DOWNLOAD Sony KV-SW213M85 Service Manual ↓ Size: 6.21 MB | Pages: 67 in PDF or view online for FREE

Model
KV-SW213M85
Pages
67
Size
6.21 MB
Type
PDF
Document
Service Manual
Brand
Device
TV
File
kv-sw213m85.pdf
Date

Sony KV-SW213M85 Service Manual ▷ View online

– 12 –
KV-SW213M85/N63
   RM-GA002
2-9.  Top Switch wire dressing
2-10.  DY Connector Dressing
DY Connector
Conn Assy, 5P (200V)
Earth Assy, Coating
1) DY Connector
goes underneath of
Earth Assy, Coating
and Connector Assy,
5P (200V) wire.
2) DY Connector goes above
Connector Assy, 5P (200V) wire.
Purse Lock Ø5
Black tape
Top switch wire
under DGC & left
of black tape
Top switch
wire under
DGC & right
of black tape
Ensure Top Switch wire
is dressed around AC
Power Cord --> keep
away from heatsink
1
2
3
3) Dress DY
Connector and
Connector Assy, 5P
(200V) wire with Purse
Lock Ø5.
Use heatsink height to
estimate purse lock location
Purse Lock Ø5
Dress wires away
from FBT area
Conn Assy, 5P
(200V)
DY Connector
TVSR (Clause 9.4.7):
All wires must be kept away from FBT
area by a distance of 10mm or more.
Make sure DY Connector is on
the right side of Earth Assy, Coating.
– 13 –
KV-SW213M85/N63
   RM-GA002
2-11.  Lead Assy, G2 and Lead Assy, Focus dressing
2-12.  Conn Assy, 7P, Connector Assy, 3P, Lead Assy, Earth & Rotational Coil Conn dressing
Purse Lock Ø5
Use this as a
reference to
dress ECA,
Lead Assy,
Focus & G2
 
Lead Assy, Focus
Conn. Assy, 5P (200V)
Earth Assy, Coating
Lead
Assy,
G2
Purse Lock Ø5
HV Cable
Keep Lead Assy,
G2 away from HV
Cable 
(as least 1mm/kv)
Keep Lead Assy,
G2 away from
Heat Sink.
Lead Assy, G2
Lead Assy,
G2
Lead Assy,
Focus
Earth Assy,
Coating
Purse Lock Ø5
3D models 
Purse Lock Ø9
Lead Assy, Earth
Conn Assy, 7P
Keep wires away
from heat sinks
UL Wire (1-923-000-81)
Conn Assy, 3P 
Rotational Coil Conn 
Non 3D models
Purse Lock Ø5
Conn Assy, 7P
Rotational Coil Conn
Lead Assy, Earth
UL Wire (1-923-000-81)
Lead Assy, Earth
Connector Assy, 7P
 UL Wire
Rotational Coil Conn.
Conn Assy, 3P
DY
90
o
Wire from
Rotation Coil
Connector Assy, 7P
Lead Assy, Earth
  UL Wire
Lead Assy, Focus & Lead Assy, G2 is pulled straight up
from FBT to Earth Assy, Coating & dressed together with
purse lock Ø5
TVSR (Clause 9.4.7) :
- Keep HV cables away from
  conductive parts 1mm/KV or more
Keep wires away
from heat sinks
UL Tape
UL Tape
Purse Lock Ø9
Purse Lock Ø5
Rotational Coil Conn
CAUTION:
1. Do not overpull the wires during dressing --> avoid
disconnection of wires.
2. Make sure wires are kept away from
sharp edges, heatsinks & other high-temperature parts.
Rotation Coil
– 14 –
KV-SW213M85/N63
   RM-GA002
2-13.  HV Lead Assy dressing
2-14.  AC Power Cord Dressing
180 ± 5 mm
HV Holder Combi
HV Holder Combi
Purse Lock Ø9 
HV Holder Combi 
Dress HV Holder
Combi with Purse
Lock Ø9 as shown
Fix the bigger diameter hook of HV
Holder Combi on the right side of
black tape & at horizontal bending
of DGC, then use purse lock Ø9 to
secure HV Holder Combi to DGC
SAFETY OPERATION
45º
B
A
A
A
C
DGC
Purse Lock Ø9
PWB Bracket hook 
Dress AC Power Cord at PWB Bracket hook as shown.
Terminal Bracket 
AC Cord Holder
AC Power Cord
 Dress AC Cord Holder at the terminal bracket. 
DGC
Conn
outlet
Black tape
Place purse lock Ø9 after the
exit of DGC conn from DGC
TVSR (Clause 9.4.7):
A) Spacing between HV cable and
conductive part's surface --1mm/kV
or more
B) Spacing between edge of anode
cap and conductive parts -->
0.5mm/kV or more
C) Spacing between HV cable &
enclosure with ventilation (i.e. Rear
Cover side) --> 10mm or more
CAUTION:
Keep HV cable facing inwards DY to keep HV cable away from
ventilation side of rear cover --> 10mm or more.
Ensure TVSR 1mm/kV is kept from HV cable to DY & other
conductive parts
– 15 –
KV-SW213M85/N63
   RM-GA002
The following adjustments should be made when a complete
realignment is required or a new picture tube is installed.
The controls and switch should be set as follows unless
otherwise noted:
Picture control ......................................................... NORMAL
Brightness control ................................................... NORMAL
Perform the adjustments in order as follows:
1. Beam Landing
2. Convergence
3. Focus
4. G2 (SCREEN)
5. White Balance
Note: Test Equipment Required
1. Pattern Generator
2. Degausser
3. DC Power Supply
4. Digital Multimeter
SECTION 3
SET-UP ADJUSTMENTS
Preparation :
• Feed in the white pattern signal.
• Before starting, degauss the entire screen with the
degausser.
• In order to reduce the geomagnetism on the set's
picture tube, face it east or west.
3-1. BEAM LANDING ADJUSTMENT
1. Input a raster signal with the pattern generator.
2. Loosen the deflection yoke mounting screw, and set the
purity control to the center as shown below.
3. Set the raster signal of the pattern generator to green.
4. Move the deflection yoke (DY) backward and adjust the
purity control so that green is in the center and blue and
red are at the sides evenly.
5. Then move the DY forward and adjust so that the entire
screen becomes green.
6. Now switch over raster signal to red then blue and
confirm the condition.
...................................................................................................................................................................................................................... ...........
5. Oscilloscope
6. Landing Checker
7. XCV Adjuster
Purity control
Red
Blue
Green
7. When the position of the DY is determined, tighten it
with the DY mounting screw.
8. If the beam does not land correctly in all corners of the
screen, use magnet disc to correct it.
3-2. CONVERGENCE ADJUSTMENT
Preparation :
• Before starting, perform FOCUS adjustment.
• Picture mode STANDARD.
• Receive dot/cross hatch pattern.
a) Vertical Static Convergence
Purity control
corrects this area.
Disc magnets or rotatable
disc magnets correct these
areas (a-d).
Deflection yoke positioning
corrects these areas.
a
b
b
c
c
d
d
a
Center dot
R    G    B
R
G
B
4 pole magnet
C/CV Board
Page of 67
Display

Click on the first or last page to see other KV-SW213M85 service manuals if exist.