DOWNLOAD Panasonic TX-R32LE8K / TX-R32LE8KH Service Manual ↓ Size: 7.57 MB | Pages: 63 in PDF or view online for FREE

Model
TX-R32LE8K TX-R32LE8KH
Pages
63
Size
7.57 MB
Type
PDF
Document
Service Manual
Brand
Device
TV / LH80 CHASSIS
File
tx-r32le8k-tx-r32le8kh.pdf
Date

Panasonic TX-R32LE8K / TX-R32LE8KH Service Manual ▷ View online

5 Chassis Board
5.1. Chassis Installation
 1. Fix 12 screws to ‘A-board’ and ‘P-board’.
Tightening torque should be 50 Ncm to 80 Ncm (5 kgf cm to 8 kgf cm).
 2. Fix connectors G1, G2 and G3 to AT G-board.
 3. Fix 2 screws to the side of AV bracket assembly.
Tightening torque should be 100 Ncm to 130 Ncm (10 kgf cm to 13 kgf cm).
 4. Fix 1 screw to cabinet with power switch PCB bracket.
Tightening torque should be 100 Ncm to 130 Ncm (10 kgf cm to 13 kgf cm).
9
TX-R32LE8K
6 Location of Lead Wiring
6.1. Wire Dressing
= FELT-TMK4G215 = 7 pcs
6.2. Wire Dressing and Connections
CONNECTION
1
2
3
4
5
6
7
8
9
10
11
1
CN 2 ~ P 2
2
A 2 ~ P 4
3
A 1 ~ P 3
4
CN 2 ~ A 6
5
G 1 ~ A 4
6
G 2 ~ A 5
7
V 1 ~ A 7
8
A 12 ~ SPEAKER (L)
9
A 12 ~ SPEAKER (R)
10
P 1 ~ SW 2
10
TX-R32LE8K
7 Disassembly for Service
7.1. AC Code dressing for 2-Pin
7.2. AC Code dressing for 3-Pin
11
TX-R32LE8K
7.3. Chassis Rail Installation
 1. Put on the bottom mounting and fix with 4 screws.
Tightening torque should be 100 N cm - 130 N cm (10 kgf cm to 13 kgf cm).
 2. Stick sponges at chassis rails no.1 and no.3.
 3. Fix 3 pieces of chassis frames and fix 4 screws to the bottom and top mountings.
Tightening torque should be 100 N cm - 130 N cm (10 kgf cm to 13 kgf cm).
= SCREW 8 pcs
12
TX-R32LE8K
Page of 63
Display

Click on the first or last page to see other TX-R32LE8K / TX-R32LE8KH service manuals if exist.