DOWNLOAD LG GR-S352QVC Service Manual ↓ Size: 894.17 KB | Pages: 29 in PDF or view online for FREE

Model
GR-S352QVC
Pages
29
Size
894.17 KB
Type
PDF
Document
Service Manual
Brand
Device
Refrigerator
File
gr-s352qvc.zip
Date

LG GR-S352QVC Service Manual ▷ View online

- 15 -
NO.
ITEMS
CONTENTS AND SPECIFICATIONS
REMARKS
WELDING
(1) H 30
ROD
(1) 
• Chemical Ingredients
• Recommend H34 containing 34% Ag in the
(1) • 
Ag: 30%, Cu: 27%, Zn: 23%, Cd: 20%
• 
Service Center.
(1) 
• Brazing Temperature: 710~840°C
(2) Bcup-2
(1) 
• Chemical Ingredients
(1) • 
Cu: About 93%
(1) • 
P: 6.8~7.5%
(1) • 
The rest: within 0.2%
(1) 
• Brazing Temperature: 735~840°C
FLUX
(1) 
• Ingredients and how to make
• Make amount for only a day. 
( 1 )
(1) ••
Borax 30%
• 
Holding period: 1 day
(1) ••
Borax 35%
• Close the cover of container to prevent dust
(1) • 
Fluoridation kalium: 35%
• 
putting in the FLUX.
(1) • 
Water: 4%
• Keep it in a stainless steel container.
(1) • 
Mix the above ingredients and boil until
(1) • 
they are transformed into liquid.
DRIER
(1) Assemble the drier within 30min.
• Don't keep the drier in a outdoor because
ASM
(1) 
after unpacking.
• 
humidity damages to it.
(2) Keep the unpacked drier at the temperature
of 80~100°C.
VACUUM
(1) When measuring with pirant Vacuum 
• Apply M/C Vacuum Gauge without fail.
(1 )
gauge of charging M/C, vacuum 
• Perform vacuum operation until a proper
(1 )
degree is within 1 Torr.
• 
vacuum degree is built up.
(2) If the vacuum degree of the cycle inside is
• If a proper vacuum degree isn't built up,
• 
(2) 
10 Torr. below for low pressure and 20 Torr.
• 
check the leakage from
(2) 
for high pressure, it says no vacuum 
• 
the Cycle Pipe line part and
(2) 
leakage state.
• 
Quick Coupler Connecting part.
(3) Vacuum degree of vacuum pump must be
(3) 
0.05 Torr. below after 5 min.
(4) Vacuum degree must be same to the 
value described item (2) above for more than 
20 min.
(1) The pressure of dry air must be more
than 12~16Kg/cm
2
(2) Temperature must be more than
-20~-70°C.
(3) Keep the pressure to 12~6Kg/cm
2
also
(3)
when substituting dry air for Nitrogen Gas.
NIPPLE
(1) Check if gas leaks with soapy water. 
• Check if gas leaks from connecting part of
AND
(2) Replace Quick Coupler in case of leakage.
• 
Coupler.
COUPLER
PIPE
(1)
• Put all Joint Pipe in a clean box and 
(1)• 
cover tightly with the lid so that dust or
(1)• 
humidity is not inserted.
1
2
3
4
5
6
7
DRY AND
AIR
NITROGEN
GAS
General Control of Refrigerating Cycle
- 15 -
NO.
ITEMS
CONTENTS AND SPECIFICATIONS
REMARKS
WELDING
(1) H 30
ROD
(1) 
• Chemical Ingredients
• Recommend H34 containing 34% Ag in the
(1) • 
Ag: 30%, Cu: 27%, Zn: 23%, Cd: 20%
• 
Service Center.
(1) 
• Brazing Temperature: 710~840°C
(2) Bcup-2
(1) 
• Chemical Ingredients
(1) • 
Cu: About 93%
(1) • 
P: 6.8~7.5%
(1) • 
The rest: within 0.2%
(1) 
• Brazing Temperature: 735~840°C
FLUX
(1) 
• Ingredients and how to make
• Make amount for only a day. 
( 1 )
(1) ••
Borax 30%
• 
Holding period: 1 day
(1) ••
Borax 35%
• Close the cover of container to prevent dust
(1) • 
Fluoridation kalium: 35%
• 
putting in the FLUX.
(1) • 
Water: 4%
• Keep it in a stainless steel container.
(1) • 
Mix the above ingredients and boil until
(1) • 
they are transformed into liquid.
DRIER
(1) Assemble the drier within 30min.
• Don't keep the drier in a outdoor because
ASM
(1) 
after unpacking.
• 
humidity damages to it.
(2) Keep the unpacked drier at the temperature
of 80~100°C.
VACUUM
(1) When measuring with pirant Vacuum 
• Apply M/C Vacuum Gauge without fail.
(1 )
gauge of charging M/C, vacuum 
• Perform vacuum operation until a proper
(1 )
degree is within 1 Torr.
• 
vacuum degree is built up.
(2) If the vacuum degree of the cycle inside is
• If a proper vacuum degree isn't built up,
• 
(2) 
10 Torr. below for low pressure and 20 Torr.
• 
check the leakage from
(2) 
for high pressure, it says no vacuum 
• 
the Cycle Pipe line part and
(2) 
leakage state.
• 
Quick Coupler Connecting part.
(3) Vacuum degree of vacuum pump must be
(3) 
0.05 Torr. below after 5 min.
(4) Vacuum degree must be same to the 
value described item (2) above for more than 
20 min.
(1) The pressure of dry air must be more
than 12~16Kg/cm
2
(2) Temperature must be more than
-20~-70°C.
(3) Keep the pressure to 12~6Kg/cm
2
also
(3)
when substituting dry air for Nitrogen Gas.
NIPPLE
(1) Check if gas leaks with soapy water. 
• Check if gas leaks from connecting part of
AND
(2) Replace Quick Coupler in case of leakage.
• 
Coupler.
COUPLER
PIPE
(1)
• Put all Joint Pipe in a clean box and 
(1)• 
cover tightly with the lid so that dust or
(1)• 
humidity is not inserted.
1
2
3
4
5
6
7
DRY AND
AIR
NITROGEN
GAS
General Control of Refrigerating Cycle
- 15 -
NO.
ITEMS
CONTENTS AND SPECIFICATIONS
REMARKS
WELDING
(1) H 30
ROD
(1) 
• Chemical Ingredients
• Recommend H34 containing 34% Ag in the
(1) • 
Ag: 30%, Cu: 27%, Zn: 23%, Cd: 20%
• 
Service Center.
(1) 
• Brazing Temperature: 710~840°C
(2) Bcup-2
(1) 
• Chemical Ingredients
(1) • 
Cu: About 93%
(1) • 
P: 6.8~7.5%
(1) • 
The rest: within 0.2%
(1) 
• Brazing Temperature: 735~840°C
FLUX
(1) 
• Ingredients and how to make
• Make amount for only a day. 
( 1 )
(1) ••
Borax 30%
• 
Holding period: 1 day
(1) ••
Borax 35%
• Close the cover of container to prevent dust
(1) • 
Fluoridation kalium: 35%
• 
putting in the FLUX.
(1) • 
Water: 4%
• Keep it in a stainless steel container.
(1) • 
Mix the above ingredients and boil until
(1) • 
they are transformed into liquid.
DRIER
(1) Assemble the drier within 30min.
• Don't keep the drier in a outdoor because
ASM
(1) 
after unpacking.
• 
humidity damages to it.
(2) Keep the unpacked drier at the temperature
of 80~100°C.
VACUUM
(1) When measuring with pirant Vacuum 
• Apply M/C Vacuum Gauge without fail.
(1 )
gauge of charging M/C, vacuum 
• Perform vacuum operation until a proper
(1 )
degree is within 1 Torr.
• 
vacuum degree is built up.
(2) If the vacuum degree of the cycle inside is
• If a proper vacuum degree isn't built up,
• 
(2) 
10 Torr. below for low pressure and 20 Torr.
• 
check the leakage from
(2) 
for high pressure, it says no vacuum 
• 
the Cycle Pipe line part and
(2) 
leakage state.
• 
Quick Coupler Connecting part.
(3) Vacuum degree of vacuum pump must be
(3) 
0.05 Torr. below after 5 min.
(4) Vacuum degree must be same to the 
value described item (2) above for more than 
20 min.
(1) The pressure of dry air must be more
than 12~16Kg/cm
2
(2) Temperature must be more than
-20~-70°C.
(3) Keep the pressure to 12~6Kg/cm
2
also
(3)
when substituting dry air for Nitrogen Gas.
NIPPLE
(1) Check if gas leaks with soapy water. 
• Check if gas leaks from connecting part of
AND
(2) Replace Quick Coupler in case of leakage.
• 
Coupler.
COUPLER
PIPE
(1)
• Put all Joint Pipe in a clean box and 
(1)• 
cover tightly with the lid so that dust or
(1)• 
humidity is not inserted.
1
2
3
4
5
6
7
DRY AND
AIR
NITROGEN
GAS
General Control of Refrigerating Cycle
- 15 -
NO.
ITEMS
CONTENTS AND SPECIFICATIONS
REMARKS
WELDING
(1) H 30
ROD
(1) 
• Chemical Ingredients
• Recommend H34 containing 34% Ag in the
(1) • 
Ag: 30%, Cu: 27%, Zn: 23%, Cd: 20%
• 
Service Center.
(1) 
• Brazing Temperature: 710~840°C
(2) Bcup-2
(1) 
• Chemical Ingredients
(1) • 
Cu: About 93%
(1) • 
P: 6.8~7.5%
(1) • 
The rest: within 0.2%
(1) 
• Brazing Temperature: 735~840°C
FLUX
(1) 
• Ingredients and how to make
• Make amount for only a day. 
( 1 )
(1) ••
Borax 30%
• 
Holding period: 1 day
(1) ••
Borax 35%
• Close the cover of container to prevent dust
(1) • 
Fluoridation kalium: 35%
• 
putting in the FLUX.
(1) • 
Water: 4%
• Keep it in a stainless steel container.
(1) • 
Mix the above ingredients and boil until
(1) • 
they are transformed into liquid.
DRIER
(1) Assemble the drier within 30min.
• Don't keep the drier in a outdoor because
ASM
(1) 
after unpacking.
• 
humidity damages to it.
(2) Keep the unpacked drier at the temperature
of 80~100°C.
VACUUM
(1) When measuring with pirant Vacuum 
• Apply M/C Vacuum Gauge without fail.
(1 )
gauge of charging M/C, vacuum 
• Perform vacuum operation until a proper
(1 )
degree is within 1 Torr.
• 
vacuum degree is built up.
(2) If the vacuum degree of the cycle inside is
• If a proper vacuum degree isn't built up,
• 
(2) 
10 Torr. below for low pressure and 20 Torr.
• 
check the leakage from
(2) 
for high pressure, it says no vacuum 
• 
the Cycle Pipe line part and
(2) 
leakage state.
• 
Quick Coupler Connecting part.
(3) Vacuum degree of vacuum pump must be
(3) 
0.05 Torr. below after 5 min.
(4) Vacuum degree must be same to the 
value described item (2) above for more than 
20 min.
(1) The pressure of dry air must be more
than 12~16Kg/cm
2
(2) Temperature must be more than
-20~-70°C.
(3) Keep the pressure to 12~6Kg/cm
2
also
(3)
when substituting dry air for Nitrogen Gas.
NIPPLE
(1) Check if gas leaks with soapy water. 
• Check if gas leaks from connecting part of
AND
(2) Replace Quick Coupler in case of leakage.
• 
Coupler.
COUPLER
PIPE
(1)
• Put all Joint Pipe in a clean box and 
(1)• 
cover tightly with the lid so that dust or
(1)• 
humidity is not inserted.
1
2
3
4
5
6
7
DRY AND
AIR
NITROGEN
GAS
General Control of Refrigerating Cycle
Page of 29
Display