DOWNLOAD Panasonic NC-EG4000WTS / NC-EG3000WTS Service Manual ↓ Size: 3.33 MB | Pages: 26 in PDF or view online for FREE

Model
NC-EG4000WTS NC-EG3000WTS
Pages
26
Size
3.33 MB
Type
PDF
Document
Simplified Service Manual
Brand
Device
Home Appliance / ELECTRIC THERMO POT
File
nc-eg4000wts-nc-eg3000wts.pdf
Date

Panasonic NC-EG4000WTS / NC-EG3000WTS Simplified Service Manual ▷ View online

21
6.16. Check after assembly
• After assembly, check for any water leaks, insulation resistance, dielectric strength and performance with power applied.
The insulation resistance :
• Shall be 2MΩ or more when measured with a DC500VC megger. (Measuring point : Between the 2 peg frame pins and the bot-
tom plate)
Dielectric strength :
• Shall withstand AC1000V for 1 minute. (Measuring point : Same as for the insulation resistance test)
Check normal operation :
• Conduct the pot performance test (5.1.Thermo pot performance test mode ,5.2.Check for thermo pot performance ) to check if
the operation is normal.
6.17. Position of production date stamping
• Production date is stamped on the bottom plate.
6.18. Performance test
6.18.1.
Keep warm temperature check.
1. Fill the container with the rated amount of water and
maintain temperature.
2. Measure the temperature 1 hour after keep warm lamp
illuminates.
Normal warming temperature range :
• 90deg - 100deg (without continuous boiling) LED indication :
98
6.18.2.
Discharge amount check (at 98 set-
ting)
6.18.2.1. With motorized discharge.
1. Fill the container with the rated amount of water.
2. Measure the water amount about 1 hour after the start of
keep warm operation.
3. Press the pour out pad and let the hot water pour out for 5
seconds. Measure the amount of discharged hot water.
Normal water discharge amount :
• 250ml or more.
6.18.3.
Boiling time (Steam emitting time) 
check.
1. Pour the rated amount of water into the container and boil
the water.
2. Measure the exact time from when steam starts to be pro-
duced to when the vacuum keep warm lamp illuminates.
Normal boiling time :
• 80 seconds or less.
6.18.4.
Dechlorination boiling check. (at 98 
setting)
1. Fill the container with the rated amount of water and
switch to dechlorination mode by pressing the reboil pad.
(Reboil lamp illuminates for flushing).
2. Check that dechlorination boiling mode starts.
6.18.5.
Citric acid cleaning time check.
1. Fill the container with the rated amount of water and
switch to citric acid cleaning mode by pressing the select
pad for more than 3 seconds.
2. Check citric acid cleaning mode starts. (Reboil lamp illu-
minates and the liquid crystal indication rotates).
22
7 Wiring Connection Diagram
7.1.
Circuit diagram
23
8 Schematic Diagram
8.1.
Actual wiring diagram
24
9 Exploded View and Replacement Parts List
9.1.
Parts Exploded View : NC-EG4000 / EG3000 (Body)
Page of 26
Display

Click on the first or last page to see other NC-EG4000WTS / NC-EG3000WTS service manuals if exist.