Harman Kardon HD 980 (serv.man3) EMC - CB Certificate ▷ View online
Page 39 of 57 Report No. SH08050531-001
Appendix no. 1 Photos of the product:
TRF No: IEC/EN 60065H
TRF originator Intertek ETL SEMKO SH
The pulleys shall have a semi-circular shaped
groove for circular cords and a flat groove for
parallel twin cords. The
restraining clamps D shall be fixed so that the pull
is always applied by the weight from which the
carrier is mowing away. The carrier shall make 30
000 backward and forward movements (60 000
single strokes). Each conductor of the sample
shall be loaded with the current specified in Table
2.
For twin cords and for light PVC-sheated 3-core
cords, the voltage between the conductors shall
be approximately 230 V a.c. For all other cords
having three or more cores a three-phase a.c.
voltage of about 400 V shall be applied to three
conductors, any additional conductors being
connected to the neutral.
During the test no open-circuit in any core or
short-circuit between cores shall occur.
After the test, any sheath on cords having three
or more cores shall be removed. The cord, or the
laid up cores, shall then withstand the voltage
test specified in Subclause 8.2. or 8.3 as
appropriate, but with a test voltage not exceeding
2000 V.
TABLE 1, TABLE 2, FIGURES 4 and 5, see the
CB bulletin.
groove for circular cords and a flat groove for
parallel twin cords. The
restraining clamps D shall be fixed so that the pull
is always applied by the weight from which the
carrier is mowing away. The carrier shall make 30
000 backward and forward movements (60 000
single strokes). Each conductor of the sample
shall be loaded with the current specified in Table
2.
For twin cords and for light PVC-sheated 3-core
cords, the voltage between the conductors shall
be approximately 230 V a.c. For all other cords
having three or more cores a three-phase a.c.
voltage of about 400 V shall be applied to three
conductors, any additional conductors being
connected to the neutral.
During the test no open-circuit in any core or
short-circuit between cores shall occur.
After the test, any sheath on cords having three
or more cores shall be removed. The cord, or the
laid up cores, shall then withstand the voltage
test specified in Subclause 8.2. or 8.3 as
appropriate, but with a test voltage not exceeding
2000 V.
TABLE 1, TABLE 2, FIGURES 4 and 5, see the
CB bulletin.
*In parenthesis: clauses according to IEC60065:1992.
National differences MALAYSIA, according to CB bulletin No. 1120A
IEC 60065(2001)
IEC 60065(2001)
+ Amendment 1 (2005).
Energy Commission circular no.1 year 2003
(no.1/2003)
States that a Certificate of Approval is required
for manufacturing, selling, Advertising, displaying
or importing into Malaysia, electrical/electronic
products Listed in Annex A.
(no.1/2003)
States that a Certificate of Approval is required
for manufacturing, selling, Advertising, displaying
or importing into Malaysia, electrical/electronic
products Listed in Annex A.
N/A
The supply voltage in Malaysia is 240 Vac, at
50Hz.
50Hz.
Pass
Class 0 and 01 appliances are not allowed
Pass
13A fused plug-tops shall comply to Malaysian
standard (MS 589:Part1:1997), if applicable.
standard (MS 589:Part1:1997), if applicable.
Same as BS1363 type.
Pass
2-pin plug tops shall comply to Malaysian
standard (MS 1578:2003) if applicable
standard (MS 1578:2003) if applicable
N/A
Page 40 of 57 Report No. SH08050531-001
Appendix no. 1 Photos of the product:
TRF No: IEC/EN 60065H
TRF originator Intertek ETL SEMKO SH
External views of EUT
Page 41 of 57 Report No. SH08050531-001
Appendix no. 1 Photos of the product:
TRF No: IEC/EN 60065H
TRF originator Intertek ETL SEMKO SH
Page 42 of 57 Report No. SH08050531-001
Appendix no. 1 Photos of the product:
TRF No: IEC/EN 60065H
TRF originator Intertek ETL SEMKO SH
Click on the first or last page to see other HD 980 (serv.man3) service manuals if exist.