DOWNLOAD Sharp PN-V602 (serv.man2) Service Manual ↓ Size: 2.23 MB | Pages: 27 in PDF or view online for FREE

Model
PN-V602 (serv.man2)
Pages
27
Size
2.23 MB
Type
PDF
Document
Handy Guide
Brand
Device
Monitor / PNV Multi-Display Setup Notes
File
pn-v602-sm2.pdf
Date

Sharp PN-V602 (serv.man2) Handy Guide ▷ View online

CONFIDENTIAL
CONFIDENTIAL
Multi Display Setup Manual <Rev1.0 > September.30, 2010
20
Calibration (5)
How to implement calibration
CONFIDENTIAL
CONFIDENTIAL
Multi Display Setup Manual <Rev1.0 > September.30, 2010
21
Installation tools for attachment and moving to the installation location
Tools for supporting installation (1)
Installation handle 
Installation eyebolt device
Interlocking pipe
Please take care not to add pressure to 
parts other than the ones marked with a 
heavy line in the diagram during 
installation and maintenance.
If pressure is added to other parts, the 
display itself may be distorted or damaged.
Support PN-V601 by holding both corners.
CONFIDENTIAL
CONFIDENTIAL
Multi Display Setup Manual <Rev1.0 > September.30, 2010
22
Tools for supporting installation (2)
Name (temporary)
Use
Image
Installation handle
(UKOG1005MPZZ)
 
For lifting the PN‐V601 up to a high location
This device is inserted into holes on top of PN‐V601 and 
 
enable lifting the PN‐V601 up to a high location during 
 
installation.
2 pieces of this device are necessary per one PN‐V601.
This installation handle is for improving efficiency of 
 
installation. Please use it if necessary.
Installation eyebolt device
(UKOG1006MPZZ)
 
For a crane to lift the PN‐V601 up to a high location.
This device is inserted into holes on top of PN‐V601 and 
 
enable lifting the PN‐V601 up by crane.
2 pieces of this device are necessary per one PN‐V601.
This installation eyebolt device is for improving the 
 
efficiency of installation. Please use it if necessary.
Interlocking pipe
(UKOG‐1007MPZZ)
‐For making it easy to install PN‐V601
It can reduce gap between the top‐to‐bottom of the PN‐V601 
 
and interlock each panel from both on the top and bottom of 
 
the PN‐V601 when installing with a stand etc. 
 
This pipe can 
 
prevent PN‐V601 from having excessive weight load from 
 
above and underneath. 
Please use this interlocking pipe for improving the accuracy 
 
when adjusting the vertical position of displays if necessary. It 
 
is not required for installation.
 
2 pieces of this pipe are 
 
necessary per one PN‐V601.
We will provide following service parts for installation (they are subject to fees)
* if you need above tools, please contact delivery agent or our sales reps.
CONFIDENTIAL
CONFIDENTIAL
Multi Display Setup Manual <Rev1.0 > September.30, 2010
23
Tools for supporting installation (3)
Name (temporary)
Use
Image
Protection cover for the 
 
corner of display
 
(UKOG1008MPZZ)
‐‐
 
Reduce shock while moving and installing
These covers are attached on the two bottom corners 
 
of PN‐V601 to protect PN‐V601 from shock.
It is easy to remove the cover.
 
2 units of this cover are necessary per one PN‐V601. 
Protection spacer (for 
 
landscape)
‐Protection of display
Insert this spacer between the PN‐V601 while  
 
installing the neighboring PN‐V601s. 
(thickness: 1 mm)
This tool is used to avoid damage of the bezel  
 
at the time of installation and the position adjustment of the display.
‐Please take care that the sheet does not extend out of display side.
Protection spacer (for 
 
Portrait)
‐Protection of display
Insert this spacer between the PN‐V601 while  
 
installing neighboring PN‐V601’s.  
(thickness: 0.5 mm)
This tool is used to avoid damage of the bezel  
 
at the installation and the position adjustment of the display.
‐Please take care that the sheet does not extend out of the display side
We will provide following service parts for installation (they are subject to fees)
Gel Sheet
Thickness: 1.0mm
* if you need above tools, please contact delivery agent or our sales reps.
Gel Sheet
Thickness: 0.5mm
Page of 27
Display

Click on the first or last page to see other PN-V602 (serv.man2) service manuals if exist.