DOWNLOAD Sony SLV-E420CP / SLV-E420VC / SLV-E520CP / SLV-E520UX / SLV-E520VC Service Manual ↓ Size: 6.3 MB | Pages: 66 in PDF or view online for FREE

Model
SLV-E420CP SLV-E420VC SLV-E520CP SLV-E520UX SLV-E520VC
Pages
66
Size
6.3 MB
Type
PDF
Document
Service Manual
Brand
Device
VCR
File
slv-e420cp-slv-e420vc-slv-e520cp-slv-e520ux-slv-e5.pdf
Date

Sony SLV-E420CP / SLV-E420VC / SLV-E520CP / SLV-E520UX / SLV-E520VC Service Manual ▷ View online

5-18
3-12.REEL DRIVE MECHANISM
3-12-1. REEL BELT, REEL PULLEY, FRICTION
GEAR ASSEMBLY AND CLUTCH CHANGE
LEVER (See Fig. 3-12-1)
1) Refer to section 3-2 and remove the mechanism unit.
2) Remove the reel belt 
1
 from the reel pulley 
2
.
3) Take off the washer 
3
 and remove the reel pulley 
2
.
4) Take off the washer 
4
 and remove the friction gear
assembly 
5
.
5) Remove the clutch change spring 
6
.
6) Remove the clamp 
7
 gripping the top of the mecha-
nism chassis, then remove the clutch change lever 
8
.
ASSEMBLY NOTES:
1. After cleaning the shafts 
9
 and 
0
, apply a drop of oil
(VHJ-0099) to each.
2. Be careful not to get any grease on the reel belt 
1
.
1
 Reel belt
3
 Washer
2
 Reel pulley
8
 Clutch change lever
4
 Washer
5
 Friction gear
     assembly
9
 Shaft
0
 Shaft
7
 Clamp
6
 Clutch change
     spring
 Fig. 3-12-1
3-12-2. CLUTCH MOUNTING ASSEMBLY
(See Fig.3-12-2)
1) Refer to section 3-3-1 and remove the cassette mecha-
nism assembly.
2) Refer to section 3-12-1 and remove the reel pulley.
3) Remove the two screws 
1
, then remove the clutch
mounting assembly 
2
.
ASSEMBLY NOTES:
1. Align the two holes 3 with the shafts 
4
 and 
5
. Be
careful not to press part A of the clutch mounting
assembly 
2
 against the band brake assembly.
2. After assembly, make sure that the clamp on the clutch
change lever has snapped into the chassis.
1
 Screws
3
 Hole
2
 Clutch
     mounting
     assembly
5
 Shaft
4
 Shaft
3
 Hole
Part A
Fig. 3-12-2
3-12-3. S SOFT LEVER, SUPPLY REEL ASSEM-
BLY AND S REEL GEAR (See Fig. 3-12-3)
1) Remove the S soft spring 
1
.
2) Remove the clamp 
2
, then remove the S soft lever 
3
.
3) Refer to section 3-12-2 and remove the clutch mounting
assembly.
4) Refer to section 3-11 and remove the band brake
assembly, then remove the supply reel assembly 
4
 and
the S reel gear 
5
.
ASSEMBLY NOTES:
1. After cleaning the shafts 
6
 and 
7
, apply a drop of oil
(VHJ-0099) to each.
2. After assembly, clean the side of the supply reel assem-
bly 
4
.
7
 Shaft
6
 Shaft
5
 S reel
     gear
4
 Supply reel
     assembly
3
 S soft lever
2
 Clamp
1
 S soft
     spring
Fig. 3-12-3
5-19
3-12-4. T SOFT BRAKE ASSEMBLY,  TAKE UP
REEL ASSEMBLY, T REEL GEAR
(See Fig. 3-12-4)
1) Remove the T soft spring 
1
.
2) Remove the clamp 
2
, then remove the T soft brake
assembly 
3
.
3) Refer to section 3-12-2 and remove the clutch mounting
assembly.
4) Pressing the T brake assembly 
4
 in the direction of the
arrow, remove the take up reel assembly 
5
 and the T
reel gear 
6
.
ASSEMBLY NOTE:
1. After cleaning the shafts 
7
 and 
8
, apply a drop of oil
(VHJ-0099) to each.
6
 T reel gear
5
 Take up reel
     assembly
1
 T soft 
     spring
3
 T soft brake
     assembly
4
 T brake
     assembly
   
2
Clamp
8
 Shaft
7
 Shaft
 Fig.3-12-4
3-13. BRAKES
3-13-1. S BRAKE ASSEMBLY, T BRAKE ASSEM-
BLY, T BRAKE ACT SLIDE (See Fig. 3-13-1)
1) Refer to section 3-3-1 and remove the cassette mecha-
nism assembly.
2) Remove the two clamps 
1
, then remove the T brake
act slide 
2
. (Note: You can remove the S brake assem-
bly 
7
 and the T brake assembly 
5
 without removing
the T brake act slide 
2
.)
3) Remove the brake spring 
3
.
4) Remove the two clamps 
4
 simultaneously, then remove
the T brake assembly 
5
.
5) Remove the clamp 
6
, then remove the S brake assem-
bly 
7
.
ASSEMBLY NOTES:
1. Apply grease (VHJ-0100) to the shafts 
8
 and 
9
.
2. When fitting the T brake act slide 
2
, align the mark 
0
with the shaft 
.
6
 
Clamp
3
 Brake spring
1
 Clamp
0
 Mark
2
 T brake act slide
1
 Clamp
 Shaft
8
 Shaft
4
 Clamps
9
 Shaft
7
 S brake
     assembly
5
 T brake
     assembly
 Fig. 3-13-1
5-20
3-13-2. BRAKE CONTROL LEVER AND BRAKE
ACT LEVER ASSEMBLY (See Fig. 3-13-2)
1) Refer to section 3-2 and remove the mechanism unit.
2) Refer to section 3-15 and remove the wheel gear 2.
3) Refer to sections 3-12-1, then remove the reel belt and
the reel pulley.
4) Remove the clamp 
1
, then remove the wheel gear 1
2
.
5) Remove the clutch change spring 
3
.
6) Remove the clamps 
4
 and 
5
, then remove the brake
control lever 
6
. Remove the clamp 
4
 on the topside of
the mechanlsm chassis.
7) Remove the brake return spring 
7
.
8) Refer to section 3-8 and remove the worm gear assem-
bly.
9) Remove the clamp 
8
 and clamp 
5
, then remove the
brake act lever assembly 
9
. To maintain the perfor-
mance of the brake act lever assembly 
9
, do not
disassemble it.
ASSEMBLY NOTES:
1. Apply grease (VHJ-0100) to the shafts 
0
 and 
, to the
teeth of the wheel gear 1 
2
. and to the pin 
!™
 of the
brake control lever 
6
 .
2. Put the pin 
 of the brake control lever 
6
 into the cam
groove 
 of the crescent slide.
3. Before fitting the wheel gear 1 
2
 , align the hole 
!∞
 with
the hole 
 on the mechanism chassis.
4. Refer to section 3-15 and align the wheel gear 2.
 Pin
!™
 Pin
6
 Brake control lever
8
 Clamp
5
 Clamp
0
 Shaft
 Shaft
 Hole
4
 Clamp
!∞
 Hole
1
 Clamp
2
 Wheel
     gear 1
3
 Clutch change
     spring
9
 Brake act
     lever assembly
   
7
 Brake return
     spring
 Cam
     groove
Fig. 3-13-2
3-13-3. S BRAKE ACT SLIDE AND BT SPRING
LEVER ASSEMBLY
(See Figs. 3-13-3 and 3-13-4)
1) Refer to section 3-16 and remove the crescent slide.
2) Refer to section 3-12-1 and remove the friction gear
assembly.
3) Slide the S brake act slide 
1
 in the direction of the
arrow 
A
 , then remove it.
4) Refer to section 3-11 and remove the BTspring.
5) Press the BTspring lever assembly 
2
 until it touches
the pin 
3
, then remove it.
ASSEMBLY NOTES:
1. Apply grease (VHJ-0100) to the shaft 
4
 shown in Fig.
3-13-3, and to the BT spring lever assembiy 
2
 and the
S brake act slide 
1
 shown in Fig. 3-13-4.
2. After mounting the BT spring lever assembly 
2
 on the
Shaft 
4
, hook the BT spring onto the clamp 
5
 and
press it until it touches the pin 
6
.
3. Make sure that the clamps 
7
8
 and 
9
 have snapped
Into the S brake act slide 
1
. Align the arrow 
0
 on the
S brake act slide 
1
 with the arrow 
 on the mecha-
nism chassis.
5
 Clamp
 Arrow on mechanism chassis
1
 S brake act slide
7
 Clamp
9
 Clamp
8
 Clamp
3
 Pin
6
 Pin
A
4
 Shaft
0
 Arrow
2
 BT spring
     lever
     assembly
Fig. 3-13-3
Apply grease
Apply grease
Apply grease
2
 BT spring
     lever
     assembly
1
 S brake
     act
     slide
 Fig. 3-13-4
5-21
3-14.GUIDES
3-14-1. GUIDE ROLLER ASSEMBLY
(See Fig. 3-14-1)
1) Unscrew the two screws 
1
. When you do this, be
careful not to damage the cylinder or the video head.
2) Remove the two guide roller assemblies 
2
 by unscrew-
ing them anticlockwise.
ASSEMBLY NOTES:
1. Tighten the two screws 
1
 to a torque of 600 g/cm. After
tightening, apply a screw-locking glue.
2. After replacing the parts, be sure to clean the guide
roller and carry out tape path adjustment as described
in section 4-3.
1
 Screw
1
 Screw
2
 Guide
     roller
     assembly
2
 Guide
     roller
     assembly
Fig. 3-14-1
3-14-2. S AND T INCLINE MOUNTING
 ASSEMBLIES (See Fig. 3-14-2)
1) Refer to section 3-2 and remove the mechanism unit.
2) Refer to section 3-4 and remove the cleaner lever.
3) Remove the four screws 
5
 and take off the two catcher
mountings 
6
.
4) Refer to section 3-1 and rotate the loading motor in the
PLAY direction until tape loading is completed.
5) Shift the S incline mounting assembly 
1
 slightly, in the
direction of the arrow 
A
, then remove it from the S load
lever assembly 
2
.
6) Shift the T incline mounting assembly 
3
 slightly, in the
direction of the arrow 
B
, then remove it from the T load
lever assembly 
4
.
ASSEMBLY NOTES:
1. Apply grease (VHJ-0100) to the rail (top, underside and
sides) on the mechanism chassis.
2. When fitting the S and T incline mounting assemblies 
1
and 
3
 into the rail, turn the loading motor manually in
the EJECT direction. When tape unloading begins,
watch out in case the S and T incline mounting assem-
blies 
1
 and 
3
 get caught in the rail.
3. Aline the dowels on the catcher mounting 
6
 with the
holes 
7
 in the mechanism chassis.
4. After repiacing the parts, clean the cylinder and the
roller guide, then adjust the tape path as described in
section 4-3.
B
A
1
 S incline mounting
     assembly
4
 T load lever
     assembly
2
 S load lever
     assembly
Apply grease to the top,
underside and side of the rail.
7
Holes
6
 Catcher
     mounting
5
 Screws
5
 Screws
7
 Holes
3
 T incline
     mounting
     assembly
Fig. 3-14-2
Page of 66
Display

Click on the first or last page to see other SLV-E420CP / SLV-E420VC / SLV-E520CP / SLV-E520UX / SLV-E520VC service manuals if exist.