LG 50PQ12-UD (CHASSIS:PU92B) Service Manual ▷ View online
- 9 -
SPECIFICATIONS
3) 50H3
No.
1
Number of Pixels
1920 (H) X 1080 (V) (1pixel=3 RGB cells)
576 (H) X 576 (V)
192 (H) X 576 (V) (R/G/B Cell basis)
1105.9(H) X 622.1(V) ± 0.5mm
1170(H) X 679.5(V) X 50.3(D) ± 1mm
RGB Closed type
(R)4096 X (G)4096 X (B)4096
170. ± 1.0Kg(Net 1EA)
16:9
Typical 1000cd/m
2
(1/100 White Window pattern at center)
Max. 500W(Full-White)
more than 60,000 Hours of continuous operation
Life-time is defined as the
time when the brightness
level becomes half of its
initial value.
time when the brightness
level becomes half of its
initial value.
Average 80:1(In a bright room with 100Lux at center)
Typical 1,000,000:1(In a dark room 1/100 White Window pattern at center)
Typical 1,000,000:1(In a dark room 1/100 White Window pattern at center)
Pixel Pitch
Cell Pitch
Display Area
Outline Dimension
Pixel Type
Number of Gradations
Weight
Aspect Ratio
Peak Brightness
Contrast Ratio
Power Consumption
Expected Life-time
2
3
4
5
6
7
8
9
10
11
12
13
Item
Spec.
Remark
4) 60H3
No.
1
Number of Pixels
1920 (H) X 1080 (V) (1pixel=3 RGB cells)
690 (H) X 690 (V)
230 (H) X 690 (V) (Base on G cell)
1324.8(H) X 745.2(V) ± 0.5mm
1380(H) X 816.6(V) X 62(D) ± 1mm
RGB Closed type
(R)256 X (G)256 X (B)256
(R)1024 X (G)1024 X (B)1024
(R)1024 X (G)1024 X (B)1024
30.2 ± 1Kg(Net 1EA)
314 ± 3Kg(8EA/1BOX)
314 ± 3Kg(8EA/1BOX)
16:9
Typical 1000cd/m
2
(1/100 White Window pattern at center)
Max. 700W(Full-White)
more than 60,000 Hours of continuous operation
Life-time is defined as the
time when the brightness
level becomes half of its
initial value.
time when the brightness
level becomes half of its
initial value.
Average 150:1(In a bright room with 100Lux at center)
Typical 30,000:1(In a dark room 1/100 White Window pattern at center)
Typical 30,000:1(In a dark room 1/100 White Window pattern at center)
Pixel Pitch
Cell Pitch
Display Area
Outline Dimension
Pixel Type
Number of
Gradations
Weight
Aspect Ratio
Peak Brightness
Contrast Ratio
Power
Consumption
Expected Life-time
2
3
4
5
6
7
8
9
10
11
12
13
Item
Spec.
Remark
- 10 -
ADJUSTMENT INSTRUCTIONS
1. Application Range
This spec sheet is applied to all of the PU92B Chassis.
2. Specification
(1) Because this is not a hot chassis, it is not necessary to use
an isolation transformer. However, the use of isolation
transformer will help protect test instrument.
transformer will help protect test instrument.
(2) Adjustment must be done in the correct order.
(3) The adjustment must be performed in the circumstance of
(3) The adjustment must be performed in the circumstance of
25±5
c
C of temperature and 65±10% of relative humidity if
there is no specific designation.
(4) The input voltage of the receiver must keep 100~240V,
50/60Hz.
(5) The receiver must be operated for about 5 minutes prior to
the adjustment when module is in the circumstance of over
15cC
- In case of keeping module is in the circumstance of 0cC,
15cC
- In case of keeping module is in the circumstance of 0cC,
it should be placed in the circumstance of above 15cC for
2 hours
2 hours
- In case of keeping module is in the circumstance of below
-20cC, it should be placed in the circumstance of above
15cC for 3 hours.
15cC for 3 hours.
1) Press the POWER ON KEY on R/C for adjustment.
2) Press the ADJ KEY on R/C and enter EZ ADJUST.
2) Press the ADJ KEY on R/C and enter EZ ADJUST.
Select “4. WHITE PATTERN” by using
D
/
E
(CH +/-) and
select “White” by using
F
/
G
(VOL +/-)
- Set is activated HEAT run without signal generator in this
mode.
- Single color pattern (RED / BLUE / GREEN) of HEAT RUN
MODE uses to check panel.
Caution: If you turn on a still screen more than 20 minutes
(Especially digital pattern, cross hatch pattern), an after
image may be occur in the black level part of the
screen.
image may be occur in the black level part of the
screen.
Caution: Set up “RF mode(noise)” after PCB assembly adjustment.
3. Download
(1) Execute ISP program “Mstar ISP Utility” and then click
“Config” tab.
(2) Set as below, and then click “Auto Detect” and check “OK”
message If display “Error”, Check connect computer, jig,
and set.
and set.
(3) Click “Connect” tab. If display “Can’t” , Check connect
computer, jig, and set.
(4) Click “Read” tab, and then load download file(XXXX.bin)
by clicking “Read”
(5) Click “Auto” tab and set as below
(6) Click “Run”.
(7) After downloading, check “OK” message.
(6) Click “Run”.
(7) After downloading, check “OK” message.
- 11 -
4. ADC Process
4-1. Auto ADC Process (using DFT)
PC (for communication through RS-232C) UART Baud rate
: 115200 bps
Command : aa 00 00 (Start factory mode)
Command : ad 00 10 (working Auto ADC)
Command : aa 00 90 (End of Auto ADC Process)
: 115200 bps
Command : aa 00 00 (Start factory mode)
Command : ad 00 10 (working Auto ADC)
Command : aa 00 90 (End of Auto ADC Process)
4-2. Manual ADC Process using Service
Remocon
After enter Service Mode by pushing “ADJ” key, execute
“ADC Adjust” by pushing “
“ADC Adjust” by pushing “
G
” key at “0. ADC CALIBRATION”.
4-3. Confirmation
(1) We confirm whether “0xBF(480i)/0xC8(1080i)” address of
EEPROM “0xA2” is “0xAA” or not.
(2) If “0xBF(480i)/0xC8(1080i)” address of EEPROM “0xA2”
isn’t “0xAA”, we adjust once more
(3) We can confirm the ADC values from “0xB9 ~ 0xBE(480i) /
0xC2 ~ (1080i)” addresses in a page “0xA2”
(4) Manual ADC Confirmation using Service Remocon. After
enter Service Mode by pushing “INSTART” key,
5. DDC EDID Write Confirmation
Caution: Each PCB assembly must be checked by check JIG set.
(Because power PCB Assembly damages to PDP
Module, especially be careful)
Module, especially be careful)
Caution: Set up “RF mode(noise)” before voltage adjustment.
6. POWER PCB Ass’y Voltage
Adjustment
(Va, Vs voltage Adjustment)
6-1. Test Equipment:
D.M.M 1EA
6-2. Connection Diagram for Measuring
Refer to Fig.1, Fig 2, Fig 3
6-3. Adjustment Method
(1) 42”, 50” Vs Adjustment (refer fig.1)
1) Connect + terminal of D.M.M. to Vs pin of P811, connect
- terminal to GND pin of P811.
2) After turning VR901,voltage of D.M.M adjustment as
same as Vs voltage which on label of panel right/top
(deviation; ±0.5V)
(deviation; ±0.5V)
ADJUSTMENT INSTRUCTIONS
(Fig.1) 42/50inch Power PCB Assy Voltage Adjustment
- 12 -
(2) 50FHD Va Adjustment (refer fig. 2)
1) After receiving 100% Full White Pattern, HEAT RUN.
2) Connect + terminal of D.M.M. to Va pin of P811, connect -
2) Connect + terminal of D.M.M. to Va pin of P811, connect -
terminal to GND pin of P811.
3) After turning VR501,voltage of D.M.M adjustment as same
as Va voltage which on label of panel right/top (deviation;
±0.5V)
±0.5V)
(3) 50FHD Vs Adjustment (refer fig. 2)
1) Connect + terminal of D. M..M. to Vs pin of P811, connect -
terminal to GND pin of P811.
2) After turning VR901, voltage of D.M.M adjustment as same
as Vs voltage which on label of panel right/top (deviation ;
±0.5V)
±0.5V)
(4) 60FHD Va Adjustment (refer fig. 3)
1) After receiving 100% Full White Pattern, HEAT RUN.
2) Connect + terminal of D.M.M. to Va pin of P812, connect -
2) Connect + terminal of D.M.M. to Va pin of P812, connect -
terminal to GND pin of P812.
3) After turning VR901,voltage of D.M.M adjustment as same
as Va voltage which on label of panel right/top (deviation;
±0.5V)
±0.5V)
(5) 60FHD Vs Adjustment (refer fig. 3)
1) Connect + terminal of D. M..M. to Vs pin of P812, connect -
terminal to GND pin of P812.
2) After turning VR951, voltage of D.M.M adjustment as same
as Vs voltage which on label of panel right/top (deviation ;
±0.5V)
±0.5V)
7. DDC EDID Write
MODEL NAME: LG TV (Not necessary)
Caution: Please only check write status in Instart-menu
7-1. Manual Download(using DFT)
PC(for communication through RS-232C), UART baud rate:
115200 bps
Command : aa 00 00 (Start Factory mode)
Command : ae 00 10 (Download All EDID)
Command : aa 00 90 (End of Factory mode)
115200 bps
Command : aa 00 00 (Start Factory mode)
Command : ae 00 10 (Download All EDID)
Command : aa 00 90 (End of Factory mode)
7-2. Manual EDID D/L using Service Remocon
(1) After enter Service Mode by pushing “ADJ” key, select “4.
EDID D/L”.
(2) Finally execute “START” by pushing “
EDID D/L”.
(2) Finally execute “START” by pushing “
G
” or “
9
”key.
ADJUSTMENT INSTRUCTIONS
(Fig. 2) 50FHD Power PCB Assy Voltage Adjustment
(Fig. 3) 60FHD Power PCB Assy Voltage Adjustment
Click on the first or last page to see other 50PQ12-UD (CHASSIS:PU92B) service manuals if exist.