DOWNLOAD Sony SLV-D940PAZ / SLV-D940PEA / SLV-D940PME Service Manual ↓ Size: 12.55 MB | Pages: 122 in PDF or view online for FREE

Model
SLV-D940PAZ SLV-D940PEA SLV-D940PME
Pages
122
Size
12.55 MB
Type
PDF
Document
Service Manual
Brand
Device
VCR
File
slv-d940paz-slv-d940pea-slv-d940pme.pdf
Date

Sony SLV-D940PAZ / SLV-D940PEA / SLV-D940PME Service Manual ▷ View online

2-9
2
CONNECTOR WAFER
1
CABLE FLAT
3
CONNECTOR WAFER
2-4-5 Gear Worm Wheel Removal
1) Remove the Gear Worm wheel 1.
Fig. 2-16 Gear Worm Wheel Removal
2-4-6 Cable Flat  Removal
1) Remove the Drum connecting part of Cable Flat 1 from Connector
Wafer 2.
2) Remove the Loading Motor connecting part of Cable Flat 1 from
Connector Wafer 3.
Fig. 2-17 Cable Flat Removal
1
GEAR WORM WHEEL
2-10
1
SCREW
2
BRAKET GEAR
4
GEAR JOINT 1
3
GEAR JOINT 2
2
MOTOR LOADING ASS`Y
1
SCREW
2-4-7 Motor Loading Ass’y Removal
1) Remove the Screw 1.
2) Remove the Motor Loading Ass’y 2.
Fig.2-18 Motor Loading Ass’y Removal
2-4-8 Bracket Gear, Gear Joint 2, 1 Removal
1) Remove the Screw 1.
2) Remove the Bracket Gear 2.
3) Remove the Gear Joint 2 3.
4) Remove the Gear Joint 1 4.
Assembly:
1) Be sure to align dot mark of Gear Joint 1 1 with dot mark of
Gear Joint 2 2 as shown Fig 2-20.
(Refer to Timing point1)
2) Confirm the Timing Point 2 of the Gear Joint 2 2  and Slider
Cam 3.
Fig. 2-19 Bracket Gear, Gear Joint 1,2 Removal
Fig. 2-20 Gear Joint 1,2 Assembly
1
GEAR JOINT1
2
GEAR JOINT2
3
SLIDER CAM
TIMING POINT 1
TIMING POINT 2
2-11
2-4-9 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass’y Removal
1) Remove the Belt Pulley. (Refer to Fig. 2-38)
2) Remove the Gear Loading Drive 1 after releasing Hook [A] in
the direction arrow as shown in detail drawing.
3) Remove the Slider Cam 2.
4) Remove the Lever Load S 3, Link Load S 5 & Lever Load T 4,
Link Load T 6.
Fig. 2-21 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass’y Removal
2-4-10 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass’y Assembly
1) When reinstalling, be sure to align dot of Lever T Load Ass’y 1
with dot of Lever S Load Ass’y 2 as shown in drawing, (Refer to
Timing Point 1).
2) Insert the Pin A,B,C,D into the Slider Cam 3 hole.
3) Be sure to align dot of Lever T Load 1 and dot of Gear Loading
Drive 4, (Refer to Timing Point 2).
4) Aline dot of Gear Loading drive 4 with mark of Slider Cam 3 as
shown in drawing (Refer to Timing Point 3).
Fig. 2-22 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass’y Assembly
1
GEAR LOADING DRIVE
3
LEVER LOAD S
4
LEVER LOAD T
2
SLIDE CAM
HOOK(A)
5
 LINK LOAD S
6
 LINK LOAD T
2
LEVER S LOAD ASS'Y
1
LEVER T  LOAD ASS'Y
TIMING POINT 1
2
 LEVER S LOAD S ASS'Y 
1
 LEVER T LOAD ASS'Y
PIN A
PIN C
PIN B
PIN D
3
 SLIDER CAM
TIMING POINT 2
TIMING POINT 3
4
 GEAR LOADING DRIVE
2-12
1
SPRING TENTION LEVER
2
LEVER TENTION A
3
BAND BRAKE ASS
STOPPER
MARK[B]
"A"
2-4-11 Lever Pinch Drive,
Lever Tension Drive Removal
1) Remove the Lever Pinch Drive 1, Lever Tension Drive 2.
Fig. 2-23 Lever Pinch Drive,
Lever Tension Drive Removal
2-4-12 Lever Tension Ass’y,
Band Brake Ass’y Removal
1) Remove the Lever Brake S Ass’y (Refer to Fig 2-25).
2) Remove the Spring Tension Lever 1.
3) Rotate stopper of Main Base in the direction of arrow “A”.
4) Lift the Lever Tension Ass’y 2 & Band Brake Ass’y 3.
Note:
1) When replacing the Lever Tension Ass’y 2, be sure to apply Grease
on the post.
2) Take care not to touch stain on the felt side, and not to be folder
and broken Band Brake Ass’y
3) After Lever Tension Ass’y seated, Rotate stopper of Main Base to
the Mark[B].
Fig. 2-24 Lever Tension Ass’y,
Band Brake Ass’y Removal
1
LEVER PINCH DRIVE 
2
LEVER TENSION DRIVE 
Page of 122
Display

Click on the first or last page to see other SLV-D940PAZ / SLV-D940PEA / SLV-D940PME service manuals if exist.