DOWNLOAD Sony XR-C5200R / XR-C5300R / XR-C5300RX Service Manual ↓ Size: 3.53 MB | Pages: 42 in PDF or view online for FREE

Model
XR-C5200R XR-C5300R XR-C5300RX
Pages
42
Size
3.53 MB
Type
PDF
Document
Service Manual
Brand
Device
Car Audio
File
xr-c5200r-xr-c5300r-xr-c5300rx.pdf
Date

Sony XR-C5200R / XR-C5300R / XR-C5300RX Service Manual ▷ View online

9
HEAT  SINK
1
three screws
(PTT2.6 
×
 8)
1
four screws
(PTT2.6 
×
 8)
2
heat sink
10
HOUSING
ARM (SUCTION)
Note:
 Follow the assembly procedure in the numerical order given.
SECTION  3
ASSEMBLY  OF  MECHANISM  DECK
A
 part
C
 part
B
 part
D
 part
8
Hold the hanger by
bending the claw.
6
 Fit projection on D part.
4
 Fit claw on B part.
3
Put the housing 
under 
A part.
5
 Fit projection on C part.
1
 Install the catch to the hanger. 
2
Install the hanger onto 
two claws of the housing.
7
 Hold the hanger by bending the claw. 
hanger
housing
2
Move the arm (suction) in the arrow 
direction and fit on projection.
1
 Fit the arm (suction) on the shaft. 
projection
11
LEVER (LDG-A) / (LDG-B)
GEAR (LDG-FT)
shaft A
shaft B
shaft C
1
Fit the lever (LDG-A) on
shafts 
A – C and install it.
shaft A
shaft B
2
Fit the lever (LDG-B) on  
shafts 
A and B and 
install it.
3
 type-E stop ring 2.0  
gear (LDG-D)
5
 gear (LDG-FT)
6
 polyethylene washer
2
tension spring (LD-2)
2
tension spring (LD-1)
gear (LDG-FB)
lever (LDG-A)
hole
hole
4
Align hole in the gear (LDG-D)
with hole the lever (LDG-A). 
3
Move the lever (LDG-B)
in the arrow direction.
1
12
GUIDE (C)
MOUNTING  POSITION  OF  CAPSTAN/REEL  MOTOR (M901)
2
 guide (C)
1
 three claws
two precision screws
(P2 
×
 2)
capstan/reel motor
(M901)
30˚
Page of 42
Display

Click on the first or last page to see other XR-C5200R / XR-C5300R / XR-C5300RX service manuals if exist.