DOWNLOAD Sony KDE-55XBR950 (serv.man2) Service Manual ↓ Size: 5.45 MB | Pages: 84 in PDF or view online for FREE

Model
KDE-55XBR950 (serv.man2)
Pages
84
Size
5.45 MB
Type
PDF
Document
Service Manual
Brand
Device
TV / PANEL MODULE
File
kde-55xbr950-sm2.pdf
Date

Sony KDE-55XBR950 (serv.man2) Service Manual ▷ View online

-41-
 
5.2 X-SUS Circuit Board Removal/Installation Procedure
 
When removing the circuit board after the main power is turned on/off, wait for at 
least four minutes before starting to remove the circuit board. 
If the circuit board removal is started immediately after turning off the main power, it 
can result in electric shock or damage to the circuit due to residual electric charge.   
Remove the circuit board following the steps below. To install the circuit board, reverse the removal 
procedure. 
(1) Remove the fixing screws (M3x8) fixing XBB at 4 locations. 
(2) Pull out the XBB board horizontally and disconnect the connectors (CN26, CN27). 
(3) Release the lock of the FPC connector (CN20) and disconnect the signal cable.   
(4) Disconnect the cables from the VH connectors (CN22, CN23, CN24).   
(5) Remove the fixing screws (M3x8) fixing XSUS at 7 locations. 
(6) Release the space holder (rod) at the 3 locations. 
(7) Remove the X-SUS board.
 
             
 
 
 
 
                                                 
 
 
Pull out 
(4)CN23 
(4)CN24
(3)CN20 
(4)CN22 
(1) 
(1) 
(1) 
(1) 
(2)CN26 
(2)CN27 
(5) 
(5) 
(5) 
(5) 
(5) 
(5) 
(5)
(6) 
(6) 
(6) 
Note 
Pull out 
On handling the FPC connector 
To release the lock, release it by gently flipping it with the nail of the 
thumb or forefinger. Never pinch the lock lever with fingers or hook 
on it (especially with a fingernail). Doing so might damage the lock 
lever.  
Note 
-42-
 
 
 
 
 
 
     
 
 
 
 
 
 
           
      
 
 
Pick up
Pick  up
Note 
 
Pick up and release upper the lock of space 
holder (rod). Moreover, confirm the lock surely
combines intuition when you install the board.
Space holder (rod) 
PCB 
-43-
 
5.3 Y-SUS Circuit Board Removal/Installation Procedure 
When removing the circuit board after the main power is turned on/off, wait for at 
least four minutes before starting to remove the circuit board. 
If the circuit board removal is started immediately after turning off the main power, it 
can result in electric shock or damage to the circuit due to residual electric charge. 
Remove the circuit board following the steps below. To install the circuit board, reverse the removal 
procedure. 
(1) Remove the fixing screws (M3x8) fixing SDM at 6 locations. 
(2) Pull out the SDM board horizontally and disconnect the connectors (CN32, CN33). 
(3) Release the lock of the FPC connector (CN30) and disconnect the signal cable.   
(4) Disconnect the power supply connectors (CN31).   
(5) Remove the fixing screws (M3x8) fixing YSUS at 6 locations. 
(6) Release the space holder (rod) at the 4 locations.
 
(7) Remove the Y-SUS board.
 
             
 
 
 
 
Pull out 
Pull out 
(2)CN32
(2)CN33
(3)CN30
(4)CN31
(1) 
(1) 
(1) 
(1) 
(1) 
(1) 
(5) 
(5) 
(5) 
(5) 
(5)
(5)
(6) 
(6) 
(6) 
(6) 
Note 
On handling the FPC connector 
To release the lock, release it by gently flipping it with the nail of the 
thumb or forefinger. Never pinch the lock lever with fingers or hook 
on it (especially with a fingernail). Doing so might damage the lock 
lever.  
Note 
-44-
 
     
 
 
 
     
 
 
 
 
 
 
 
 
 
 
 
 
 
       
 
 
 
 
 
Pick up and release upper the lock of space 
holder (rod). Moreover, confirm the lock surely
combines intuition when you install the board.
Note 
Pick up
Pick  up
Space holder (rod) 
PCB 
Page of 84
Display

Click on the first or last page to see other KDE-55XBR950 (serv.man2) service manuals if exist.