DOWNLOAD Sony SLV-E420CP / SLV-E420VC / SLV-E520CP / SLV-E520UX / SLV-E520VC Service Manual ↓ Size: 6.3 MB | Pages: 66 in PDF or view online for FREE

Model
SLV-E420CP SLV-E420VC SLV-E520CP SLV-E520UX SLV-E520VC
Pages
66
Size
6.3 MB
Type
PDF
Document
Service Manual
Brand
Device
VCR
File
slv-e420cp-slv-e420vc-slv-e520cp-slv-e520ux-slv-e5.pdf
Date

Sony SLV-E420CP / SLV-E420VC / SLV-E520CP / SLV-E520UX / SLV-E520VC Service Manual ▷ View online

5-10
3-3-4. START RACK GEAR AND FRONT RACK
GEAR (See Figs. 3-3-5 and 3-3-6)
1) Remove the mechanism unit, referring to section 3-2.
2) Remove the cassette mechanism assembly, referring to
section 3-3-1.
3) Remove the special screw 
1
. When you dothis, slide
the front rack gear assembly 
2
 towards the front until it
stops, then take it off the shaft 
3
. Take care not to
damage the shaft 
3
.
4) Remove the spring 
4
.
5) Remove the clamp 
6
 on the front rack gear 
5
, then
remove the start rack gear 
7
.
ASSEMBLY NOTES:
1. Apply grease (VHJ-0100) to the front rack gear 
5
 and
all over the inside of the groove on the start rack gear
7
.
2. Align the positioning mark 
8
 on the front rack gear 
5
with the mark 
0
 on the main cam 
9
.
3. When installing the cassette mechanism assembly,
refer to section 3-3-1 and align the start rack gear with
the pinion gear.
6
 Clamp
1
 Special screw
4
 Spring
7
 Start rack gear
     (apply grease to
      inside of groove)
5
 Front rack gear
     (apply grease to
      inside of groove)
3
Shaft
2
 Front rack
     gear assembly
Fig.3-3-5
8
 Positioning mark
5
 Front rack
     gear
0
 Positioning mark
9
 Main cam
Flg.3-3-6
3-4. CLEANER ROLLER ASSEMBLY
(See Fig. 3-4-1 )
1) Remove the clamp 
1
 and take out the cleaner lever 
2
.
When you do this, be careful not to bend the plastic
springs 
A
 and 
B
 on the cleaner lever 
2
.
2) Remove the clamp 
3
, and take out the cleaner roller
assembly 
4
. Be careful not to touch the sponge on the
cleaner roller assembly 
4
.
ASSEMBLY NOTES:
1. When mounting the cleaner lever 
2
 on the shaft 
5
,
press the clamp 
1
 in the direction shown by the arrow,
and snap it into the mounting 
6
 on the audio R/P head
assembly.
4
 Cleaner roller assembly
3
 Clamp
2
 Cleaner lever
1
 Clamp
A
 Plastic spring
5
 Shaft
6
 Mounting
B
 Plastic spring
Fig.3-4-1
5-11
3-5.CYLINDER (DRUM)
3-5-1. UPPER CYLINDER ASSEMBLY
(UPPER DRUM)
(See Figs. 3-5-1,3-5-2,3-5-3,3-5-4)
There are two types of cylinders, one that can be disas-
sembled into the upper cylinder (upper drum) and Iower
cylinder (lower drum) and one that cannot. For that type
that can not, replace the cyli nder assembl y as a whole.
1) Remove the two screws 
1
 (See Fig. 3-5-1).
2) First, tighten the handle 
2
 of the video head removing
tool (VHJ-0041), then screw the two long screws 
3
evenly into the two screw holes 
5
 in the upper cylinder
assembly (upper drum) 
4
 (See Fig. 3-5-2 ).
3) Hold the tool (VHJ-0041) so that the upper cylinder
assembly (upper drum) 
4
 does not rotate, and at the
same time, turn the handle 
2
 clockwise, and remove
the upper cylinder assembly (upper drum) 
4
.
4) Remove the tool (VHJ-0041) from the upper cylinder
assembly 
4
.
1
 Screws
Fig.3-5-1
Video head removing tool
(VHJ-0041)
2
 Handle
3
 Long
     screws
5
Screw
holes
4
 Upper cylinder assembly
     (upper drum)
6
 Lower cylinder assembly
     (lower drum)
Fig.3-5-2
ASSEMBLY NOTES:
1. When carrying out assembly, the CH-1 head on the
upper cylinder assembly (upper drum) 
4
 and the lower
cylinder assembly (lower drum) 
6
 must be aligned. The
CH-1 head on the upper cylinder assembly 
4
 bears a
code 
7
 such as 2N2S-V, 2N4N, or 4H6N, as shown in
Fig. 3-5-3. The CH-1 on the lower cylinder assembly 
6
has a round hole 
8
, as shown in Fig. 3-5-4. Assemble
the parts so that the round hole 
8
 is next to the code
7
 on the upper cylinder assembly.
2. Be careful not to scratch the tape path surface of the
cylinder. After replacing the cylinder, clean the tape
path surface of the cylinder.
3. After replacing the upper cylinder assembly, do the
tape path adjustment as instructed in section 4-3 and
do the swithching position adjustment of the servo
circuit.
4
 Upper cylinder assembly
     (upper drum)
7
 Code
Fig. 3-5-3
[EXCEPT FOR 2-HEAD MONAURAL MODELS]
 
6
 Lower cylinder
     assembly
     (lower drum)
8
 Round hole
Screw holes
[2-HEAD MONAURAL MODELS ONLY]
6
 Lower cylinder
     assembly
     (lower drum)
8
 Round hole
Fig. 3-5-4
5-12
3-5-2. CYLINDER MOTOR (ROTOR AND STATOR)
(See Fig. 3-5-5)
1) Refer to section 3-2 and remove the mechanism unit.
2) Remove the screw 
1
 and remove the cylindere arth
assembly 
2
 .
3) Remove the two screws 
3
, the rotor 
4
 and the spacer
8
 .
4) Remove the three screws 
5
 and the stator 
6
.
ASSEMBLY NOTES:
1. When fitting the rotor 
4
, align the long hole 
9
 -beside
the triangular mark on the rotor 
4
 - with the hole 
0
 in
the rotor disk.
2. When fitting the screws 
3
 and 
5
, use the torque
gauge screwdriver (VHJ-0014). Give the screws a
tightening torque of 3 kg/cm.
3. Align the dowels 
 on the cylinder earth assembly 
2
with the holes 
!™
 in the chassis.
4. After fitting the mechanism unit, do the switching
position adjustment of the servo circuit.
3
 Screws
4
 Rotor
9
 Long hole (used for
     alignment when fitting
     the rotor)
Triangular mark
5
 Screws
6
 Stator
8
 Spacer
1
 Screws
2
 Cylinder
     earth
     assembly
 Dowels
!™
 Holes
0
 Hole (Use for alignment
     when fitting the rotor)
Fig. 3-5-5
3-5-3. CYLINDER ASSEMBLY (See Fig. 3-5-6)
1) Refer to sections 3-5-3, and remove the cylinder unit,
the rotor, and the stator.
2) Remove the three screws 
1
 and the cylinder assembly
2
.
ASSEMBLY NOTES:
1.Be careful not to scratch or soil the top of the cylinder.
After fitting the cyiinder, clean the surface.
2.Align the cylinder assembly 
2
 with the two dowels 
4
 on
the mechanism chassis 
3
.
3.After fitting the cylinder assembly, do the tape path
adjustment as instructed in section 4-3 and do the
switching position adjustment of the servo circuit.
2
 Cylinder
     assembly
4
 Dowels
1
 Screws
3
 Mechanism
     chassis
Fig.3-5-6
5-13
3-6. FE HEAD AND ACE HEAD
3-6-1. AUDIO R/P HEAD ASSEMBLY (ACE HEAD)
 (See Fig. 3-6-1 )
1) Unplug the connector from the audio R/P head assem-
bly (ACE head).
2) Remove the two screws 
1
 and the audio R/P head
assembly (ACE head) 
2
.
ASSEMBLY NOTES:
1. Align the hole 
3
 on the audio R/P head assembly
(ACE head) with the pin 
4
 on the chassis unit.
2. After assembly, check that the clamp 
5
 on the cleaner
roller assembly has snapped into the mounting of the
audio R/P head assembly (ACE head) 
2
.
3. After assembly, clean the surface of the head with a
soft cloth or chamois.
4. After assembly, refer to section 4-3, and adjust the
head height, the azimuth and the tracking (X) position.
       
1
 Screws
2
 Audio R/P head assembly
     (ACE head)
3
 Hole
5
Clamp
4
 Pin
Fig. 3-6-1
3-6-2. FULL ERASE HEAD (See Fig.3-6-2)
1) Unplug the connector from the full erase head 
1
.
2) Remove the screw 
2
 and the full erase head 
1
.
ASSEMBLY NOTE:
1. After assembly, clean the full erase head 
1
.
      
2
 Screw
1
 Full erase head
Fig. 3-6-2
Page of 66
Display

Click on the first or last page to see other SLV-E420CP / SLV-E420VC / SLV-E520CP / SLV-E520UX / SLV-E520VC service manuals if exist.