DOWNLOAD Sony KE-42M1 / KE-MV42A1 / KE-MV42M1 / KE-P42M1 Service Manual ↓ Size: 2.06 MB | Pages: 51 in PDF or view online for FREE

Model
KE-42M1 KE-MV42A1 KE-MV42M1 KE-P42M1
Pages
51
Size
2.06 MB
Type
PDF
Document
Service Manual
Brand
Device
TV / PANEL MODULE
File
ke-42m1-ke-mv42a1-ke-mv42m1-ke-p42m1.pdf
Date

Sony KE-42M1 / KE-MV42A1 / KE-MV42M1 / KE-P42M1 Service Manual ▷ View online

- 36 - 
1)  Install the X-Main and Y-Main Ass'y boards onto the Chassis Base as shown in the 
figure on the previous page, using the following specified screws. 
 
Board 
Screw 
Number of screws 
X-MAIN 
M3 x L10 
Y-MAIN 
M3 x L10 
Y-BUFFER 
M3 x L10 
10 
 
2)  The securing order is as follows: (1) center of each Main Board Ass'y, (2) right and left 
of the Main Board Ass'y, and (3) others. 
 
(The order depends on the alignment of the Chassis Base and the Main Board Ass'y.) 
2)  Tighten securely the screws on each Main Board Ass'y using the electric screwdriver. 
 
 
 
 
5-4-4.  Installing the Logic PCB Ass'y board on the Chassis Base 
 
LOGIC MAIN
ASSYBOAR
D
Chassis Base
F Type
 
 
Chassis Base 
F Type 
LOGIC MAIN 
ASSY BOARD 
- 37 - 
1)  Install the Logic Main Board Ass'y onto the Chassis Base as shown in the figure on 
the previous page, using the following specified screws. 
 
Board 
Screw 
Number of screws 
LOGIC  BOARD 
M3 x L10 
 
2)  The securing order is as follows: (1) center of the Logic Main Board Ass'y, (2) right 
and left of the Logic Main Board Ass'y, and (3) others. 
 
(The order depends on the alignment of the Chassis Base and the Logic Main Board 
Ass'y.) 
 
3)  Tighten securely the screws on the Logic Main Board Ass'y using the electric 
screwdriver. 
 
- 38 - 
6.  Operation Checks After Repair Service 
 
6-1. Check 
Items 
    
xxxxx    
Check Item    
Specification    
Remarks    
TCP  
Drive board 
 
Y Buffer 
 
Logic and Logic Buffer 
Securely connected or tightened 
 
Harness 
Securely connected 
 
Module 
assemble check 
Foreign materials 
No foreign materials 
 
    
    
6-2. Check 
Procedure 
1)  Check visually the following: (1) the module is correctly assembled, (2) the 
connections have no problem, and (3) the grounding and easily short-circuited parts 
are not damaged.   
2)  Check that the dip switch is inside the module. 
3)  Turn on the power of the PDP module, and check that the LED lights up and the unit 
correctly functions. 
4)  Check the power voltages, and also check the display condition by tapping slightly the 
Y-FPC several times.   
5)  Check that Full White pattern is normal. 
6)  If the pattern is abnormal, adjust each voltage using the multi-meter and adjustment 
tools. 
7)  Adjust the waveforms using the oscilloscope. 
8)  Display each pattern image to check the discharge on the screen. 
9)  Vary video level of input signal and make sure image is displayed correctly without 
any problems.
 
 
- 39 - 
7. Adjustment Procedure 
 
7-1.  Adjustment Spec. and locations 
 
TCP Ramp Curve adjustment (Y-Board) 
 
 
 
 
 
 
 
 
 
 
 
7-2. Procedure 
1)    Provide Full White pattern signal.   
 
(Change Dip SW from internal to external, as shown in Appendix 3.) 
2)  Set positive probe of Multi-meter to “Vsch” and negative probe to the ground. See 
appendix 2. 
 
Vary VR5004 and set 40 volts +/- 1.0 volt. 
3)  Use an Oscilloscope and display a waveform at test point (Out4) on Y-Buffer board. 
 
Control Trigger and hold the waveform.   
 
(Use V_TOGG on Logic board or V-Sync on B-bd as triggering source is one of idea.) 
 
Adjust controls and set “1 TV field” to proper horizontal size on screen. 
 
Adjust horizontal controls and pick up “1
st
 Sub-Field”, as shown in appendix 1. 
2’nd sub-field 
3’rd sub-field 
1’st sub-field 
Vset Adjustment: 
10 uSec +/- 1 uSec by VR5002 
30 u Sec +/- 1 u Sec by VR5003 
(In 3
rd
 Sub field) 
30 u Sec +/- 1 u Sec by VR5001 
Vsch Adjustment: 
40 volts +/- 1 volt by VR5004 
Page of 51
Display

Click on the first or last page to see other KE-42M1 / KE-MV42A1 / KE-MV42M1 / KE-P42M1 service manuals if exist.