JBL CREATURE III (serv.man6) EMC - CB Certificate ▷ View online
Page 17 of 38
Report No. : W12-950-062
IEC
60950-1/Am1
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. IECEN60950_1C
Korea Testing Certification
3.3.5
Wiring terminal sizes
N/A
Rated current (A), type, nominal thread diameter
(mm) ...................................................................... :
(mm) ...................................................................... :
⎯
3.3.6
Wiring terminal design
N/A
3.3.7
Grouping of wiring terminals
N/A
3.3.8 Stranded
wire
N/A
3.4
Disconnection from the mains supply
N/A
3.4.1
General requirement
Not directly connect to mains
N/A
3.4.2 Disconnect
devices
N/A
3.4.3
Permanently connected equipment
N/A
3.4.4
Parts which remain energized
N/A
3.4.5
Switches in flexible cords
N/A
3.4.6
Number of poles - single-phase and d.c. equipment
N/A
3.4.7
Number of poles - three-phase equipment
N/A
3.4.8
Switches as disconnect devices
N/A
3.4.9
Plugs as disconnect devices
N/A
3.4.10 Interconnected
equipment
N/A
3.4.11
Multiple power sources
N/A
3.5
Interconnection of equipment
P
3.5.1 General
requirements
P
3.5.2
Types of interconnection circuits .......................... : SELV circuit only
P
3.5.3
ELV circuits as interconnection circuits
No ELV circuit
N/A
3.5.4
Data ports for additional equipment
N/A
4 PHYSICAL
REQUIREMENTS
N/A
4.1 Stability
N/A
Angle of 10
°
1.6kg < 7kg
N/A
Test
force
(N) ........................................................ : N/A
4.2 Mechanical
strength
N/A
4.2.1 General
N/A
Rack-mounted equipment.
(see Annex DD)
N/A
4.2.2
Steady force test, 10 N
N/A
Page 18 of 38
Report No. : W12-950-062
IEC
60950-1/Am1
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. IECEN60950_1C
Korea Testing Certification
4.2.3
Steady force test, 30 N
N/A
4.2.4
Steady force test, 250 N
N/A
4.2.5 Impact
test
N/A
Fall
test
N/A
Swing
test
N/A
4.2.6
Drop test; height (mm) ........................................... :
N/A
4.2.7
Stress relief test
N/A
4.2.8
Cathode ray tubes
N/A
Picture tube separately certified ............................ : (see separate test report or
attached certificate)
N/A
4.2.9
High pressure lamps
N/A
4.2.10
Wall or ceiling mounted equipment; force (N) ....... :
N/A
4.2.11
Rotating solid media
N/A
Test to cover on the door…………………………….:
N/A
4.3
Design and construction
P
4.3.1
Edges and corners
P
4.3.2
Handles and manual controls; force (N) ............ :
N/A
4.3.3
Adjustable controls
N/A
4.3.4
Securing of parts
N/A
4.3.5
Connection by plugs and sockets
N/A
4.3.6
Direct plug-in equipment
N/A
Torque
.................................................................. :
⎯
Compliance with the relevant mains plug standard
............................................................................... :
............................................................................... :
N/A
4.3.7
Heating elements in earthed equipment
N/A
4.3.8 Batteries
N/A
- Overcharging of a rechargeable battery
N/A
- Unintentional charging of a non-rechargeable
battery
battery
N/A
- Reverse charging of a rechargeable battery
N/A
- Excessive discharging rate for any battery
N/A
4.3.9
Oil and grease
N/A
4.3.10
Dust, powders, liquids and gases
N/A
4.3.11
Containers for liquids or gases
N/A
4.3.12 Flammable
liquids ................................................ :
N/A
Page 19 of 38
Report No. : W12-950-062
IEC
60950-1/Am1
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. IECEN60950_1C
Korea Testing Certification
Quantity of liquid (l) .............................................. :
N/A
Flash point (
°C) .................................................... : N/A
4.3.13 Radiation
N/A
4.3.13.1 General
N/A
4.3.13.2
Ionizing radiation
N/A
Measured
radiation (pA/kg) .................................. :
⎯
Measured
high-voltage (kV) ................................. :
⎯
Measured focus voltage (kV) ............................... :
⎯
CRT
markings ...................................................... :
⎯
4.3.13.3
Effect of ultraviolet (UV) radiation on materials
N/A
Part, property, retention after test, flammability
classification ......................................................... :
classification ......................................................... :
N/A
4.3.13.4
Human exposure to ultraviolet (UV) radiation ...... :
N/A
4.3.13.5
Lasers (including laser diodes) and LEDs
P
4.3.13.5.1 Lasers (including laser diodes)
N/A
Laser class ........................................................... : LED as indicator
⎯
4.3.13.5.2 Light emitting diodes (LEDs)
⎯
4.3.13.6 Other
types ........................................................... :
N/A
4.4
Protection against hazardous moving parts
N/A
4.4.1 General
N/A
4.4.2
Protection in operator access areas .................... :
N/A
Household and home/office document/media
shredders
shredders
(see Annex EE)
N/A
4.4.3
Protection in restricted access locations .............. :
N/A
4.4.4
Protection in service access areas
N/A
4.4.5
Protection against moving fan blades
N/A
4.4.5.1 General
N/A
Not considered to cause pain or injury.
A)………….:
A)………….:
N/A
Is considered to cause pain, not injury.
B) …………:
B) …………:
N/A
Considered to cause injury.
C) …………:
C) …………:
N/A
4.4.5.2
Protection for users
N/A
Use of symbol or
warning ……………………………:
warning ……………………………:
N/A
Page 20 of 38
Report No. : W12-950-062
IEC
60950-1/Am1
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. IECEN60950_1C
Korea Testing Certification
4.4.5.3
Protection for service persons
N/A
Use of symbol or
warning ……………………………:
warning ……………………………:
N/A
4.5 Thermal
requirements
P
4.5.1 General
P
4.5.2 Temperature
tests
P
Normal load condition per Annex L ...................... :
⎯
4.5.3
Temperature limits for materials
(see appended table 4.5)
P
4.5.4
Touch temperature limits
(see appended table 4.5)
P
4.5.5
Resistance to abnormal heat ............................... : (see appended table 4.5.5)
P
4.6
Openings in enclosures
N/A
4.6.1
Top and side openings
N/A
Dimensions
(mm) ................................................. :
⎯
4.6.2
Bottoms of fire enclosures
N/A
Construction of the bottomm, dimensions (mm) .. :
⎯
4.6.3
Doors or covers in fire enclosures
N/A
4.6.4
Openings in transportable equipment
N/A
4.6.4.1
Constructional design measures
N/A
Dimensions
(mm) ................................................. :
⎯
4.6.4.2
Evaluation measures for larger openings
N/A
4.6.4.3
Use of metallized parts
N/A
4.6.5
Adhesives for constructional purposes
N/A
Conditioning temperature (
°C), time (weeks) ........ :
⎯
4.7
Resistance to fire
P
4.7.1
Reducing the risk of ignition and spread of flame
P
Method 1, selection and application of components
wiring and materials
wiring and materials
Supplied by LPS approved
adaptor
adaptor
P
Method 2, application of all of simulated fault
condition tests
condition tests
N/A
4.7.2
Conditions for a fire enclosure
N/A
4.7.2.1
Parts requiring a fire enclosure
N/A
4.7.2.2
Parts not requiring a fire enclosure
N/A
4.7.3 Materials
P
4.7.3.1
General
PCB: V-1, Enclousre:HB
P
Click on the first or last page to see other CREATURE III (serv.man6) service manuals if exist.