Harman Kardon HS 2X0 (serv.man4) EMC - CB Certificate ▷ View online
Test report no. SH09100839-001
Page 76 of 106
TRF55013a/effective date: September 15
th
, 2009
13.3 Test Setup and Test Procedure
Measurement was performed in shielded room.
Instruments used were following CISPR 16-1 and EN 55020.
Measurement methods and operation conditions of EUT was according to clause 5.1,
Instruments used were following CISPR 16-1 and EN 55020.
Measurement methods and operation conditions of EUT was according to clause 5.1,
5.2 and 5.4 of EN55020.
12.4 Test Protocol
Temperature
:
°C
Relative Humidity:
%
12.5 Additions, Deviations and Exclusions from Standards
None
Test report no. SH09100839-001
Page 77 of 106
TRF55013a/effective date: September 15
th
, 2009
14. Immunity requirements for the enclosure port (S3)
Test result: Pass
14.1 Limits and Performance Criterion
14.1 Limits and Performance Criterion
14.1.1 Limits
14.1.2 Performance Criterion
Performance criterion A
Performance criterion A
Test report no. SH09100839-001
Page 78 of 106
TRF55013a/effective date: September 15
th
, 2009
14.2 Block Diagram of Test Setup
14.3 Test Setup and Test Procedure
Measurement was performed in shielded room.
Instruments used were following CISPR 16-1 and EN 55020.
Measurement methods and operation conditions of EUT was according to clause 5.1,
Instruments used were following CISPR 16-1 and EN 55020.
Measurement methods and operation conditions of EUT was according to clause 5.1,
5.2 and 5.8 of EN55020.
Test report no. SH09100839-001
Page 79 of 106
TRF55013a/effective date: September 15
th
, 2009
14.4 Test Protocol
14.5 Additions, Deviations and Exclusions from Standards
None
Click on the first or last page to see other HS 2X0 (serv.man4) service manuals if exist.