DOWNLOAD Panasonic BB-HCM581CE Service Manual ↓ Size: 4.69 MB | Pages: 101 in PDF or view online for FREE

Model
BB-HCM581CE
Pages
101
Size
4.69 MB
Type
PDF
Document
Service Manual
Brand
Device
Video Monitoring / NETWORK CAMERA
File
bb-hcm581ce.pdf
Date

Panasonic BB-HCM581CE Service Manual ▷ View online

17
BB-HCM581CE 
4.8.
PoE Block
[Power receive]
The power supplied from a LAN cable receives voltage (+48 V) via a diode bridge from a RJ-45 connector (CN605) on the PoE
Board.
There are 2 types of PoE receiving methods; a type using unused pins (4, 5, 7 and 8 pin) for LAN data transmission and a type
using the mid point of data lines (1, 2, 3 and 6 pin). This product is compatible with both types because it is equipped with 2 lines
(D640 - D643 and D644 - D647) of diode bridge circuits
The outputs of the 2 diode bridges described above are connected to the same poles and supply the subsequent circuits + and -
powers.
[PD certification circuit]
The voltage obtained from the diode bridges is supplied to the PD control IC (IC604) of PoE.
The PD control IC (IC604) performs the following operations with the applied voltage from the supply side of power.
For applied voltage of 2.8 - 10 V from the supply side, it returns the internal resistance value of PD control IC (IC604) (25 kΩ).
For applied voltage of 15.5 - 20.5 V from the supply side, it returns the current value by the resistor connected to the Pin (5) of
IC604. (This product is resistance value (open) and it is designed with Class 0 specification.)
When 48 V is applied as the certification progresses, it conducts between the Pins 7 and 10.
[Voltage drop section]
When the power of 48V is supplied to the following DC/DC converter section based on the PD authentication, voltage is con-
verted by PD control IC (IC604), output FET (Q603), switching transformer (T602), rectification diode, and capacitor (C674),
which results in output of +12V.
[Switching with AC adaptor]
There is a DC jack (CN602), to which an AC adaptor is connected when PoE is not used, and +12V is input from the AC adap-
tor. Switching of +12V from the PoE circuit is conducted by using diodes (D626, D601).
18
BB-HCM581CE
4.9.
Others
[I/O Terminal]
• The Input terminal has two systems; both of them are connected to the Input Port of the IC102 GPIO.
• Due to Internal Pull-up Resistance, the PNP Transistor (Q600, Q605) on the following level is usually in the OFF state and the
Input Port connected to the collector is at L level.
• If the terminal is short-circuited with the GND or the signal of L level is input, the PNP Transistor goes ON and the Input Port
goes to H level.
• The CPU checks the state of this port regularly to detect a change in this signal.
• The Output terminal is controlled by the Output Port of the IC102. When the Port output is L, the transistor (Q606) on the follow-
ing level is OFF and, when the output is H, the transistor is ON. This transistor has open collector output and it controls external
equipment via external pull-up.
[CLEAR SETTING SW(SW102)]
• The Clear Setting SW (SW102) mounted on the CPU board is connected to the Input Port of the GPIO. It is usually at H level and
goes to L level, when the SW is pressed.
• The CPU(IC102) monitors this Input Port periodically and, if it detects that this SW is pressed longer than a specified period, the
setting values other than the RTC are returned to factory settings.
19
BB-HCM581CE 
5 Location of Controls and Components
*1 Understanding the Camera Indicator
The camera’s indicator lights as follows according to the status of the camera. Understanding how and when
the indicator lights can help you troubleshoot problems with the camera.
Camera Status or Operation
Indicator Color and Pattern
Normal Operation
Green
When power is turned on (camera is starting up)
Orange
→Flashing orange
Obtaining IP address via DHCP
Flashing green
LAN cable not connected or no LAN connection
Orange
Automatic Setup
In progress
Flashing green
Completed
Green
Updating firmware
Flashing orange
Factory reset (by software or by pressing the FACTORY DEFAULT 
RESET button)
Flashing orange
→Off→The camera restarts)
UPnP
TM
 port forwarding error
Flashing orange (2-second intervals)
Camera failure
Flashing red
20
BB-HCM581CE
6 Installation Instructions
6.1.
Installation Guide
Page of 101
Display

Click on the first or last page to see other BB-HCM581CE service manuals if exist.