Panasonic CQ-xxx Service Manual / Other ▷ View online
IDC Module 3 : Removal and Re-Installation of the Upper chassis unit.
Removal of the Upper chassis unit
Disconnect the
Loading Motor
ribbon cable from
connector CN301.
Part Two,3
IDC Module 3 : Removal and Re-Installation of the Upper chassis unit.
Removal of the Upper chassis unit
Part Two,4
RIGHT SIDE
BACK SIDE
A.Remove the
two
screws that secure the flex PCB to
chassis.Carefully fold flex cable away from the chassis.
B. Remove the
three
screws and then lift off the side Chassis.
Note that all three screws are the same size.
IDC Module 3 : Removal and Re-Installation of the Upper chassis unit.
Removal of the Upper chassis unit
Remove the
single screw that
connects the
stocker cover
plate to the load
assembly on the
top side of the
chassis.
Part Two,5
IDC Module 3 : Removal and Re-Installation of the Upper chassis unit.
Removal of the Upper chassis unit
Disconnect the
horizontal motor
cable from
connector
CN402 on the
bottom side of
the chassis.
Part Two,6
Click on the first or last page to see other CQ-xxx service manuals if exist.