DOWNLOAD Sony DSC-RX100M4 (serv.man2) Service Manual ↓ Size: 10.6 MB | Pages: 100 in PDF or view online for FREE

Model
DSC-RX100M4 (serv.man2)
Pages
100
Size
10.6 MB
Type
PDF
Document
Service Manual
Brand
Device
Digital Camera / LEVEL 2
File
dsc-rx100m4-sm2.pdf
Date

Sony DSC-RX100M4 (serv.man2) Service Manual ▷ View online

18. Turn the Lubricating Block Assy (B)* counterclockwise to the maximum extent, and detach the Lubricating Block
Assy (B).
*) Use a Lubricating Block Assy (B) that was not installed in the unit.
Lubricating Block Assy (B)
19. Remove the 1st/2nd/3rd group assy from the Stationary Tube. And remove the two screws to detach the DC Motor
Worm Assy.
Stationary Tube
DC Motor Worm Assy
1st/2nd/3rd group assy
20. Turn the Straight Tube Block Assy counterclockwise and remove it from the 1st/2nd/3rd group assy.
Straight Tube Block Assy
Straight Tube
Block Assy
1st/2nd/3rd group assy
21. Remove the 1 Group Frame Block Assy from the 2nd/3rd group assy.
1 Group Frame Block Assy
2nd/3rd group assy
DSC-RX100M4
4-29
Installation
1.
Match the 1st Group Press Block of the 1 Group Frame Block Assy with the cabinet number of the 3 Group Frame
Block Assy and install the 1 Group Frame Block Assy while turning it clockwise.
Note
• If Ornamental Ring (A) and Barrier Block Assy is installed to 1 Group Frame Block Assy, remove them first.
• Be careful not to lose the 1st Group Press Block.
• When installing the 1 Group Frame Block Assy, stop turning it when the convex parts of the 1st Group Press
Block and the 3 Group Frame Block Assy match.
1st Group Press Block
3 Group Frame Block Assy
Cavity number
1 Group Frame Block Assy
2.
Install the Straight Tube Block Assy matching its cabinet number with the flexible boards position of the 3 Group
Frame Block Assy.
Cavity number
Straight Tube Block Assy
Flexible boards
1st/2nd/3rd group assy
Gap
3.
After turning the Straight Tube Block Assy counterclockwise about eight degrees to fully install it, turn the Straight
Tube Block Assy clockwise to the maximum extent to fit the bayonet.
Straight Tube Block Assy
About 8
°
DSC-RX100M4
4-30
4.
Attach the DC Motor Worm Assy and tighten two screws. And install the 1st/2nd/3rd group assy to the Stationary
Tube matching the phase marks as shown in the figure.
Note
• When installing this assy, confirm that the convex parts of the 3 Group Frame Block Assy, 1 Group Frame
Block Assy and the Cam Tube are shown below.
• Confirm that the straight key of the 3 Group Frame Block Assy is fit in the groove of the Stationary Tub. If
the straight key is not fit in the groove, repeat these steps from step 1.
1st/2nd/3rd group assy
3 Group Frame Block Assy
Straight Tube Block Assy
Cam Tube
Convex parts
Gear end
Straight Tube Block Assy
Stationary Tube
Fit to groove
DC Motor 
Worm Assy
5.
Install the Lubricating Block Assy (B)* and turn it clockwise to the maximum extent.
*) Use a Lubricating Block Assy (B) that was not installed in the unit.
Lubricating Block Assy (B)
6.
Pass the two flexible boards through the holes in the Stationary Tube.
Stationary Tube
SS flexible board
SH flexible board
DSC-RX100M4
4-31
7.
Turn the Lubricating Block Assy (B)* counterclockwise to the maximum extent.
*) Use a Lubricating Block Assy (B) that was not installed in the unit.
Lubricating Block Assy (B)
8.
Install the Wheel Lubricating Block Assy, the Gear A Lubricated Assy and the Lubricating Block Assy (B).
Lubricating Block Assy (B)
Gear A Lubricated Assy
Wheel Lubricating Block Assy
9.
Attach the Rear Tube Mirror Block Assy and tighten five screws in numerical order in the following figure.
Rear Tube Mirror Block Assy
1
2
3
4
5
10. Install the connector part of the LF-2091 Flexible Board to the holes of the Stationary Tube.
Holes
Holes
DSC-RX100M4
4-32
Page of 100
Display

Click on the first or last page to see other DSC-RX100M4 (serv.man2) service manuals if exist.