Report No.: NEI-EMC-1-1009C113 Page 77 of 97
5.7.7 PHOTO(S) SHOWN THE LOCATION(S) OF ESD EVALUATED
Con 6
Air 7
Air 8
Con 3
Air 2
Air 3
Air 4
Air 5
Air 1
Con 4
Con 5
Con 1
Con 2
Con 10
Air 6
Air 9
Air 10
Con 9
Con 7
Con 8
Neutron Engineering Inc.
Report No.: NEI-EMC-1-1009C113 Page 78 of 97
5.8 EFT/BURST TESTING
5.8.1 TEST SPECIFICATION
Basic Standard:
IEC 61000-4-4
Test Voltage:
Power Line:1 kV
Signal/Control Line:N/A
Signal/Control Line:N/A
Polarity:
Positive & Negative
Impulse Frequency:
5 kHz
Impulse Waveshape :
5/50 ns
Burst Duration:
15 ms
Burst Period:
300 ms
Test Duration:
Not less than 1 min.
5.8.2 MEASUREMENT INSTRUMENTS
Item Kind of Equipment
Manufacturer
Type No.
Serial No.
Calibrated until
1 EMC Immunity Test
System
Thermo
EMCPRO
PLUS
0502214
May.26.2011
2
Capacitive Clamp
Thermo
CCL
0502215
May.26.2011
Remark: ” N/A” denotes No Model Name / Serial No. and No Calibration specified.
5.8.3 TEST PROCEDURE
The EUT and support equipment, are placed on a table that is 0.8 meter above a metal ground
plane measured 1m*1m min. and 0.65mm thick min.
The other condition as following manner:
The EUT and support equipment, are placed on a table that is 0.8 meter above a metal ground
plane measured 1m*1m min. and 0.65mm thick min.
The other condition as following manner:
a. The length of power cord between the coupling device and the EUT should not exceed 1
meter.
b. Both positive and negative polarity discharges were applied.
c. The duration time of each test sequential was 1 minute
d. For the actual test configuration, please refer to the related Item –Block Diagram of system
tested (please refer to 3.3).
5.8.4 DEVIATION FROM TEST STANDARD
No deviation
No deviation
Neutron Engineering Inc.
Report No.: NEI-EMC-1-1009C113 Page 79 of 97
5.8.5 TEST SETUP
EUT
80 cm
Ground Reference Plane (GRP) Bonded to PE
> 0.5 m
To Earth
Protective GND
Ground Reference
Plane (GRP)
Nearest Wall
Coupling/
Decoupling
Network Device
EFT/Burst
Generator
Generator
L ≤ 1 m
Protective GND
According
To AC Mains
Supply
Note:
TABLE-TOP EQUIPMENT
The configuration consisted of a wooden table (0.8m high) standing on the Ground Reference
Plane. The GRP consisted of a sheet of aluminum (at least 0.25mm thick and 2.5m square)
connected to the protective grounding system. A minimum distance of 0.5m was provided
between the EUT and the walls of the laboratory or any other metallic structure.
FLOOR-STANDING EQUIPMENT
The EUT installed in a representative system as described in section 7 of IEC 61000-4-4 and its
cables, were isolated from the Ground Reference Plane by an insulating support that is 0.1-meter
thick. The GRP consisted of a sheet of aluminum (at least 0.25mm thick and 2.5m square)
connected to the protective grounding system.
Plane. The GRP consisted of a sheet of aluminum (at least 0.25mm thick and 2.5m square)
connected to the protective grounding system. A minimum distance of 0.5m was provided
between the EUT and the walls of the laboratory or any other metallic structure.
FLOOR-STANDING EQUIPMENT
The EUT installed in a representative system as described in section 7 of IEC 61000-4-4 and its
cables, were isolated from the Ground Reference Plane by an insulating support that is 0.1-meter
thick. The GRP consisted of a sheet of aluminum (at least 0.25mm thick and 2.5m square)
connected to the protective grounding system.
Neutron Engineering Inc.
Report No.: NEI-EMC-1-1009C113 Page 80 of 97
5.8.6 TEST RESULTS
EUT:
Powered soundbar
with powered woofer
with powered woofer
Model Name :
SB300
Temperature:
25℃
Relative Humidity: 52%
Pressure: 1007
hPa
Test Power :
AC 230V/50Hz
Test Mode :
AUX IN; Optical IN
Mode
( V ) AC Power Line
(
) DC Power Line
( )
Signal/Control Line
Test Level
1KV
0.5KV
0.5KV
Port(s)
Polarity
Results
Polarity
Results
Polarity
Results
P B P P
Line (L)
N
B
N N
P
B
P P
Neutral (N)
N
B
N N
P P
P
Ground (PE)
N
N N
P P
P
Signal/Control
Line
N N
N
Criteria
B B
B
Result
B N/A
N/A
Judgment
PASS
N/A
N/A
Note:
1) P/N denotes the Positive/Negative polarity of the output voltage.
2) N/A - denotes test is not applicable in this test report
3) Criteria A: There was no change operated with initial operating during the test.
4) Criteria B: The EUT function loss during the test, but self-recoverable after the test.
5) Criteria C: The system shut down during the test.