DOWNLOAD LG LS-F1260NL Service Manual ↓ Size: 3.85 MB | Pages: 68 in PDF or view online for FREE

Model
LS-F1260NL
Pages
68
Size
3.85 MB
Type
PDF
Document
Service Manual
Brand
Device
Air Conditioner
File
ls-f1260nl.zip
Date

LG LS-F1260NL Service Manual ▷ View online

-33-
1) Air purging
Air and moisture remaining in the refrigerant system
have undesirable effects as indicated below.
Pressure in the system rises.
Operating current rises.
Cooling(or heating) efficiency drops.
Moisture in the refrigerant circuit may freeze and
block capillary tubing.
Water may lead to corrosion of parts in the
refrigeration system.
Therefore, the indoor unit and tubing between the
indoor and outdoor unit must be leak tested and
evacuated to remove any noncondensables and
moisture from the system.
2) Air purging with vacuum pump
1. Preparation
Check that each tube(both liquid and gas side tubes)
between the indoor and outdoor units have been properly
connected and all wiring for the test run has been
completed. Remove the service valve caps from both the
gas and the liquid side on the outdoor unit. Note that both
the liquid and the gas side service valves on the outdoor
unit are kept closed at this stage.
2. Leak test
Connect the manifold valve(with pressure
gauges) and dry nitrogen gas cylinder to this
service port with charge hoses.
Pressurize the system to no more than 150
P.S.I.G. with dry nitrogen gas and close the
cylinder valve when the gauge reading reached
150 P.S.I.G. Next, test for leaks with liquid soap.
Lo Hi
Indoor unit
Outdoor unit
Manifold valve
Charge hose
Nitrogen gas
cylinder(in vertical
standing position)
Pressure 
gauge
Do a leak test of all joints of the tubing(both
indoor and outdoor) and both gas and liquid side
service valves.
Bubbles indicate a leak. Be sure to wipe off the
soap with a clean cloth.
After the system is found to be free of leaks,
relieve the nitrogen pressure by loosening the
charge hose connector at the nitrogen cylinder.
When the system pressure is reduced to normal,
disconnect the hose from the cylinder.
Be sure to use a manifold valve for air purging.
If it is not available, use a stop valve for this purpose.
The "Hi" knob of the manifold valve must always be
kept close.
To avoid nitrogen entering the refrigerant system in
a liquid state, the top of the cylinder must be higher
than its bottom when you pressurize the system.
Usually, the cylinder is used in a vertical standing
position.
CAUTION
CAUTION
5. Air Purging
-34-
3. Evacuation
Connect the charge hose end described in the
preceding steps to the vacuum pump to
evacuate the tubing and indoor unit.
Confirm the "Lo" knob of the manifold valve is
open. Then, run the vacuum pump.
The operation time for evacuation varies with
tubing length and capacity of the pump.
The following table shows the time required for
evacuation.
When the desired vacuum is reached, close the
"Lo" knob of the manifold valve and stop the
vacuum pump.
4. Finishing the job
With a service valve wrench, turn the valve stem
of liquid side valve counter-clockwise to fully
open the valve.
Turn the valve stem of gas side valve counter-
clockwise to fully open the valve.
Loosen the charge hose connected to the gas
side service port slightly to release the pressure,
then remove the hose.
Replace the flare nut and its bonnet on the gas
side service port and fasten the flare nut
securely with an adjustable wrench. This process
is very important to prevent leakage from the
system.
Replace the valve caps at both gas and liquid
side service valves and fasten them tight.
This completes air purging with a vacuum pump.
The air conditioner is now ready to test run.
(1) Remove the caps from the 2-way and 3-way valves.
(2) Remove the service-port cap from the 3-way valve.
(3) To open the 2-way valve turn the valve stem
counterclockwise approximately 90°, wait for about 2~3
sec, and close it.
(4) Apply a soap water or a liquid neutral detergent on the
indoor unit connection or outdoor unit connections by a
soft brush to check for leakage of the connecting points
of the piping.
(5) If bubbles come out, the pipes have leakage.
Soap water method
Control
cover 
Liquid side
(Smaller diameter)
Gas side
(Bigger diameter)
2-way valve
(open)
3-way valve
(close)
Cap
Service port cap
Hexagonal wrench
Terminal block
(pillar terminal)
Required time for evacuation
when 30 gal/h vacuum pump is used
10 min. or more
15 min. or more
If tubing length is less
than 10m (33 ft)
If tubing length is longer
than 10m (33 ft)
Indoor unit
Outdoor unit
Lo Hi
Manifold valve
Vacuum pump
Pressure 
gauge
Open
Close
-35-
6. Test Running
1. Check that all tubing and wiring have been properly
connected.
2. Check that the gas and liquid side service valves
are fully open.
1. Prepare remote control
Remove the battery cover
by pulling it according to the
arrow direction.
Insert new batteries making
sure that the (+) and (–) of
battery are installed correctly.
Reattach the cover by
pushing it back into position.
NOTE:
• Use 2 AAA(1.5volt) batteries. Do not use
rechargeable batteries.
• Remove the batteries from the remote control if
the system is not going to be used for a long time.
2. Settlement of outdoor unit
Anchor the outdoor unit with a bolt and
nut(ø10mm) tightly and horizontally on a
concrete or rigid mount.
When installing on the wall, roof or rooftop,
anchor the mounting base securely with a nail or
wire assuming the influence of wind and
earthquake.
In the case when the vibration of the unit is
conveyed to the hose, secure the unit with an
anti-vibration rubber.
3. Evaluation of the performance
Operate unit for 15~20 minutes, then check the
system refrigerant charge:
1. Measure the pressure of the gas side service
valve.
2. Measure the temperature of the intake and
discharge of air.
NOTE: If the actual pressure are higher than shown,
the system is most likely over-charged, and
charge should be removed. If the actual
pressure are lower than shown, the system is
most likely undercharged, and charge should
be added.
The air conditioner is now ready for use.
Bolt
Tubing connection
Outside ambient TEMP The pressure of the gas side service valve
35°C(95°F)
4.5~5.5kg/cm
2
G(63.9~78.1 P.S.I.G.)
This is performed when the unit is to be relocated
or the refrigerant circuit is serviced.
Pump Down means collecting all refrigerant in the
outdoor unit without loss in refrigerant gas.
CAUTION:
Be sure to perform Pump Down procedure with the
unit cooling mode.
Pump Down Procedure
1. Connect a low-pressure gauge manifold hose to the
charge port on the gas side service valve.
2. Open the gas side service valve halfway and purge the
air from the manifold hose using the refrigerant gas.
3. Close the liquid side service valve(all the way in).
4. Turn on the unit's operating switch and start the
cooling operation.
5. When the low-pressure gauge reading becomes 1 to
0.5kg/cm2 G(14.2 to 7.1 P.S.I.G.), fully close the gas
side valve stem and then quickly turn off the unit. At
that time, Pump Down has been completed and all
refrigerant gas will have been collected in the outdoor
unit.
PUMP DOWN
3. Ensure the difference between the intake
temperature and the discharge is more than 8°C
(Cooling) or reversely (Heating).
4. For reference; the gas side pressure of optimum
condition is as below.(Cooling)
Discharge 
temperature
Discharge air
Intake temperature
-24-
Installation Plate
Marking-off line
Thread
Weight
Type "A" screw
Hole center
Right rear piping
Left rear piping
ø70mm
ø70mm
50mm
20mm
20mm
80mm
9k Btu
5-7mm
(0.2~0.3")
Indoor
WALL
Outdoor
• Drill the piping hole with a ø70mm hole core drill.
Drill the piping hole at either the right or the left with
the hole slightly slanted to the outdoor side.
For right rear piping and left rear piping, draw a
line in the direction of the arrow marked "C". The
meeting point of the two lines is the center of the
hole.
4) Drill a hole in the wall
The position of the center of the hole.
C
C
C
C
Left holecore position
Right holecore position
A,B
A,B,C
C
D
D
A,B,D
C
A
B,D
C
ø70mm
Left rear piping
Right rear piping
Hole Center
Installation plate
12k Btu
3) How to fix installation plate
The wall you select should be strong and solid enough to prevent
vibration
1. Mount the installation plate on the wall with four
type A screws. If mounting the unit on a concrete
wall, use anchor bolts.
Mount the installation plate horizontally by
aligning the centerline using a level.
2. Measure the wall and mark the centerline. It is also
important to use caution concerning the location
of the installation plate-routing of the wiring to
power outlets is through the walls typically.
Drilling the hole through the wall for piping
connections must be done safely.
Page of 68
Display

Click on the first or last page to see other LS-F1260NL service manuals if exist.