DOWNLOAD Sony DSC-W515PS Service Manual ↓ Size: 8.65 MB | Pages: 18 in PDF or view online for FREE

Model
DSC-W515PS
Pages
18
Size
8.65 MB
Type
PDF
Document
Service Manual
Brand
Device
Digital Camera
File
dsc-w515ps.pdf
Date

Sony DSC-W515PS Service Manual ▷ View online

DSC-W515PS
1-3
1-5. DC MOTOR WORM A ASSY REPLACING METHOD
1
3
Peel off the FG Seal.
2
4
5
2
Install the Naruto Gear Lubricated Assy and Warm B Lubricated Assy.
1
Solder the two locations.
2
2
Put the FG Seal.
3
INSTALLATION
∗ Tightening torque = 0.049 ± 0.01N•m (0.5 ± 0.1kgf•cm)
∗ Tightening torque = 0.049 ± 0.01N•m (0.5 ± 0.1kgf•cm)
REMOVAL
Remove four screws, and remove the Rear Mirror Plate.
Remove the Naruto Gear Lubricated Assy and Warm B Lubricated Assy.
Remove two screws.
Remove the two soldering, and remove the DC Motor Worm A Assy.
Install the DC Motor Worm A Assy with two screws.
Install the Rear Mirror Plate with the four screws in the order of numbers.
Screw
Screw
Screw
Screw
Rear Mirror Plate
Naruto Gear
Lubricated Assy
Warm B
Lubricated Assy
4
1
2
3
Screw
Screw
Screw
FG Seal
Screw
Screw
Screw
Rear Mirror Plate
Naruto Gear
Lubricated Assy
Warm B
Lubricated Assy
Solder
DC Motor Worm A Assy
Screw
Screw
FG Seal
Solder
DC Motor Worm A Assy
1-6. CAM TUBE BLOCK ASSY AND STRAIGHT TUBE LUBRICATED ASSY AND
1 GROUP FRAME REPLACING METHOD
5
1
2
Remove the 3 Group Frame.
3
Remove the 3 Group Spring.
4
Disconnect the Iris Flexible Board from connector of 2 Frame Assy.
REMOVAL
Remove four screws, and remove the Rear Mirror Plate.
Remove the Naruto Gear Lubricated Assy.
Screw
Screw
Screw
Screw
Rear Mirror Plate
Iris Flexible Board
Flexible Board
of 2 Frame Assy
3 Group Frame
3 Group
Spring
3 Group Frame
3 Group Spring
Warm B
Lubricated Assy
DSC-W515PS
1-4
6
Rotate the Naruto Gear Lubricated Assy and the lens is drawn out.
8
Rotate the Naruto Gear Lubricated Assy and the lens is retractile.
.
7
Pass the Flexible Board through the hole of the Fixed Stationary Tube.
9
Remove the Naruto Gear Lubricated Assy.
q;
Remove the Fixed Stationary Tube Block.
qa
Remove the 2 Group Assy.
Flexible Board
Fixed Stationary Tube
Naruto Gear Lubricated Assy
Naruto Gear
Lubricated Assy
Fixed Stationary Tube Block
2 Group Assy
qs
qd
Rotate (about 120 degree) Straight Tube Lubricated Assy and align the two points of ditches of the Straight Tube Lubricated Assy with 
ditches of the Cam Tube Block Assy, then remove the Straight Tube Lubricated Assy from the Cam Tube Block Assy.
qf
Pour a solvent such as alcohol from two places.
qg
Remove while turning the Ornamental Ring A right and left.
qh
Remove Barrier Assy by disengaging four claws.
qj
Remove the bond at the three points.
qk
Rotate 1 Group Lens Assy and remove it from the 1 Group Frame.
A
Tweezers
Remove the 1 Group Assy. 
1 Group Assy
Straight Tube
Lubricated Assy
Straight Tube
Lubricated Assy
Cam Tube Block Assy
Ditch
Eyepiece Side View
120
Barrier Assy
Claw
Claw
1 Group Lens Assy
1 Group Frame
Bond
Ornamental Ring A
Solvent
DSC-W515PS
1-5
8
Install the Straight Tube Lubricated to the Cam Tube Block Assy. 
9
Rotate (about 120 degree) Straight Tube Lubricated Assy and align two points of ditches of the Straight Tube Lubricated Assy with 
ditches of the Cam Tube Block Assy.
q;
Match three ledges of the 1 Group Assy to three ditches of the Cam Tube Block Assy and install it.
qa
Match three ledges of the 2 Group Assy to three ditches of the Straight Tube Lubricated Assy and install it.
1 Group Assy
1 Group Assy
Straight Tube
Lubricated Assy
Straight Tube
Lubricated Assy
Straight Tube
Lubricated Assy
Cam Tube Block Assy
120
Cam Tube
Block Assy
Cam Tube
Block Assy
Eyepiece Side View
Eyepiece Side View
Eyepiece Side View
Ditch
Ditch
Ditch
Ditch
Ditch
Ledge
Ledge
2 Group Assy
2 Group Assy
1
Install the 1 Group Lens Assy to the 1 Group Frame.
2
Rotate the 1 Group Lens Assy and align triangular sign with round sign. 
3
Apply the bond at the three points.
Note: Use the Super X or the equivalent.
INSTALLATION
6
7
4
Note:
 
The tape must not be wrinkled.
5
With four claws fitted in position, install the Barrier Assy.
Barrier Tape
Barrier Tape
Affix two Barrier Tapes to Barrier Assy.
Barrier Assy
Peel off release papers of Barrier Tapes.
Install Ornamental Ring A and press it lightly.
Barrier Tape
Objective Side View
1 Group Lens Assy
1 Group Frame
1 Group Lens Assy
Bond
Round sign
Triangular sign
Barrier Assy
Claw
Claw
Hole
Barrier
Lever
Ornamental Ring A
DSC-W515PS
1-6
qs
Match three ditches of the Fixed Stationary Tube Block to three convex parts of the Straight Tube Lubricated Assy and install it.
qd
Install the Naruto Gear Lubricated Assy on the Fixed Stationary Tube Block.
qg
Pass the Flexible Board through the hole of the Fixed Stationary Tube.
qf
Rotate the Naruto Gear Lubricated Assy and the lens is drawn out.
qh
Rotate the Naruto Gear Lubricated Assy and the lens is retractile.
Eyepiece Side View
Straight Tube
Lubricated Assy
Fixed Stationary Tube Block
Fixed Stationary
Tube Block
Fixed Stationary
Tube Block
Ditch
Convex Part
Flexible Board
Fixed Stationary Tube
Naruto Gear Lubricated Assy
Naruto Gear 
Lubricated Assy
qj
Install the Warm B Lubricated Assy.
qk
Connect the Iris Flexible Board from connector of 2 Frame Assy.
w;
Install the 3 Group Frame.
ql
Install the 3 Group Spring.
wa
∗ Tightening torque = 0.049 ± 0.01N•m (0.5 ± 0.1kgf•cm)
Install the Rear Mirror Plate with the four screws in the order of numbers.
Warm B
Lubricated Assy
Screw
Screw
Screw
Screw
Rear Mirror Plate
3 Group Frame
3 Group
Spring
3 Group Frame
3 Group Spring
4
1
2
3
Iris Flexible Board
Flexible Board
of 2 Frame Assy
ws
Perform the Flange Back Adjustment after the assembling.
Page of 18
Display

Click on the first or last page to see other DSC-W515PS service manuals if exist.