW3
Select
SW4
Unlock
SW5
Pour out
- 14 -
NC-EH22P, EH30P, EH40P
4 Schematic diagram
4.1. Wiring connection diagram
4.1. Wiring connection diagram
Control unit A
(Bottom)
Control unit B
(Operation)
Thermistor
comp.
Peg frame
White
Container comp.
Keep warm heater 75W
Main heater 700W
White
Thermal fuse
comp.
White
White
White
Yellow
Red
Blue
Red
Orange
Motorized pump
NC-EH22_30_40P.indd 14
NC-EH22_30_40P.indd 14
1/14/08 9:36:30 AM
1/14/08 9:36:30 AM
Click on the first or last page to see other NC-EH22P / NC-EH30P / NC-EH40P / NC-EH30PWTW / NC-EH40PWTW service manuals if exist.