Sharp MX-6500N / MX-7500N (serv.man10) Service Manual ▷ View online

MX-7500N  MX-RB14 (PAPER PASS UNIT)  8 – 10
E. Connector connection
1) Remove the screw of the upper connector cover and remove
the cover from the main unit.
2) Connect the connector and tighten the screw.
F. Fix the front door
1) Fix the front door (Packed items No.3)  with 6 screws (Packed
items No.12).
NOTE: Attch the front door after install LC13.
G. Fix the upper door stopper R
1)
Install the step screw (Packed items No.14).
2)
Hang the spring (Packed items No. 17).
3)
Slide the upper door stopper R (Packed items No. 5) in the
arrow direction and attach it with the step screw (Packed items
No.14).
6WHSVFUHZ
TopPage
2
: ‘14/Jan
2
MX-7500N  MX-RB14 (PAPER PASS UNIT)  8 – 11
4) Hang the spring on the upper door stopper R.
5) Install the washer large (Packed items No.15), washer small
(Packed items No.16) and screw (Packed items No.12).
H. Attach the upper door
Attach the upper door to the paper pass unit.
NOTE: Attch the Upper door after install LC13.
MX-7500N  MX-LC13 (LARGE CAPACITY TRAYS)  9 – 1
MX-7500N
Service Manual
 
[9] MX-LC13 (LARGE CAPACITY TRAYS)
1.  Unpacking
NOTE: Before installing MX-LC13, the installation of MX-RB14 is
needed.
A. Remove the large capacity trays
1)
Remove the machine from the palette with a forklift or a slope
(DKIT-0367FCZZ).
NOTE: When using a forklift, raise the casters to the top in
order not to break them.
B. Packed items check
*1: Not used for the after July / 2013 production.
*2: Not packed after July / 2013 production
*3: Only 4 pcs of screws are used for after July / 2013 production.
*4: Packed number was changed after July / 2013 production.
2.  Unit production month check
A. Unit production month check
Check the label on the carton box as the figure below.
Before June 2013 production: 
120V series: Less than A35 
200V series: Less than A25
After July 2013 production: 
120V series: More than A46
200V series: More than A36
B. Combination for Installation
The installation procedure is different by the combination of the pro-
duction month of MX-RB14 and MX-LC13.
C. Differences list by combination
No.
Name
Quantity
1
LCT connecting plate F
1
2
LCT connecting plate R
1
3
Height adjustment plate
4
4
Screw (S-tight, M4 x 8)
*3
11 to 8 *4
5
Power cable
1
6
Connecting plate upper
2
7
Positioning plate F
*2
1
8
Positioning plate R
*2
1
9
Connecting plate lower F
*1
1
10
Connecting plate lower R
*1
1
11
Screw (Hex washer S-tight M4 x 18)
4
Combination of RB14 / LC13
Instlattion method
Less than A10 / Less than A35 or A25
Go to [3. Installation 1]
Less tahn A10 / More than A46 or A36
Go to [4. Installation 2]
More than A20 / Less than A35 or A25
Go to [5. Installation 3]
More than A20 / Less thanA46 or A36
Go to [6. Installation 4]
Combination of RB14 / LC13
Positioning Pin
Connection plate
Off center adjustment
RB14 height adjustment
Less than A10 / 
Less than A35 or A25
Use
Use
1. By height adjustment
2. By regulation plates adjustment
Use the adjuster for height 
adjustment.
Less tahn A10 / 
More than A46 or A36
Not use 
Use
1. By connection plate adjustment 
2. By regulation plates adjustment
Use the adjuster for height 
adjustment.
More than A20 / 
Less than A35 or A25
Use
Not used (Already 
attached on RB14)
1. By height adjustment
2. By regulation plates adjustment
No need to adjust the height. 
(lifted by LC13)
More than A20 / 
Less thanA46 or A36
Not use 
Not used (Already 
attached on RB14)
1. By connection plate adjustment 
2. By regulation plates adjustment
No need to adjust the height. 
(lifted by LC13)
TopPage
2
: ‘14/Jan
2
TopPage
3
: ‘14/May
3
3
MX-7500N  MX-LC13 (LARGE CAPACITY TRAYS)  9 – 2
3.  Installation 1
NOTE: Before installation, be sure to turn both the operation and
main power switches off and disconnect the power plug
from the power outlet. Make double sure that the data lamp
on the operation panel does not light up or blink when per-
forming installation.
A. Release the lock
1) Draw out the second tray from the unit.
Push the button of the bottom side of the unit to unlock the
tray, and then slowly pull out the tray until it stops.
2) Remove 3 screws from the tray.
3) For 19 inch size paper, remove the step screw.
4) Slowly insert the tray to the original position.
B. Install to the paper pass unit (MX-RB14)
1)
Attach the LCT connecting plate to the large capacity trays
with the screws (Packed items No.4 S-tight, M4 x 8).
MEMO: The reference label is attached to the plate. Attach it
so that the label can be seen from the outside.
2)
Attach the connection plates lower F/R (Packed items No. 9
and 10) with the screws (Packed items No. 4 S-tight, M4 x 8) to
the relay unit.
3)
Fix the upper mounting plates to the machine with the screws
(Packed items No. 11 S-tight, M4 x 18).
1
Page of 127
Display

Click on the first or last page to see other MX-6500N / MX-7500N (serv.man10) service manuals if exist.