DOWNLOAD LG WM2150HS Service Manual ↓ Size: 11.91 MB | Pages: 54 in PDF or view online for FREE

Model
WM2150HS
Pages
54
Size
11.91 MB
Type
PDF
Document
Service Manual
Brand
Device
Washing Machine
File
wm2150hs.pdf
Date

LG WM2150HS Service Manual ▷ View online

36
9-2. DOOR LOCK SWITCH ASSEMBLY
Wiring
diagram
Circuit in the MAIN PWB / Wiring Diagram
MAIN PWB
Vdc
Vac
MICOM
12V
12V
4
1
3
2
4
1
3
2
Relay
Relay
NA4
1
2
3
4
1
2
3
4
2
3
4
PTC
PTC
Door switch
SOLENOID
5
YL
BL
RD
BK
AC
Common
terminal
of Valve
Function
The Door Lock Switch Assembly consists of a Heating PTC, a Bimetal,
a Protection PTC, and a Solenoid. It locks the door during a wash cycle.
1. Operation for door closing
- After the system turns on, PTC heating starts up through terminal 2~4’s
authorizing the power on.
- After PTC heating starts up and before solenoid operation is driven,
force the system to the off position through CAM.
Door close
- Authorizing one impulse through terminal 3~4 (PTC & solenoid) will
make the door locked.
- Door lock is detected when switches in terminal 4~5 are set closed.
CAM rotation will forcibly clear off the connection.
The maximum, allowable number of impulse authorizations is 2.
Upon the third authorization of the impulse, the position of CAM goes
back to the door-open position.
- Authorizing the impulse occurs in 4.5 seconds upon input for max
performance and two authorization processes are allowed at most.
Normal operation period of PTC heating: 1.5 – 5 seconds.
(Defects from the development process.)
2. Operation for door opening
- With a temporary stop, door automatically opens by CAM rotations after
authorizing the impulse from the terminal 3 ~ 4 and the power turns 
off – maximum of 3 times of the authorizing period.
- Upon the fourth authorization of the impulse, the position of CAM goes
back to the door-close position.
37
Test
points
Result
Test Points
(2) to (4)
(3) to (4)
(4) to (5)
(2) to (4)
Result
700-1500 
60-90 
Infinity
120 Vac
Remarks
At 77
°F 
(25
°C
)
At 77
°F 
(25
°C
)
Voltage Input
(2)
(3)
(4)
(5)
38
9-3. STATOR ASSEMBLY
Wiring
diagram
Circuit in the MAIN PWB / Wiring Diagram
MAIN PWB
MICOM
Ha
12V
NA1NA
WH
WH
GND
MOT
OR
Hb
Ha
RD
RD
BL
BL
GY
YL
w
w
v
u
v
u
BL
RD
RD
RD4
IPM
GY
YL
w
u
v
BL
RD
1
1 1
2
3
4
2
3
1
2
3
1
2
3
1
2
3
1
2
3
1
3
2
2
1
3
4
1
2
3
4
5
1
2
3
4
5
2
3
4
1
2
3
4
Hb
Function
Test points
(Windings)
Result
(Windings)
The DD motor can be driven from stopped to maximum speed in infinite steps in
either direction.
There are 36 poles on the stator; 12 permanent magnets spaced around the rotor.
There are no brushes to wear out. Unlike a more traditional brushless motor, the
rotor surrounds the stator rather than being attached to it.
Test Points
Result
(1) to (2)
(2) to (3)
(3) to (1)
5-15 
5-15 
5-15 
WINDINGS
HALL SENSOR
(1)
(2)
(3)
39
Test point 
and 
Result
(Hall 
Sensor)
The hall sensor determines the speed and direction of the motor.
It also can read that the load is off balance when the drum speed fluctuates.
- Voltage Testing Hall Sensor at Stator
If measuring voltage from the Main PCB Assembly to the Hall Sensor, use the
following steps:
1. Unplug power cord.
2. Remove rear washer panel.
3. Locate Hall sensor connector on the stator behind the rotor.
4. Place meter leads on terminals 5 to 4, white to gray.
5. Plug in power cord, close door, and press power button.
DO NOT PRESS START!
6. You should measure 10 to 15 Vdc. If 10 to 15 Vdc is present, control board,
white wire, and gray wire are OK! If not follow testing output voltages on control
board in next section.
(1) (3) (5)
(2) (4)
Page of 54
Display

Click on the first or last page to see other WM2150HS service manuals if exist.