* note: - Two-way Valve shall be CE marking compliance component.
- Maximum load for the valve is 9.8 VA.
- Maximum load for the valve is 9.8 VA.
5 Three-Way Valve shall be spring and electronic type. Valve's cable shall be (3 × min 0.5 mm
2
), of type
designation 60245 IEC 57 or heavier, or similarly double insulation sheathed cable.
* note: - Shall be CE marking compliance component.
- It shall be directed to heating mode when it is OFF.
- Maximum load for the valve is 9.8 VA.
* note: - Shall be CE marking compliance component.
- It shall be directed to heating mode when it is OFF.
- Maximum load for the valve is 9.8 VA.
6 Room Thermostat cable must be (4 or 3 × min 0.5 mm
2
), double insulation layer of PVC-sheathed or rubber-
sheathed cable.
7 Tank OLP cable must be (2 × min 0.5 mm
2
), double insulation layer of PVC-sheathed or rubber-sheathed
cable.
* note: - if such connection deemed NO necessary for tank OLP, please connect jumper between terminal
* note: - if such connection deemed NO necessary for tank OLP, please connect jumper between terminal
no. 13 and 14.
8 Tank Sensor shall be resistance type, please refer to Graph 5.1 for the characteristic and details of sensor.
Its cable shall be (2 × min 0.3 mm
2
), double insulation layer (with insulation strength of min 30 V) of PVC-
sheathed or rubber-sheathed cable.
9 External Controller shall be connected to 1-pole switch with min 3.0mm contact gap. (connection refer to
Diagram 5.2). Its cable must be (2 × min 0.5 mm
2
), double insulation layer of PVC-sheathed or rubber-
sheathed cable.
* note: - When making such connection, kindly remove the jumper between terminal no. 17 and 18.
- Switch used shall be CE compliance component.
- Maximum operating current shall be less than 3A
* note: - When making such connection, kindly remove the jumper between terminal no. 17 and 18.
- Switch used shall be CE compliance component.
- Maximum operating current shall be less than 3A
rms
.
10 Must install Solar Connection PCB (optional) to indoor unit when Solar Pump Station is utilized. Refer
Solar Connection PCB’s installation instruction for detail of installation.
11 Solar Three-way Valve cable shall be (3 × min 0.5 mm
2
), double insulation layer PVC-sheathed or rubber-
sheathed cable.
12 Solar Pump Station cable shall be (2 × min 0.5 mm
2
), of double insulation PVC-sheathed or rubber-sheathed
cable. Strongly recommended install with maximum length of 10 meter only.
Tank
OLP
Cable
Terminals on the indoor
Lead wire cord
1
2
3
4
5
6
Three-way
Valve Cable
Two-way
Valve Cable
Solar Pump
Station Cable
External
Controller
Cable
7
8
9 10 11 12
13 14 15 16 17 18
19 20 21
22 23
Booster Heater
Cord
Room Thermostat
Cable
Solar Three-way
Valve Cable
Only if Solar Connection PCB installed
Tank
Sensor
Cable
HEAT
C
OOL
N
N
L
L
N
N
O
PEN
O
PEN
CL
O
O
S
E
CL
O
O
S
E
N
CL
O
O
S
E
O
PEN
LN11
N
L
N
L 22
P OWER SUP PLY 2
L B1
L B2
L B3
N
P OWER SUP PLY 1
L A1
L A2
L A3
N
45
A
How to guide the lead wires and power supply cord
(view without internal wiring)
Bind all optional
cables and cords
with this band
Power Supply 2
Power Supply 2
RCCB/ELCB
Earth wire must be longer than other
cables for safety reasons.
Bind all optional cables and cords with this band
Holder (Clamper)
Holder (Clamper)
Power Supply 1
3 phase RCCB
Power Supply 2
3 phase RCCB
Earth wire must
be longer than
other cables for
safety reasons.
Indoor unit bottom
Holder
(Clamper)
Power
Supply 2
Power
Supply 1
Power
Supply 2
Connecting
cables
Bushing
Indoor terminal for
connecting cables
(Only applicable for model
WH-SDC09F3E8)
(Only applicable for model
WH-SDC12F9E8)
50
Solar Three-way Valve
Cable (Optional)
External Control Cable
External Control Cable
(Optional)
Tank Sensor Cable
Tank Sensor Cable
(Optional)
Tank OLP Cable (Optional)
Tank OLP Cable (Optional)
Detail A
Solar Pump Station Cable
(Optional)
Three-way Valve Cable
(Optional)
Two-way Valve Cable
Two-way Valve Cable
(Optional)
Earth wire must be longer
than other cables for safety
reasons.
Room Thermostat Cable
(Optional)
Booster Heater Cord
Booster Heater Cord
(Optional)
11.3.4.1
Wire Stripping and Connecting Requirement
-30
-10
0
10
20
30
-20
16000
14000
12000
10000
14000
12000
10000
8000
˚C
6000
4000
2000
4000
2000
0
Graph 5.1: Tank sensor characteristic
Tank Sensor Resistance Vs Temperature
Re
sist
a
n
ce
(
kΩ
)
Wire stripping
5mm or
more
(gap between
wires)
No loose strand
when insert
Indoor/outdoor
connecting
terminal board
1
0
±
1
m
m
ACCEPT
PROHIBITED
Conductor
over insert
over insert
Conductor not
fully insert
Conductor
fully insert
PROHIBITED
17
18
18
Diagram 5.2: External Controller connecting
diagram
External Controller
Terminal
Switch (ON/OFF)
Remove this
jumper if External
Controller
(Optional) is
connected to the
indoor unit
jumper if External
Controller
(Optional) is
connected to the
indoor unit
11.3.4.2 Connecting
Requirement
For model WH-SDC09F3E8
The equipment’s power supply 1 complies with IEC/EN 61000-3-2.
The equipment’s power supply 2 complies with IEC/EN 61000-3-2.
For model WH-SDC12F9E8
For model WH-SDC12F9E8
The equipment’s power supply 1 complies with IEC/EN 61000-3-2.
The equipment’s power supply 2 complies with IEC/EN 61000-3-2.
The equipment’s power supply 2 shall be connected to a suitable supply network, with the following maximum
permissible system impedance Z
max
at the interface of the point: 0.449 Ω. Please liaise with supply authority to
ensure that power supply 2 is connected to a supply of the impedance or less.
51
11.4 Outdoor
Unit
11.4.1 Install the Outdoor Unit
After selecting the best location, start installation
according to Indoor/Outdoor Unit Installation
Diagram.
1 Fix the unit on concrete or rigid frame firmly
Diagram.
1 Fix the unit on concrete or rigid frame firmly
and horizontally by bolt nut (ø10 mm).
2 When installing at roof, please consider strong
wind and earthquake. Please fasten the
installation stand firmly with bolt or nails.
(Unit in mm)
installation stand firmly with bolt or nails.
(Unit in mm)
140
355
44
620
140
20
2
5
450
(A
nc
hor
p
itc
h
)
(Anchor pitch)
11.4.2 CONNECTING THE PIPING
Model
Piping size (Torque)
Gas
Liquid
WH-SDC09F3E8
WH-UD09FE8
ø15.88 mm
(5/8")
[65 N•m]
ø9.52 mm
(3/8")
[42 N•m]
WH-SDC12F9E8
WH-UD12FE8
Connecting The Piping To Outdoor Unit
Decide piping length and then cut by using pipe cutter.
Remove burrs from cut edge. Make flare after
inserting the flare nut (locate at valve) onto the copper
pipe.
Align center of piping to valves and then tighten with
torque wrench to the specified torque as stated in the
table.
Local pipes can project in any of four directions.
Make holes in the pipe panels for the pipes to
pass through.
Be sure to install the pipe panels to prevent rain
from getting inside the outdoor unit.
[Removing the service panel].
1 Remove the three mounting screws.
2 Slide the service panel downward to release
[Removing the service panel].
1 Remove the three mounting screws.
2 Slide the service panel downward to release
the pawls.
After this, pull the service panel toward you to remove
it.
it.
CAUTION
Do not over tighten, over tightening cause gas leakage.
Front pipe panel
Rear pipe
panel
Mounting
screws
Service panel
Rear direction
Side panel
Downward
direction
Forward
direction
Close the tube joining area
with putty heat insulator
(local supply) without any
gap as shown in right figure.
(To prevent insects or small
animal entering.)
Be sure to use two spanners
to tighten.
(If the nuts are over
tightened, it may cause
the flares to break
or leak.)
Do not attach
the spanners
here
the spanners
here
Putty or Heat
insulator
(local supply)
52
CUTTING AND FLARING THE PIPING
1 Please cut using pipe cutter and then remove the burrs.
2 Remove the burrs by using reamer. If burrs is not removed, gas leakage may be caused.
2 Remove the burrs by using reamer. If burrs is not removed, gas leakage may be caused.
Turn the piping end down to avoid the metal powder entering the pipe.
3 Please make flare after inserting the flare nut onto the copper pipes.
When properly flared, the internal surface of the flare
will evenly shine and be of even thickness. Since the
flare part comes into contact with the connections,
carefully check the flare finish.
will evenly shine and be of even thickness. Since the
flare part comes into contact with the connections,
carefully check the flare finish.
Bar
0 – 0.5 mm
Copper pipe
3. To flare
Bar
Red arrow mark
Handle
Core
Yoke
Clamp handle
Reamer
2. To remove burrs
Point down
Pipe
1. To cut
Improper flaring
Inclined
damaged
Cracked
Surface
Uneven
thickness
11.4.3 Evacuation of the Equipment
WHEN INSTALLING AN AIR-TO-WATER HEAT PUMP, BE SURE TO EVACUATE THE AIR INSIDE THE INDOOR
UNIT AND PIPES in the following procedure.
UNIT AND PIPES in the following procedure.
Lo
Hi
Vacuum
pump
adaptor
Vacuum
pump
OPEN
CLOSE
Close
Gas side
Liquid side
Outdoor unit
Three-way valve
Two-way valve
Close
Indoor unit
1 Connect a charging hose with a push pin to the Low side of a charging set and the service port of the 3-way
valve.
o
Be sure to connect the end of the charging hose with the push pin to the service port.
2 Connect the center hose of the charging set to a vacuum pump with check valve, or vacuum pump and
vacuum pump adaptor.
3 Turn on the power switch of the vacuum pump and make sure that the needle in the gauge moves from
0 cmHg (0 MPa) to –76 cmHg (–0.1 MPa). Then evacuate the air approximately ten minutes.
4 Close the Low side valve of the charging set and turn off the vacuum pump. Make sure that the needle in the
gauge does not move after approximately five minutes.
Note: BE SURE TO FOLLOW THIS PROCEDURE IN ORDER TO AVOID REFRIGERANT GAS LEAKAGE.
Note: BE SURE TO FOLLOW THIS PROCEDURE IN ORDER TO AVOID REFRIGERANT GAS LEAKAGE.
5 Disconnect the charging hose from the vacuum pump and from the service port of the 3-way valve.
6 Tighten the service port caps of the 3-way valve at a torque of 18 N•m with a torque wrench.
7 Remove the valve caps of both of the 2-way valve and 3-way valve. Position both of the valves to “OPEN”
6 Tighten the service port caps of the 3-way valve at a torque of 18 N•m with a torque wrench.
7 Remove the valve caps of both of the 2-way valve and 3-way valve. Position both of the valves to “OPEN”
using a hexagonal wrench (4 mm).
8 Mount valve caps onto the 2-way valve and the 3-way valve.
o
• Be sure to check for gas leakage.
CAUTION
If gauge needle does not move from 0 cmHg (0 MPa) to –76 cmHg (–0.1 MPa), in step above take the following measure:
If the leak stops when the piping connections are tightened further, continue working from step .
If the leak does not stop when the connections are retightened, repair the location of leak.
Do not release refrigerant during piping work for installation and reinstallation. Take care of the liquid refrigerant, it may cause
Do not release refrigerant during piping work for installation and reinstallation. Take care of the liquid refrigerant, it may cause
frostbite.
Click on the first or last page to see other WH-SDC09F3E8 / WH-SDC12F9E8 / WH-SDC14F9E8 / WH-SDC16F9E8 / WH-UD09FE8 / WH-UD12FE8 / WH-UD14FE8 / WH-UD16FE8 service manuals if exist.