Report No. JSH006030498-001 
Page 56 of 82  
 
 
 
Note:    HCP means H
14.2 Block Diagram of Test Setup 
 
 
    
Best EMC 
 
       EU
ESD simulator
  
VCP 
  
HCP 
Insulate  
Support
 
470k
Ω 
Resist
o
GRP 
orizontal Coupling Plane, 
 VCP means Vertical Coupling Plane 
 GRP means Ground Reference Plane 
 
 
14.3 Test Setup and Test Procedure 
 
14.3.1 Test setup  
 
 
Tabletop EUT  
 
The EUT was put on a 0.8m high wooden tabel, standing on the ground reference  
plane(GRP) 2.6m by 1.8m in size, made by aluminium 0.5mm thick.  
 
A horizontal coupling plane(HCP) 1.6m by 0.8m in size was placed on the table, and  
the EUT with its cables were isolated from the HCP by an insulating support thick  
than 0.5mm. The VCP 0.5m by 0.5m in size & HCP were constructed from the same  
material type & thinkmess as that of the GRP, and connected to the GRP via a 470k
Ω  
resistor at each end. 
The distance between EUT and any of the other metallic surface excepted the GRP, HCP 
 & VCP was greater than 1m. 
 
The EUT was arranged and connected according to its functional requirements. 
 
 
Report No. JSH006030498-001 
Page 57 of 82  
 
       Floor standing EUT 
The EUT was put on a 0.1m high wooder support, standing on the ground reference  
plane(GRP) 2.6m by 1.8m, made by aluminuim 0.5mm thick. 
 
A vertical coupling plane (VCP) 0.5m by 0.5m in size, the same material type and
ss as that  
of  the ground reference plane was applied ,and was connected to the GRP via a 470k
Ω resistor at  
each end. 
 
The distance between EUT and any of the other metallic surface excepted the GRP, HCP & VCP  
was greater than 1m. 
The EUT was arranged and connected according to its functional requirements. 
14.3.2 Test Procedure 
 
The EUT was
d and connected according to its functional requirements 
Direct static electricity discharges was applied only to those points and surface which are 
accessible to  
personnel during normal usage. 
The test voltage was increased from the minimum to the selected test level and with single 
discharge.  
On each preselected points 10 times of each polarity single discharge were applied  
The time interval between successive single discharges is 1s. 
The ESD generator was held perpendicula
 surface to which the discharge is applied. The  
discharge return cable of the generator was kept at a distance of 0.2m whilst the discharge is being  
applied. During the contact discharges, the tip of the discharge electrode was touch the EUT before  
air discharges, the round discharge tip of the discharge  
el
ble to touch the EUT. 
A
 removed from the EUT, the generator is then 
triggered  
for a new single discharge.  
o objects placed near the EUT, simulated by applying the 
disch
 the ESD generator to a coupling plane, in the contact discharge mode. 
h polarity single discharge were applied to HCP and VCP. The detail selected 
listed in the following table. 
14.3.
hoto For Test Set-up 
       
14.4
 
 
 
ontact 
(+/-) 
Fail 
 
 thickne
 
 arrange
r to the
the discharge switch is operated. During the 
ectrode was approached as fast as possi
fter each discharge, the ESD generator was
re
Indirect discharge was conducted t
ares  
of
10 times of eac
points are  
3 P
  none 
 Test Protocol 
Temperature  : 
23
°C 
Relative Humidity: 
34% 
Direct discharge was applied at the following selected points: 
Air/ 
Polarity 
Pass/ 
Comment
Test point 
Test level 
[kV] 
C
Contact 
+/- 
All touchable screws of 
enclosure 
Contact 
+/- 
Accessible metal parts of the 
EUT 
Air 
+/- 
Air gap of the switch, button 
Air 
+/- 
The air in-taking opening 
Air 
+/- 
Slots around the EUT 
 
 
 
Report No. JSH006030498-001 
Page 58 of 82  
Indirect contact discharges were applied to the VCP and the HCP at the following selected points: 
Description 
Point 
Result 
Point 
HCP f 
0,1m from the front of the EUT 
Edge of centre,coner  on HCP 
HCP b 
0,1m from the back of the EUT 
Edge of centre,coner  on HCP 
HCP r 
0,1m from the right side of the EUT 
Edge of centre,coner  on HCP 
HCP l 
0,1m from the left side of the EUT 
Edge of centre,coner  on HCP 
VCP f 
0,1m from the front of the EUT 
Edge of centre,coner  on VCP 
VCP b 
0,1m from the back of the EUT 
Edge of centre,coner  on VCP 
VCP r 
0,1m from the right of the EUT 
Edge of centre,coner  on VCP 
VCP l 
0,1m from the left of the EUT 
Edge of centre,coner  on VCP 
 
14.5
 
 Additions, Deviations and Exclusions from Standards 
None
 
 
 
Report No. JSH006030498-001 
Page 59 of 82  
 
15. E
c
mmunit
 
T
u
 
15.1 S
y
erion 
15.1.1 Test level 
 
d repeti
 
lectri  Fast Transient/Burst I
y Test 
est res lt 
PASS 
everit  Level and Performance Crit
Ope circuit output  test voltage(+/-10%) an
tion rate of the impulses (+/- 20%) 
On power supply port PE 
t) signal, 
data and control ports 
On I/O (input & outpu
 
Level 
kV 
kHz 
Voltage peak 
kV 
Repetition rate 
 kHz 
Voltage peak 
Repetition rate 
1  0.5  5 0.25 5 
0.5 5 
3  2 5 1 5 
4 4 
2.5 
2 5 
  X 
Special 
Special 
Special 
Special 
 
Notes : 1. “X” is a an open level. The level has to be specified in the dedicated  equipment specification. 
            2. The gray rows were the selected test level. 
 
 
 
15.1.2 Performance Criterion  
 
 
   Performance 
criterion 
B 
Page of 83