JBL ES 150PW (serv.man3) EMC - CB Certificate ▷ View online
Report No:W-N-1002010-CY-01-1
Telecom Technology Center
33
Blue arrow mark for Contact Discharge and red arrow mark for Air Discharge
Blue arrow mark for Contact Discharge and red arrow mark for Air Discharge
Report No:W-N-1002010-CY-01-1
Telecom Technology Center
34
6.7.6 Test Result
EUT:
Wireless Speaker Amplifier
Location:
ESD Room
Temperature:
22.1 ℃
Relative Humidity:
50 %RH
Pressure:
1022 mbar
Test Power:
230V AC, 50Hz
Test Mode:
Sound play Mode
Energy-Storage Capacitor :150 pF
Discharge Resistor :330
Ω
Contact Discharge Times :10 times/each condition
Air Discharge Times :10 times/each condition
Air Discharge Times :10 times/each condition
Discharge Mode
Contact Discharge
Air Discharge
ESD Voltage
2 kV
4 kV
kV
2 kV
4 kV
8 kV
Points\Result\Polarity
+
-
+
-
+
-
+
-
+
-
+
-
VCP
B B B B ---
---
---
---
--- --- --- ---
HCP
B B B B ---
---
---
---
--- --- --- ---
Blue arrow mark points
B B B B ---
---
---
---
--- --- --- ---
Red arrow mark points
--- ---
---
---
---
---
B B B B B B
Note: (1) P/N denotes the Positive/Negative polarity of the output voltage.
(2) Test condition:Direct / Indirect (HCP/VCP) discharges: Minimum 50 times
(Positive/Negative) at each point. Air discharges: Minimum 10 times
(Positive/Negative) at each point.
(Positive/Negative) at each point.
(3) Test location(s) in which discharge (Air and contact discharge) to be applied
illustrated by photos shown in next page(s)
(4) The Indirect (HCP/VCP) discharges description of test point as
following:1.left side 2.right side 3.front side 4.rear side
(5) N/A - denotes test is not applicable in this test report
(6) Criteria A: There was no change operated with initial operating during the
(6) Criteria A: There was no change operated with initial operating during the
test.
(7) Criteria B: The EUT function loss during the test, but self-recoverable after
the test.
(8) Criteria C: The system shut down during the test.
Report No:W-N-1002010-CY-01-1
Telecom Technology Center
35
6.8 EFT/BURST TESTING
6.8.1 Test Specification
Basic Standard:
IEC 61000-4-4
Test Voltage:
Power Line:1 kV, Coaxial Cable:0.5 kV
Impulse Wave shape :
5/50 ns
Burst Duration:
15 ms
Burst Period:
300 ms
Test Duration:
Not less than 1 min.
6.8.2 Test Procedure
The EUT and support equipment, are placed on a table that is 0.8 meter above a metal
ground plane measured 1m*1m min. and 0.65mm thick min.
The other condition as following manner:
a. The length of power cord between the coupling device and the EUT should not
exceed 1 meter.
b. Both positive and negative polarity discharges were applied.
c. The duration time of each test sequential was 1 minute
d. For the actual test configuration, please refer to the related Item –EUT Test Photos.
c. The duration time of each test sequential was 1 minute
d. For the actual test configuration, please refer to the related Item –EUT Test Photos.
6.8.3 Deviation From Test Standard
No deviation
Report No:W-N-1002010-CY-01-1
Telecom Technology Center
36
6.8.4 Test Setup
Note:
TABLE-TOP EQUIPMENT
The configuration consisted of a wooden table (0.8m high) standing on the Ground
Reference Plane. The GRP consisted of a sheet of aluminum (at least 0.25mm thick
and 2.5m square) connected to the protective grounding system. A minimum distance
of 0.5m was provided between the EUT and the walls of the laboratory or any other
metallic structure.
Click on the first or last page to see other ES 150PW (serv.man3) service manuals if exist.