DOWNLOAD Panasonic CS-A18DKD / CU-A18DKD / CS-A24DKD / CU-A24DKD Service Manual ↓ Size: 13.92 MB | Pages: 86 in PDF or view online for FREE

Model
CS-A18DKD CU-A18DKD CS-A24DKD CU-A24DKD
Pages
86
Size
13.92 MB
Type
PDF
Document
Service Manual
Brand
Device
Air Conditioner
File
cs-a18dkd-cu-a18dkd-cs-a24dkd-cu-a24dkd.pdf
Date

Panasonic CS-A18DKD / CU-A18DKD / CS-A24DKD / CU-A24DKD Service Manual ▷ View online

(After Evacuation)
Procedure:
 1. Connect the charge hose to the charging cylinder.
 • Connect the charge hose which you disconnected from
the vacuum pump to the valve at the bottom of the
cylinder.
 2. Purge the air from the charge hose.
 • Open the valve at the bottom of the cylinder and press
the check valve on the charge set to purge the air (be
careful of the liquid refrigerant).
 3. Open the valve (Low side) on the charge set and charge
the system with liquid refrigerant.
 • If the system cannot be charged with the specified
amount of refrigerant, it can be charged with a little at a
time (approximately 150 g each time) while operating
the air conditioner in the cooling cycle; however, one
time is not sufficient, wait approximately 1 minute and
then repeat the procedure. (pumping down-pin)
This is different from previous procedures. Because you are
charging with liquid refrigerant from the gas side, absolutely do
no attempt to charge with large amount of liquid refrigerant
while operating the air conditioner.
 4. Immediately disconnect the charge hose from the 3-
way valve’s service port.
 • Stopping partway will allow the refrigerant to be
discharged.
 • If the system has been charged with liquid refrigerant
while operating the air conditioner, turn off the air
conditioner before disconnecting the hose.
 5. Mount the valve stem caps and the service port cap.
 • Use torque wrench to tighten the service port cap to a
torque of 18 N.m.
 • Be sure to check for gas leakage.
11.1.6. Gas charging
57
CS-A18DKD CU-A18DKD / CS-A24DKD CU-A24DKD
Required tools: hexagonal wrench, adjustable wrench, torque
wrenches, wrench to hold the joints and gas leak detector.
The additional gas for air purging has been charged in the
outdoor unit.
However, if the flare connections have not been done correctly
and there gas leaks, a gas cylinder and the charge set will be
needed.
 1. Recheck the piping connections.
 2. Open the valve stem of the 2-way valve counter-
clockwise approximately 90°, wait 10 seconds, and
then set it to closed position.
 • Be sure to use a hexagonal wrench to operate the valve
stem.
 3. Check for gas leakage.
 • Check the flare connection for gas leakage.
 4. Purge the air from the system
 • Set the 2-way valve to the open position and remove the
cap from the 3-way valve’s service port.
 • Using the hexagonal wrench to press the valve core pin,
discharge for three seconds and then wait for one
minute.
Repeat this three times.
 5. Use torque wrench to tighten the service port cap to a
torque of 1.8 kg.m. (18 N.m).
The air in the indoor unit and in the piping must be purged. If air
remains in the refrigeration pipings, it will affect the
compressor, reduce the cooling capacity, and could lead to a
malfunction.
 6. Set the 3-way valve to the opened position.
 7. Mount the valve stem nuts to the 2-way and 3-way
valves.
 8. Check for gas leakage.
 • At this time, especially check for gas leakage from the 2-
way and 3-way’s stem nuts, and from the service port
cap.
Caution
If gas leakage is discovered in step (3) above, take
the following measures:
If the leaks stop when the piping connections are
tightened further, continue working from step (4).
If the gas leaks do not stop when the connections are
retightened, repair the location of the leak, discharge
all of the gas through the service port, and then
recharge with the specified amount of gas from a gas
cylinder.
11.2. Air Purging of the Piping and Indoor Unit
11.2.1. Air purging (Installation)
Service port cap
Be sure, using a torque wrench to tighten the service port cap (after using the service port), so that it prevents the gas
leakage from the refrigeration cycle.
Procedure:
58
CS-A18DKD CU-A18DKD / CS-A24DKD CU-A24DKD
 1. Confirm that both the 2-way and 3-way valves are set to
the opened position.
 • Remove the valve stem caps and confirm that the valve
stems are in the opened position.
 • Be sure to use a hexagonal wrench to operate the valve
stems.
 2. Operate the unit for 10 to 15 minutes.
 3. Stop operation and wait for 3 minutes, then connect the
charge set to the service port of the 3-way valve.
 • Connect the charge hose with the push pin to the Gas
service port.
 4. Air purging of the charge hose.
 • Open the low-pressure valve on the charge set slightly
to purge air from the charge hose.
 5. Set the 2-way valve to the close position.
 6. Operate the air conditioner at the cooling cycle and
stop it when the gauge indicates 1 kg/cm
2
G (0.1 MPa).
 7. Immediately set the 3-way valve to the closed position.
 • Do this quickly so that the gauge ends up indicating 3 to
5 kg/cm
2
G (0.3 to 0.5 MPa).
 8. Disconnect the charge set, and mount the 2-way and 3-
way valve’s stem nuts and the service port caps.
 • Use a torque wrench to tighten the service port cap to a
torque of 1.8 kg.m (18 N.m).
 • Be sure to check for gas leakage.
11.2.2. Pumping down (Re-installation)
Procedure:
59
CS-A18DKD CU-A18DKD / CS-A24DKD CU-A24DKD
11.2.3. Re-air purging (Re-installation)
 1. Confirm that both the 2-way and 3-way valves are set to
the closed position.
 2. Connect the charge set and a charging cylinder to the
service port of the 3-way valve.
 • Leave the valve on the charging cylinder closed.
 3. Air purging.
 • Open the valves on the charging cylinder and the
charge set. Purge the air by loosening the flare nut on
the 2-way valve approximately 45° for 3 seconds then
closing it for 1 minute; repeat 3 times.
 • After purging the air, use a torque wrench to tighten the
flare nut on the 2-way valve.
 4. Check for gas leakage.
 • Check the flare connections for gas leakage.
 5. Discharge the refrigerant.
 • Close the valve on the charging cylinder and discharge
the refrigerant until the gauge indicates 3 to 5 kg/cm
2
G
(0.3 to 0.5 MPa)
 6. Disconnect the charge set and the charging cylinder,
and set the 2-way and 3-way valves to the open
position.
 • Be sure to use a hexagonal wrench to operate the valve
stems.
 7. Mount the valve stem nuts and the service port cap.
 • Be sure to use a torque wrench to tighten the service
port cap to a torque 1.8 kg.m (18 N.m).
 • Be sure to check for gas leakage.
Procedure:
60
CS-A18DKD CU-A18DKD / CS-A24DKD CU-A24DKD
Page of 86
Display

Click on the first or last page to see other CS-A18DKD / CU-A18DKD / CS-A24DKD / CU-A24DKD service manuals if exist.