Sony KLV-26V300A / KLV-32V300A / KLV-40V300A / KLV-46V300A (serv.man2) Service Manual ▷ View online
– 24 –
KLV-26/32/40/46V300A
RM-GA008
2-2-10. Dress SP Connector assy 4P with slide
clamp (2X)
2-2-9. Dress SP Connector Assy 4P with
FG Clamp to Top DTT shield
2-2-8. Dress Connector Assy 20P(H1 wire) with Tape(LCD) & Slide Clamp.
2-2-11. i) Dress Connector Assy 20P (H4 wire) & SP Connector Assy 4P with G1 bracket's hook (4X)
ii) Apply Sheet(Core)C on LCD panel
iii) Dress Connector Assy 20P (H4 wire) with Tape(LCD)
Connector assy 20P
(H1 wire)
(H1 wire)
Tape(LCD)
SP Connector
Assy 4P
Assy 4P
End of UL tape as
reference line
reference line
Screw 3X8
Screw boss
Caution : Pull away from
screw boss
screw boss
Sheet(Core) C
Connector Assy 20P
(H4 wire)
(H4 wire)
Make sure Connector assy 20P(H4 wire)
is not tight when apply Tape LCD.
is not tight when apply Tape LCD.
Tape(LCD)
SP Connector Assy 4P
Screw boss
Caution : Pull away from screw boss
FG Clamp
Make sure wire is
not trapped
when install Top
DTT to bottom DTT
shield
not trapped
when install Top
DTT to bottom DTT
shield
– 25 –
KLV-26/32/40/46V300A
RM-GA008
2-2-13. i) Dress AC inlet wire with G1 bracket's hook
ii) Make sure AC inlet wire is keey away from
from heat sink
2-2-12. Dress Connector assy 20P and SP Connector
Assy 4P underneath AC filter inlet
2-2-15. Screw Connector Assy 1P to the direction
2-2-14. i) Dress Connector Assy 20P with
Side Jack bracket's hook
ii) Screw Connector Assy 1P to the direction
2-3-1. Wire dressing overview.
2-3. (KLV-40V300A)
SP Connector Assy 4P
Connector Assy 20P
(H4 wire)
(H4 wire)
AC inlet wire
Heat Sink
Connector Assy 20P
Connector Assy 1P
Connector Assy 1P
– 26 –
KLV-26/32/40/46V300A
RM-GA008
2-3-4. i) Dress Connector Assy 11P & 12P at G3
bracket's hook
ii) Dress Connector Assy 11P & 12P
with Sheet(Core)C
2-3-3. Dress Connector Assy 11P, 12P & 20P with
Clamp Edge(M)
2-3-2. Dress LVDS cable with Sheet(Core)C and put under Connector assy 12 & 11P
2-3-5. Dress Connector Assy 20P with Tape(LCD)
LVDS cable
Connector Assy 12P & 11P
Sheet (Core)C
Put LVDS cable straight
Clamp Edge(M)
Connector Assy 20P
Connector Assy 11P
Connector Assy 12P
Connector Assy 11P
Connector Assy 12P
Sheet (Core)C
Connector Assy 20P
Tape(LCD)
– 27 –
KLV-26/32/40/46V300A
RM-GA008
2-3-8. Dress SP Connector Assy 4P with FG Clamp
to Top DTT shield
2-3-10. Dress Connector Assy 20P (H4 wire) &
SP Connector Assy 4P with G3 bracket's
hook(2X), Slide Clamp(3X) & Tape(LCD)
2-3-9. Dress SP Connector assy 4P with slide
clamp(3X) and Tape(LCD)
2-3-7. i) Apply Sheet(Core)C on LCD panel
ii) Dress Connector Assy 20P with Tape(LCD)
2-3-6. Dress Connector Assy 20P(H1 wire) with Tape(LCD)(2X)
Tape(LCD)
Connector assy 20P
(H1 wire)
(H1 wire)
Tape(LCD)
Connector assy 20P
Tape(LCD)
Follow panel's marking
Sheet(Core)C
Make sure Connector assy 20P
is not tight when apply Tape LCD.
is not tight when apply Tape LCD.
Make sure wire is
not trapped
when install Top
DTT to bottom DTT
shield
not trapped
when install Top
DTT to bottom DTT
shield
SP Connector Assy 4P
End of UL tape as
reference line
reference line
FG Clamp
Screw 3X8
Tape(LCD)
Screw boss
Caution : Pull away from
screw boss
screw boss
Connector Assy 20P
(H4 wire)
(H4 wire)
Tape(LCD)
SP Connector Assy 4P
Screw boss
Caution :
Pull away
from
screw boss
Pull away
from
screw boss
Click on the first or last page to see other KLV-26V300A / KLV-32V300A / KLV-40V300A / KLV-46V300A (serv.man2) service manuals if exist.