Sony SLV-L45AR / SLV-L65HFAR / SLV-L75HFAR Service Manual ▷ View online
4-19
4-20
CP-1 BOARD (SY-A) SYSTEM CONTROL & SERVO CIRCUIT DIAGRAM (SLV-L65HFAR/L75HFAR)
SLV-L45AR/L65HFAR/L75HFAR
4-22E
4-21
r
There are few cases than the part isn't mounted
in this model is printed on this diagram.
CP-1 P.W.B.
5-1
1-1. REGULAR CHECKS AND
MAINTENANCE ITEMS
To obtain full function and maximum performance from
the set, and to stop it getting dirty or scratched, we
recommend that you carry out the following maintenance
procedures and regular checks. The maintenance checks
described in the following section should also be carried
out without fail after carrying out any repairs to the set.
the set, and to stop it getting dirty or scratched, we
recommend that you carry out the following maintenance
procedures and regular checks. The maintenance checks
described in the following section should also be carried
out without fail after carrying out any repairs to the set.
1-1-1. REGULAR CHECKS
1. MAINTAINING AND CHECKING THE MECHANISM
NOTE: OIL AND GREASE
• Always use the specified brands of oil and grease. If you
use a grease with the wrong viscosity, for example, this
can lead to all sorts of problems. Be careful to keep the
oil and grease free of dust and foreign bodies.
can lead to all sorts of problems. Be careful to keep the
oil and grease free of dust and foreign bodies.
• A “drop” of oil is the amount of oil remaining on the tip of
a rod with a diameter of 1.5mm after it is dipped in oil to
a depth of 1cm and then taken out.
a depth of 1cm and then taken out.
Fig.1-1-1
SECTION 5
ADJUSTMENTS
Clean Check
Oil
Hours of use (H)
Part maintained
500
1000
1500
2000
2500
3000
3500
4000 4500
5000
Remarks
Tape guide
ACE head, full erase head
ACE head, full erase head
Tape path
Cylinder (drum)
system
Cleaner roller assembly
Pinch roller
Reel table
Pinch roller
Reel table
Drive
Reel belt
system
Relay gear, Pulley shaft, Gear shaft
Loading motor
Back tension
Loading motor
Back tension
Perform- Brake system
ance
checks
ance
checks
FWD, REW, PLAY torque,
REV torque
REV torque
( )
( )
( )
( )
( )
( )
( )
( )
( )
The life of parts varies
enormously, depending
on the environment in
which the part is used.
enormously, depending
on the environment in
which the part is used.
Playback tension torque:
30 to 50g/cm
30 to 50g/cm
FWD: 600g/cm or over
REW: 600g/cm or over
PLAY (SP mode):
80 to I 40g/cm
REV: 120 to 220g/cm
REW: 600g/cm or over
PLAY (SP mode):
80 to I 40g/cm
REV: 120 to 220g/cm
1-1-2. CLEANING
1. Cylinder (Drum) (See Fig.1-1-1 )
1. Cylinder (Drum) (See Fig.1-1-1 )
Moisten a chamois with methyl alcohol and clean the video
head (including the Hi-Fi audio head) and the tape path
surface of the cylinder. Be sure to wipe horizontally in
relation to the video head. If you wipe vertically, or use
excessive force, you can damage the video head.
head (including the Hi-Fi audio head) and the tape path
surface of the cylinder. Be sure to wipe horizontally in
relation to the video head. If you wipe vertically, or use
excessive force, you can damage the video head.
2. Tape Path System / Reel Drive System
Clean the pinch roller, the capstan shaft, the tape guides,
the FE head, the ACE head, the reel table, the pulley and
the reel belt with a soft cloth, or chamois, moistened with
methyl alcohol.
the FE head, the ACE head, the reel table, the pulley and
the reel belt with a soft cloth, or chamois, moistened with
methyl alcohol.
Tape path surface
Video head
Cylinder
(Drum)
(Drum)
SLV-L45AR/L65HFAR/L75HFAR
5-2
1-2. SERVICE TOOLS
1-2-1. SERVICE TOOLS
NOTES ON ALIGNMENT TAPES
NOTES ON ALIGNMENT TAPES
Select a PAL or NTSC alignment tape from the list below, according to the transmission system of the VCR you are
repairing.
PAL: For models with 625 scanning lines and a field frequency of 50Hz
NTSC: For models with 525 scanning lines and a field frequency of 60Hz
repairing.
PAL: For models with 625 scanning lines and a field frequency of 50Hz
NTSC: For models with 525 scanning lines and a field frequency of 60Hz
No.
Tool
Tool No.
Remarks
1
Alignment tape NTSC (KRV51N2)
8-192-605-32
NTSC-NORMAL
2
Alignment tape PAL (KRV-51P)
8-192-605-36
PAL-NORMAL
3
Alignment tape NTSC (KRV-52NE)
8-192-605-41
Used to adjust the tape path
4
Alignment tape PAL (KRV-52PL)
8-192-605-46
Used to adjust the tape path
5
Eccentric screw driver
J-6082-044-A
Used to adjust the tape path
6
Nut box
J-6082-045-A
Used to adjust the height of the
lever load assembly
lever load assembly
7
Torque dial gauge
H-7099-039-H
Used to measure reel winding
torque
torque
8
Torque dial gauge adaptor
H-7099-035-H
Used to measure reel winding
torque
torque
9
Cassette torque meter(VHJ-063S)
J-6082-011-A
Used to measure back tension
torque
torque
10
Load lever assembly height adjustment tool
J-6090-055-A
Used to adjust the height of the
load lever assembly
load lever assembly
11
Torque gauge screwdriver
J-6082-047-A
Used to adjust the tightening torque
of screws
of screws
12
3 mm dia. bit for torque screwdriver
J-6082-048-A
Used to replace the bit of the torque
gauge screwdriver
gauge screwdriver
13
Oil
7-661-018-18
14
Grease
7-662-010-04
15
Grease
J-6090-014-A
16
Relay cables
J-6090-057-A
Relay cables of mechanism and
CP-1 PWB assembly
CP-1 PWB assembly
8-192-605-32 (KRV-51N2)
8-192-605-36 (KRV-51P)
8-192-605-41 (KRV-52NE)
8-192-605-46 (KRV-52PL)
8-192-605-36 (KRV-51P)
8-192-605-41 (KRV-52NE)
8-192-605-46 (KRV-52PL)
J-6082-044-A
J-6090-055-A
J-6082-045-A
J-6082-047-A
J-6090-014-A (EM-L30LG)
J-6082-048-A
J-6082-011-A (VHT-063S)
7-662-010-04 (SGL-505)
No. 1–4
No. 5
No. 6
No. 7, 8
No. 9
No. 10
No. 11
No. 12
No. 13
No. 14
No. 15
No. 16
J-6090-057-A
7-661-018-18 (NT-68)
H-7099-039-H
H-7099-035-H
Fig.1-2-1
Click on the first or last page to see other SLV-L45AR / SLV-L65HFAR / SLV-L75HFAR service manuals if exist.